Study guide
6.3 Main & Supplementary Protective Bonding Continuity
City & Guilds 2391-52 Combined Inspection & Testing of Electrical Installations Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the 2391-52 Exam 1.2 How to Use This Guide & Open-Book Exam Strategy
2 Chapter 2: Statutory & Non-Statutory Documents
2.1 Statutory Documents 2.2 Non-Statutory Documents 2.3 Roles, Responsibilities & the Statutory/Non-Statutory Relationship
3 Chapter 3: Certification & Documentation
3.1 The Electrical Installation Certificate (EIC) & Schedules 3.2 The Minor Electrical Installation Works Certificate (MEIWC) 3.3 The Electrical Installation Condition Report (EICR) & Schedules 3.4 Why the Documents Exist: Reasons, Information Needed, Recording & Retention
4 Chapter 4: Initial Verification & Safe Isolation
4.1 Safe Isolation & Safety Management 4.2 Visual Inspection Requirements 4.3 Initial Verification: Requirements & Process 4.4 Additions & Alterations to an Existing Installation 4.5 Inspection Methods: The Senses, Verifying Items & IP Classification
5 Chapter 5: Sequence of Tests & Test Instruments
5.1 The Correct Sequence of Tests 5.2 Test Instruments: Selection, Calibration & Accuracy 5.3 Factors That Affect Test Results & Tests That May Be Unnecessary at Periodic Inspection
6 Chapter 6: Continuity Testing
6.1 Continuity of Protective Conductors (R1+R2) 6.2 Continuity of Ring Final Circuits (r1, rn, r2) 6.3 Main & Supplementary Protective Bonding Continuity
7 Chapter 7: Insulation Resistance & Polarity
7.1 Insulation Resistance Testing 7.2 Polarity Verification 7.3 Verifying SELV, PELV & Electrical Separation
8 Chapter 8: Earth Fault Loop Impedance
8.1 Ze & Zs Measurement 8.2 Zs Limits, Disconnection Times & the 0.8 Rule 8.3 Prospective Fault Current (PFC/PSCC)
9 Chapter 9: RCD & Earth Electrode Testing
9.1 RCD Testing 9.2 Earth Electrode Resistance on TT Systems
10 Chapter 10: Periodic Inspection & EICR Reporting
10.1 Purpose, Scope & Limitations of Periodic Inspection 10.2 Sampling & Extent of Inspection 10.3 Observation Classification Codes C1/C2/C3/FI 10.4 Outcomes, Inspection Intervals & Completing the EICR
11 Chapter 11: Phase Sequence, Functional Testing & Voltage Drop
11.1 Check of Phase Sequence 11.2 Functional Testing 11.3 Verification of Voltage Drop
12 Chapter 12: The 2391-502 Practical Assignment
12.1 The Practical Assignment & Establishing a Safe System of Work 12.2 Carrying Out the Practical: Inspection, Tests, Verification & Documentation
6.3 Main & Supplementary Protective Bonding Continuity
Key Takeaways Explain This Topic AI
Main protective bonding connects the MET to extraneous-conductive-parts entering the building (water, gas, oil, structural steel); supplementary bonding is local to a zone such as a bathroom
The long-lead (wander-lead) method is used for bonding continuity: one lead on the bonding conductor at the MET, the long lead probed at the far end; null the long lead first
GN3 gives a practical target of 0.05 Ω for bonding continuity — low, but not a fixed BS 7671 pass/fail figure
Regulation 544.1.1 sets main bonding at half the earthing conductor csa with a 6 mm² minimum for non-PME supplies; for PME supplies the conductor is sized from the supply neutral using Table 54.8, giving a 10 mm² minimum
- Undersized or discontinuous PME bonding is a serious defect typically coded C2 on an EICR
- Last updated: August 2026
Main Protective Bonding
Main protective bonding connects the main earthing terminal (MET) of the installation to extraneous-conductive-parts that enter the building — metallic water service pipes, gas service pipes, oil supply pipes, structural steelwork, and lightning protection system down-conductors. Its purpose is to minimise dangerous potential differences between exposed-conductive-parts of the installation and extraneous metalwork under fault conditions, so that anyone touching two metal parts simultaneously does not receive a shock from a voltage appearing between them.
The key word is extraneous — a part that is conductive, enters the building from outside, and can introduce a potential (including earth potential). A metal pipe that enters the building is extraneous; a metal trunking system entirely contained within the installation is not extraneous (it is an exposed-conductive-part and is earthed, not bonded, to the MET). Deciding what is extraneous is an inspection judgement made before the continuity test.
What to Test
Main bonding continuity is verified from the MET to each extraneous-conductive-part where the bonding conductor terminates. Every main bonding conductor must be tested:
- Bonding connection Typical location
- Water service pipe Where the pipe enters the building, consumer's side of the stopcock
- Gas service pipe Consumer's side of the meter, before any branch
- Oil service pipe At the point of entry / oil supply line
- Structural steel At the main steel frame entry
- Lightning protection At the LP system earth terminal (per BS EN 62305)
- The Long-Lead (Wander-Lead) Method
You cannot link both ends of a bonding conductor the way you link phase and CPC for an R1+R2 test — the "far end" is a buried metal pipe or a structural frame, not an accessory you can get back into. The standard method is the long-lead (wander-lead) method :
Null the long lead — connect the long lead to the standard lead and record or zero its resistance. A 10 m wander lead can add 0.3 to 0.5 Ω; not nulling it makes every reading falsely high.
