Study guide

7.3 Verifying SELV, PELV & Electrical Separation

City & Guilds 2391-52 Combined Inspection & Testing of Electrical Installations Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 About the 2391-52 Exam 1.2 How to Use This Guide & Open-Book Exam Strategy

2 Chapter 2: Statutory & Non-Statutory Documents

2.1 Statutory Documents 2.2 Non-Statutory Documents 2.3 Roles, Responsibilities & the Statutory/Non-Statutory Relationship

3 Chapter 3: Certification & Documentation

3.1 The Electrical Installation Certificate (EIC) & Schedules 3.2 The Minor Electrical Installation Works Certificate (MEIWC) 3.3 The Electrical Installation Condition Report (EICR) & Schedules 3.4 Why the Documents Exist: Reasons, Information Needed, Recording & Retention

4 Chapter 4: Initial Verification & Safe Isolation

4.1 Safe Isolation & Safety Management 4.2 Visual Inspection Requirements 4.3 Initial Verification: Requirements & Process 4.4 Additions & Alterations to an Existing Installation 4.5 Inspection Methods: The Senses, Verifying Items & IP Classification

5 Chapter 5: Sequence of Tests & Test Instruments

5.1 The Correct Sequence of Tests 5.2 Test Instruments: Selection, Calibration & Accuracy 5.3 Factors That Affect Test Results & Tests That May Be Unnecessary at Periodic Inspection

6 Chapter 6: Continuity Testing

6.1 Continuity of Protective Conductors (R1+R2) 6.2 Continuity of Ring Final Circuits (r1, rn, r2) 6.3 Main & Supplementary Protective Bonding Continuity

7 Chapter 7: Insulation Resistance & Polarity

7.1 Insulation Resistance Testing 7.2 Polarity Verification 7.3 Verifying SELV, PELV & Electrical Separation

8 Chapter 8: Earth Fault Loop Impedance

8.1 Ze & Zs Measurement 8.2 Zs Limits, Disconnection Times & the 0.8 Rule 8.3 Prospective Fault Current (PFC/PSCC)

9 Chapter 9: RCD & Earth Electrode Testing

9.1 RCD Testing 9.2 Earth Electrode Resistance on TT Systems

10 Chapter 10: Periodic Inspection & EICR Reporting

10.1 Purpose, Scope & Limitations of Periodic Inspection 10.2 Sampling & Extent of Inspection 10.3 Observation Classification Codes C1/C2/C3/FI 10.4 Outcomes, Inspection Intervals & Completing the EICR

11 Chapter 11: Phase Sequence, Functional Testing & Voltage Drop

11.1 Check of Phase Sequence 11.2 Functional Testing 11.3 Verification of Voltage Drop

12 Chapter 12: The 2391-502 Practical Assignment

12.1 The Practical Assignment & Establishing a Safe System of Work 12.2 Carrying Out the Practical: Inspection, Tests, Verification & Documentation

7.3 Verifying SELV, PELV & Electrical Separation

Key Takeaways Explain This Topic AI

Regulation 643.4 requires the separation of SELV, PELV and electrically separated circuits to be verified by an insulation resistance measurement, with values taken from Table 64

SELV must be separated from other circuits AND from earth; PELV is separated from other circuits but is intentionally earthed - the test regime reflects that difference

SELV and PELV circuits are tested at 250 V DC with a minimum of 0.5 MOhm; the barrier between a separated circuit and other circuits is tested at the higher circuit voltage, needing 1.0 MOhm at 500 V DC

Electrical separation supplies a single item of equipment from an isolating transformer to BS EN 61558-2-4, with the separated circuit left unearthed so a single fault cannot produce a shock current

Regulation 643.5 applies only where non-conducting location is the protective measure: floors and walls must measure at least 50 kOhm up to 500 V, or 100 kOhm above 500 V

Last updated: August 2026

Three Protective Measures That Share One Test

Ordinary low-voltage circuits are protected by automatic disconnection of supply : a fault produces enough current to operate a device quickly. SELV , PELV and electrical separation work on a completely different principle — they prevent a dangerous shock current from arising in the first place, by keeping the circuit apart from everything else.

Because all three depend on separation , all three are verified the same way: by measuring the insulation resistance across the separation . That is what Regulation 643.4 requires — the separation of the live parts from those of other circuits and from Earth is verified by a measurement of insulation resistance, with the values taken from Table 64 .

Measure Full name Earthed? What must be proved

SELV Separated Extra-Low Voltage No — no earth connection anywhere Separated from all other circuits and from Earth

  • PELV Protective Extra-Low Voltage Yes — intentionally connected to earth Separated from all other circuits
  • Electrical separation — The separated circuit is not earthed Separated from all other circuits and from Earth

The source matters as much as the wiring. SELV and PELV must come from a safety isolating transformer to BS EN 61558-2-6 (or BS EN 61558-2-8 ), or an equivalent source such as a motor generator, a battery, or an electronic supply meeting the same requirements. Electrical separation uses an isolating transformer to BS EN 61558-2-4 . A basic double-wound transformer with no such marking is neither.

What SELV and PELV Actually Require

SELV is the strictest arrangement. There is no connection to earth at any point — not on the live conductors, and not on any exposed-conductive-part of the SELV circuit. Because neither pole is referenced to earth, a person touching one live conductor while standing on the ground completes no circuit.

PELV is identical except that the circuit is earthed, usually because the equipment needs an earth reference (control circuits and some instrumentation). PELV therefore does not offer the same protection against a single touch to a live conductor, and BS 7671 places additional requirements on it in higher-risk locations.

For both, the wiring must be kept apart from other circuits — separate enclosures, or cables insulated for the highest voltage present, and no shared multicore unless the multicore is insulated for the highest voltage. Plugs and socket-outlets for SELV and PELV must not be interchangeable with those of any other system, so extra-low voltage equipment cannot be plugged into a 230 V outlet.

Voltage limits

The nominal voltage must not exceed 50 V AC or 120 V ripple-free DC . In locations containing a bath or shower, and in other special locations, lower limits apply.

The Test

The instrument is the same insulation resistance tester used in section 7.1, but the connections and the selected voltage differ.

  • What is being proved Test voltage Minimum resistance
  • SELV circuit conductors to the exposed-conductive-parts and to Earth 250 V DC 0.5 MΩ
  • PELV circuit conductors to other circuits 250 V DC 0.5 MΩ

Between the SELV/PELV circuit and the live parts of the higher-voltage circuit feeding the source 500 V DC (the voltage of the higher circuit) 1.0 MΩ

Between an electrically separated circuit and other circuits and Earth 500 V DC for a 230/400 V system 1.0 MΩ

The principle behind the two rows in the middle is worth stating plainly: the barrier is tested at the voltage of the higher circuit it has to withstand, not at the voltage of the extra-low voltage circuit it protects. Testing the transformer’s primary-to-secondary separation at 250 V would not prove it can hold off 230 V with a margin.

Procedure

Isolate and prove dead , then disconnect the extra-low voltage equipment where the manufacturer’s data requires it — SELV and PELV circuits commonly feed electronics that 500 V DC would destroy.

Test within the extra-low voltage circuit at 250 V DC — live conductors to each other, and live conductors to the exposed-conductive-parts and Earth for SELV.

Test across the separation at the higher circuit’s voltage — primary to secondary of the source, and the separated circuit to other circuits and to Earth.

Record each value on the schedule of test results, identifying which separation each figure refers to.