9.2 Earth Electrode Resistance on TT Systems
City & Guilds 2391-52 Combined Inspection & Testing of Electrical Installations Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the 2391-52 Exam 1.2 How to Use This Guide & Open-Book Exam Strategy
2 Chapter 2: Statutory & Non-Statutory Documents
2.1 Statutory Documents 2.2 Non-Statutory Documents 2.3 Roles, Responsibilities & the Statutory/Non-Statutory Relationship
3 Chapter 3: Certification & Documentation
3.1 The Electrical Installation Certificate (EIC) & Schedules 3.2 The Minor Electrical Installation Works Certificate (MEIWC) 3.3 The Electrical Installation Condition Report (EICR) & Schedules 3.4 Why the Documents Exist: Reasons, Information Needed, Recording & Retention
4 Chapter 4: Initial Verification & Safe Isolation
4.1 Safe Isolation & Safety Management 4.2 Visual Inspection Requirements 4.3 Initial Verification: Requirements & Process 4.4 Additions & Alterations to an Existing Installation 4.5 Inspection Methods: The Senses, Verifying Items & IP Classification
5 Chapter 5: Sequence of Tests & Test Instruments
5.1 The Correct Sequence of Tests 5.2 Test Instruments: Selection, Calibration & Accuracy 5.3 Factors That Affect Test Results & Tests That May Be Unnecessary at Periodic Inspection
6 Chapter 6: Continuity Testing
6.1 Continuity of Protective Conductors (R1+R2) 6.2 Continuity of Ring Final Circuits (r1, rn, r2) 6.3 Main & Supplementary Protective Bonding Continuity
7 Chapter 7: Insulation Resistance & Polarity
7.1 Insulation Resistance Testing 7.2 Polarity Verification 7.3 Verifying SELV, PELV & Electrical Separation
8 Chapter 8: Earth Fault Loop Impedance
8.1 Ze & Zs Measurement 8.2 Zs Limits, Disconnection Times & the 0.8 Rule 8.3 Prospective Fault Current (PFC/PSCC)
9 Chapter 9: RCD & Earth Electrode Testing
9.1 RCD Testing 9.2 Earth Electrode Resistance on TT Systems
10 Chapter 10: Periodic Inspection & EICR Reporting
10.1 Purpose, Scope & Limitations of Periodic Inspection 10.2 Sampling & Extent of Inspection 10.3 Observation Classification Codes C1/C2/C3/FI 10.4 Outcomes, Inspection Intervals & Completing the EICR
11 Chapter 11: Phase Sequence, Functional Testing & Voltage Drop
11.1 Check of Phase Sequence 11.2 Functional Testing 11.3 Verification of Voltage Drop
12 Chapter 12: The 2391-502 Practical Assignment
12.1 The Practical Assignment & Establishing a Safe System of Work 12.2 Carrying Out the Practical: Inspection, Tests, Verification & Documentation
9.2 Earth Electrode Resistance on TT Systems
Key Takeaways Explain This Topic AI
A TT system earths via an earth electrode (rod/plate) into the ground, not via the DNO's earth — an RCD is almost always required for ADS because soil resistance is high
Regulation 411.5.3 carries a note that a value of RA exceeding 200 Ω may not be stable, so 200 Ω is the practical ceiling whatever the RCD rating
Table 41.5 TT compliance (Reg 411.5.3): Ra × IΔn ≤ 50 V, so Zs ≤ 50/IΔn = 1667 Ω for a 30 mA RCD
The fall-of-potential (3-point / 62%) method is the accurate dead method — the potential probe at 62% of the electrode-to-current-probe distance gives the true Ra
The 2-wire live method (Ra ≈ Ze with main bonding disconnected) is a quick approximation, less accurate than fall-of-potential
Last updated: August 2026
TT Systems and the Earth Electrode
A TT system earths the installation via an earth electrode (a rod or plate driven into the ground), not via the distribution network operator's (DNO) earth terminal. Because soil resistance is high and variable, the earth-electrode resistance ( Ra ) is usually too high for ADS (automatic disconnection of supply) to be achieved by an overcurrent protective device alone — so an RCD is almost always required on TT installations to meet the disconnection time.
The TT arrangement is common where the DNO does not provide an earth (typical for overhead supplies in rural areas) or where the consumer opts for an independent electrode. The electrode forms the return path for earth-fault current through the general mass of earth, and the quality of that path is what Ra quantifies.
Why Measure Ra
Measuring Ra confirms the electrode provides a stable, low-enough resistance for the RCD to operate and that touch voltage on exposed-conductive-parts stays safe during an earth fault. An unstable or high-resistance electrode can leave dangerous touch voltage on accessible metalwork long enough to cause harm, and can prevent the RCD from achieving its disconnection time under real fault conditions.
Ra also varies with season and soil moisture — a reading taken in wet winter conditions may not hold through a dry summer. This is why the stability guidance exists as well as the absolute Zs limit.
Acceptable Values
Two distinct limits apply, and they are not interchangeable:
RA ≤ 200 Ω — BS 7671 Regulation 411.5.3 carries a note that a value of RA exceeding 200 Ω may not be stable , and GN3 and the On-Site Guide repeat it. Above 200 Ω, seasonal variation in soil moisture can push an already-high value higher still. This is a stability ceiling, not a Table 41.5 figure, and it is not conditioned on the rating of the RCD.
TT compliance via Table 41.5 (Reg 411.5.3) : Ra × IΔn ≤ 50 V, i.e. Zs ≤ 50/IΔn. For a 30 mA RCD, Zs ≤ 1667 Ω (50 ÷ 0.03). On TT, Zs is dominated by Ra (Zs ≈ Ra + R1+R2, and R1+R2 is small), so Ra must be well within 1667 Ω for the RCD to satisfy the disconnection criterion.
The 200 Ω stability limit is the practical target you design and verify to; the 1667 Ω figure is the regulatory maximum that the RCD/Zs combination must not exceed. An electrode at 400 Ω might technically allow the RCD to operate (below 1667 Ω) but would be flagged as unstable and unsuitable for a reliable installation.