Connect one instrument lead to the bonding conductor at the MET.
Run the long lead to the far end of the extraneous-conductive-part and clip or probe it there.
Measure — the reading is the resistance of the bonding conductor plus any connection resistance at the far end.
The same low-resistance ohmmeter is used as for protective-conductor continuity (test current ≥ 0.2 A, resolution ≤ 0.01 Ω).
Acceptance Value
GN3 10th Edition gives a practical target of 0.05 Ω for main bonding continuity — a low value confirming a sound, low-resistance connection. This is not a fixed BS 7671 pass/fail figure (there is no single tabulated maximum for bonding conductor resistance); the requirement is that the bonding connection is continuous and of low resistance , and 0.05 Ω is the recognised on-site benchmark. A reading significantly above 0.05 Ω suggests a loose connection, corrosion, or an undersized conductor and must be investigated before the installation is certified.
Main Bonding Conductor Sizes
Two different rules apply, and confusing them is a classic exam trap.
Non-PME supplies (TN-S, TT) are sized by Regulation 544.1.1 : the main protective bonding conductor must have a cross-sectional area of not less than half that of the earthing conductor , subject to a minimum of 6 mm² , and it need not exceed 25 mm² where the conductor is copper.
PME (TN-C-S) supplies are sized from the copper-equivalent cross-sectional area of the supply neutral (PEN) conductor , using Table 54.8 :
- Copper-equivalent csa of the supply neutral Minimum main protective bonding conductor (copper)
- 35 mm² or less 10 mm²
- Over 35 mm² up to 50 mm² 16 mm²
- Over 50 mm² up to 95 mm² 25 mm²
- Over 95 mm² up to 150 mm² 35 mm²
- Over 150 mm² 50 mm²
The conductor never has to exceed 50 mm² copper or copper-equivalent, and the copper-equivalent conversion must be done first where the supply neutral is aluminium.
Note which conductor drives the PME calculation: it is the neutral of the supply, not the line conductor and not the consumer tails you can see most easily. Do not confuse Table 54.8 with Table 54.7 , which gives the minimum size of a buried earthing conductor according to whether it is protected against corrosion and mechanical damage.
For a typical domestic PME (TN-C-S) supply with a 25 mm² neutral, the bonding conductor must therefore be at least 10 mm² copper (or copper-equivalent) because the PME earthed-neutral can carry diverted neutral currents, and the bonding must be robust enough to handle them safely. Undersized PME bonding is a serious defect and a common EICR observation, typically coded C2 (potentially dangerous). Always confirm the system type (TN-S, TN-C-S, or TT) from the supply characteristic before selecting or verifying bonding conductor sizes.
Supplementary Equipotential Bonding
Supplementary equipotential bonding connects exposed-conductive-parts and extraneous-conductive-parts within a particular location — most commonly a bathroom, shower room, swimming pool, or other special location. Its purpose is to reduce touch voltage further within that local zone, supplementing the main bonding where the disconnection time cannot be met or where the location adds extra risk (e.g. wet skin lowers body resistance).
Supplementary bonding is tested for continuity between the bonded parts within the location: for example, between the exposed metalwork of a bathroom luminaire and the bonded metallic pipework, or between the shower tray waste and any exposed structural metal. The same low-resistance ohmmeter is used, with leads nulled, and the same 0.05 Ω practical target applies.
Main Bonding vs Supplementary Bonding
- Aspect Main protective bonding Supplementary equipotential bonding
- Scope Whole installation, at the MET A single location (bathroom, special location)
Connects MET to extraneous-conductive-parts entering the building Exposed and extraneous parts within the location
Conductor size Reg 544.1.1 (6 mm² min, non-PME) or Table 54.8 (10 mm² min, PME) Reg 544.2: not less than the smallest protective conductor connected, with a 2.5 mm² minimum if mechanically protected or 4 mm² if not
- Purpose Equipotential zone for the whole installation Reduced touch voltage in a local higher-risk zone
- Test method Long-lead from MET Between bonded parts in the zone
- Why Bonding Continuity Matters
Both main and supplementary bonding exist to hold an equipotential zone — a volume in which all conductive parts that a person could touch simultaneously are at substantially the same potential. If bonding continuity is lost, a fault can raise one metal part to a dangerous potential while a nearby part remains at earth potential, and the touch voltage between them can be lethal. The continuity test verifies that the equipotential zone is intact across every bonded part.
Key Points to Remember
Main bonding connects the MET to extraneous-conductive-parts entering the building; supplementary bonding is local to a location.
Use the long-lead method ; null the long lead first — its resistance is much higher than a standard lead.
0.05 Ω is the GN3 practical target for bonding continuity — low, but not a fixed BS 7671 pass/fail.
Reg 544.1.1 gives 6 mm² minimum for non-PME; Table 54.8 gives 10 mm² minimum for PME (TN-C-S) with a supply neutral of 35 mm² or less.
Undersized or discontinuous PME bonding is a serious defect, typically coded C2 on an EICR.