Study guide
9.1 RCD Testing
City & Guilds 2391-52 Combined Inspection & Testing of Electrical Installations Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the 2391-52 Exam 1.2 How to Use This Guide & Open-Book Exam Strategy
2 Chapter 2: Statutory & Non-Statutory Documents
2.1 Statutory Documents 2.2 Non-Statutory Documents 2.3 Roles, Responsibilities & the Statutory/Non-Statutory Relationship
3 Chapter 3: Certification & Documentation
3.1 The Electrical Installation Certificate (EIC) & Schedules 3.2 The Minor Electrical Installation Works Certificate (MEIWC) 3.3 The Electrical Installation Condition Report (EICR) & Schedules 3.4 Why the Documents Exist: Reasons, Information Needed, Recording & Retention
4 Chapter 4: Initial Verification & Safe Isolation
4.1 Safe Isolation & Safety Management 4.2 Visual Inspection Requirements 4.3 Initial Verification: Requirements & Process 4.4 Additions & Alterations to an Existing Installation 4.5 Inspection Methods: The Senses, Verifying Items & IP Classification
5 Chapter 5: Sequence of Tests & Test Instruments
5.1 The Correct Sequence of Tests 5.2 Test Instruments: Selection, Calibration & Accuracy 5.3 Factors That Affect Test Results & Tests That May Be Unnecessary at Periodic Inspection
6 Chapter 6: Continuity Testing
6.1 Continuity of Protective Conductors (R1+R2) 6.2 Continuity of Ring Final Circuits (r1, rn, r2) 6.3 Main & Supplementary Protective Bonding Continuity
7 Chapter 7: Insulation Resistance & Polarity
7.1 Insulation Resistance Testing 7.2 Polarity Verification 7.3 Verifying SELV, PELV & Electrical Separation
8 Chapter 8: Earth Fault Loop Impedance
8.1 Ze & Zs Measurement 8.2 Zs Limits, Disconnection Times & the 0.8 Rule 8.3 Prospective Fault Current (PFC/PSCC)
9 Chapter 9: RCD & Earth Electrode Testing
9.1 RCD Testing 9.2 Earth Electrode Resistance on TT Systems
10 Chapter 10: Periodic Inspection & EICR Reporting
10.1 Purpose, Scope & Limitations of Periodic Inspection 10.2 Sampling & Extent of Inspection 10.3 Observation Classification Codes C1/C2/C3/FI 10.4 Outcomes, Inspection Intervals & Completing the EICR
11 Chapter 11: Phase Sequence, Functional Testing & Voltage Drop
11.1 Check of Phase Sequence 11.2 Functional Testing 11.3 Verification of Voltage Drop
12 Chapter 12: The 2391-502 Practical Assignment
12.1 The Practical Assignment & Establishing a Safe System of Work 12.2 Carrying Out the Practical: Inspection, Tests, Verification & Documentation
9.1 RCD Testing
Key Takeaways Explain This Topic AI
Under BS 7671:2018+A4:2026 the required verification is an alternating-current test at the rated residual operating current IΔn: a general (non-delay) type must operate within 300 ms, a Type S within 130-500 ms
A4:2026 deleted Table 3A of Appendix 3; the half-rated (0.5x IΔn) no-trip test and the five-times (5x IΔn) 40 ms test are useful diagnostics but are no longer BS 7671 requirements
The 40 ms figure comes from the product standards BS EN 61008-1/61009-1, where the manufacturer may declare either 5 IΔn or 0.25 A as the current at which 40 ms is achieved - read the device data before assuming 150 mA
Test at both the 0 degree and 180 degree start points and record the longer (worst-case) operating time on the schedule of test results
The integral test button (Reg 643.10) is a functional check of the test facility only; it does not measure operating time, so the instrument test is still required
Last updated: August 2026
Purpose of RCD Testing
A residual current device (RCD) disconnects the supply when it detects a difference between the line and neutral currents — current that is leaking to earth through an unintended path. Verifying an RCD confirms that it will actually operate, and operate quickly enough, when that happens.
BS 7671 uses RCDs for two distinct jobs, and the exam expects you to separate them:
Fault protection — on a TT system, and on some TN circuits, the RCD is the device that achieves automatic disconnection of supply . Its operation is verified as part of Regulation 643.7 (protection by automatic disconnection of supply), specifically Reg 643.7.1 .
Additional protection — a 30 mA RCD fitted under Regulation 415.1 to protect against direct contact, for example on socket-outlet circuits and cables concealed in walls. Its effectiveness is verified under Regulation 643.8 .
A third, separate check sits under Regulation 643.10 (functional testing) : operating the device’s own test facility — the integral "T" button — to confirm the test facility works.
RCD verification is a live test , performed after the dead tests and after the loop impedance measurements. The device needs a live supply to drive a residual current through its sensing core, so it cannot be verified dead.
RCD Types and Detection Types
Four mechanical forms appear in installations:
RCCB (residual current circuit breaker) — provides earth-leakage protection only, with no overcurrent protection ; it requires a separate MCB or fuse for overcurrent.
RCBO (residual current circuit breaker with overcurrent) — combines an RCD and an MCB (miniature circuit breaker) in one device, protecting a single circuit for both fault and overcurrent.
SRCD (socket-integral RCD) — built into a socket-outlet.
PRCD (portable RCD) — a plug-in portable device used with portable equipment.
Four detection types are classified by the residual current waveform they respond to:
Type AC — responds to sinusoidal alternating residual current only. BS 7671 restricts its use, and Type A is the practical minimum for general circuits .
Type A — responds to AC and pulsating DC residual currents.
Type F — responds to AC, pulsating DC and composite residual currents from single-phase frequency-converter loads such as some washing machines and inverter drives.
Type B — responds to AC, pulsating DC and smooth DC; used where smooth DC residual current can occur, for example EV (electric vehicle) charging equipment and PV (photovoltaic) installations .
Selecting the correct detection type matters: a Type AC RCD on an EV charger may be blinded by DC leakage and fail to trip. Type A is the baseline expectation for general installations; Type B is required where smooth DC can be present.
What BS 7671:2018+A4:2026 Actually Requires
This is the single most-changed area of RCD testing in recent amendments, and stale revision material is everywhere. Amendment 2:2022 simplified the requirement, and Amendment 4:2026 deleted Table 3A of Appendix 3 altogether.
The verification the current standard requires is:
An alternating-current test at the rated residual operating current (IΔn) , whatever the device type (AC, A, F or B).
- Device Operating time at IΔn
- General (non-delay) type — BS EN 61008-1 / BS EN 61009-1 must operate within 300 ms
- Type S (selective, time-delayed) must operate between 130 ms and 500 ms
Connect the tester between line and earth on the load side of the RCD, and test at both the 0° and 180° start points — a residual fault can begin in either half-cycle, and the core response can differ between them. Record the longer (worst-case) time on the schedule of test results, not the average and not the best.
What happened to 0.5× and 5×?
The familiar 0.5× / 1× / 5× ladder came from the 17th Edition and earlier practice:
Test Old status Status under A4:2026
0.5× IΔn — device must not operate Required Not required. Useful when investigating nuisance tripping or a suspected over-sensitive device
1× IΔn — timed operation Required Required — this is now the verification
5× IΔn — 40 ms for additional protection Required Not required by BS 7671. Still widely performed, and still a device characteristic under the product standard
Most multifunction testers still offer all three settings, and many centres and scheme providers still ask for the full ladder because it is good diagnostic practice. That is fine — but if the exam asks what BS 7671 requires , the answer is the single AC test at IΔn. Answers built on "0.5× must not trip" are testing the superseded rule.
Where the 40 ms figure really comes from
The 40 ms limit is a product-standard characteristic , not a BS 7671 field-test requirement. Under BS EN 61008-1 and BS EN 61009-1 , for a general-type device the manufacturer may declare either 5 IΔn or 0.25 A as the residual current at which the 40 ms maximum break time is achieved. Several manufacturers have adopted 0.25 A (250 mA) .
The practical consequence: for a 30 mA device, 5 IΔn is 150 mA, but a device declared to the 0.25 A characteristic is only guaranteed to achieve 40 ms at 250 mA . Testing it at 150 mA and rejecting the result as a fail is a real-world error — and a plausible exam distractor. Read the manufacturer’s data before deciding the test current. This applies to general-type devices regardless of whether they are Type AC, A, F or B; it is not specific to Type A.