Study guide
5.3 Factors That Affect Test Results & Tests That May Be Unnecessary at Periodic Inspection
City & Guilds 2391-52 Combined Inspection & Testing of Electrical Installations Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the 2391-52 Exam 1.2 How to Use This Guide & Open-Book Exam Strategy
2 Chapter 2: Statutory & Non-Statutory Documents
2.1 Statutory Documents 2.2 Non-Statutory Documents 2.3 Roles, Responsibilities & the Statutory/Non-Statutory Relationship
3 Chapter 3: Certification & Documentation
3.1 The Electrical Installation Certificate (EIC) & Schedules 3.2 The Minor Electrical Installation Works Certificate (MEIWC) 3.3 The Electrical Installation Condition Report (EICR) & Schedules 3.4 Why the Documents Exist: Reasons, Information Needed, Recording & Retention
4 Chapter 4: Initial Verification & Safe Isolation
4.1 Safe Isolation & Safety Management 4.2 Visual Inspection Requirements 4.3 Initial Verification: Requirements & Process 4.4 Additions & Alterations to an Existing Installation 4.5 Inspection Methods: The Senses, Verifying Items & IP Classification
5 Chapter 5: Sequence of Tests & Test Instruments
5.1 The Correct Sequence of Tests 5.2 Test Instruments: Selection, Calibration & Accuracy 5.3 Factors That Affect Test Results & Tests That May Be Unnecessary at Periodic Inspection
6 Chapter 6: Continuity Testing
6.1 Continuity of Protective Conductors (R1+R2) 6.2 Continuity of Ring Final Circuits (r1, rn, r2) 6.3 Main & Supplementary Protective Bonding Continuity
7 Chapter 7: Insulation Resistance & Polarity
7.1 Insulation Resistance Testing 7.2 Polarity Verification 7.3 Verifying SELV, PELV & Electrical Separation
8 Chapter 8: Earth Fault Loop Impedance
8.1 Ze & Zs Measurement 8.2 Zs Limits, Disconnection Times & the 0.8 Rule 8.3 Prospective Fault Current (PFC/PSCC)
9 Chapter 9: RCD & Earth Electrode Testing
9.1 RCD Testing 9.2 Earth Electrode Resistance on TT Systems
10 Chapter 10: Periodic Inspection & EICR Reporting
10.1 Purpose, Scope & Limitations of Periodic Inspection 10.2 Sampling & Extent of Inspection 10.3 Observation Classification Codes C1/C2/C3/FI 10.4 Outcomes, Inspection Intervals & Completing the EICR
11 Chapter 11: Phase Sequence, Functional Testing & Voltage Drop
11.1 Check of Phase Sequence 11.2 Functional Testing 11.3 Verification of Voltage Drop
12 Chapter 12: The 2391-502 Practical Assignment
12.1 The Practical Assignment & Establishing a Safe System of Work 12.2 Carrying Out the Practical: Inspection, Tests, Verification & Documentation
5.3 Factors That Affect Test Results & Tests That May Be Unnecessary at Periodic Inspection
Key Takeaways Explain This Topic AI
Assessment criterion 4.7 names five factors that affect a result: circuit length, temperature, parallel conductors, loading and preparation (nulling)
Copper resistance rises about 0.4% per degree C, so a circuit measured cold at 10 C reads roughly 20% lower than the same circuit at its 70 C operating temperature - this is where the 0.8 rule comes from
Parallel earth paths through conduit, trunking, armour or bonded pipework make R2 and Zs read LOWER than the true protective conductor value and can mask a broken cpc
Connected load distorts insulation resistance downwards and standing earth leakage shortens the measured RCD operating time; disconnect loads where practicable and record what could not be disconnected
At periodic inspection some tests may be unnecessary or impracticable - the justification is recorded on the report as a limitation, never left blank
Last updated: August 2026
Why This Sits in the 56% Block
Assessment criterion 4.7 asks you to identify factors that affect the result of each test , and criterion 4.8 to interpret the result . You cannot do the second without the first. A measurement that looks like a fail may be a sound circuit measured badly, and — far more dangerous — a measurement that looks like a pass may be a defective circuit measured through a parallel path.
The specification names five factors. Learn them as a set, and learn which direction each one pushes the reading .
- Factor Affects Direction of error
- Circuit length R1+R2, Zs, voltage drop Longer circuit → higher reading (a genuine effect, not an error)
- Temperature R1+R2, Zs Cold measurement → reads low against a 70 °C tabulated limit
- Parallel conductors R2, Zs, continuity Parallel path → reads low , can mask a broken cpc
- Loading Insulation resistance, RCD time, loop impedance Connected load → IR reads low , RCD time reads short
- Preparation (nulling) Continuity, R1+R2 Un-nulled leads → reads high
1. Circuit Length
Conductor resistance is proportional to length: R = ρL / A . Doubling the run doubles R1 and R2, and therefore raises Zs and voltage drop. This is not a measurement error — it is why the R1+R2 and Zs values are taken at the furthest point of the circuit, where they are worst-case.
Two practical consequences:
A long circuit may satisfy overload protection comfortably and still fail on Zs or voltage drop . The remedy is a larger conductor, a shorter route, or a different protective device — not a different test.
An unexpectedly high reading at an intermediate accessory, on a circuit you believe to be short, suggests a longer cable route than the drawings show, or a joint you have not found.
2. Temperature
Copper has a temperature coefficient of resistance of about 0.004 per °C , so resistance changes by roughly 0.4% for every degree .
The tabulated maximum Zs values in Tables 41.2, 41.3 and 41.4 are calculated at the conductor’s maximum operating temperature — 70 °C for thermoplastic (PVC) insulation. But you test on site at ambient, typically around 10 °C , on a circuit that has carried no load.
Over a 60 °C span the resistance difference is about 1 + (0.004 × 60) ≈ 1.24 , which is why a cold measurement can look comfortable and the same circuit fail once it is warm. Turned around, the on-site limit is roughly 1 ÷ 1.24 ≈ 0.8 of the tabulated figure — the origin of the 0.8 rule covered in section 8.2.
The corollary matters too: if you measure a circuit that has been carrying load all day , it is already warm and the 0.8 rule is over-conservative. In that situation the full Appendix 3 adjustment gives a fairer answer.
3. Parallel Conductors and Parallel Paths
This is the factor that produces genuinely dangerous false passes, and it is heavily examined.
A protective conductor is rarely the only metallic route back to the main earthing terminal. Any of these can sit in parallel with it:
- Metallic conduit, trunking or ducting enclosing the circuit
- The steel wire armour of an SWA cable
Bonded extraneous-conductive-parts — water pipes, gas pipes, structural steel — that also run past the accessory
The cpc of another circuit connected to the same metalwork
Because parallel resistances combine to less than the smallest of them, the measured R2 or Zs comes out lower than the true value of the protective conductor alone . A circuit protective conductor that is broken part-way along the run can still give a healthy-looking Zs, because the current is finding its way home through the conduit.
How to catch it:
Compare the dead R1+R2 with the live Zs. If Zs is materially lower than Ze + (R1+R2), something is in parallel.
Compare R2 against the expected value for the conductor size and route length. A 1.5 mm² cpc on a 20 m run should read around 0.24 Ω; a reading of 0.05 Ω is not a very good cpc, it is a parallel path.
Where practicable, disconnect the parallel path at the main earthing terminal for the duration of the continuity test — with the installation isolated and the disconnection secured and restored immediately afterwards.
4. Loading and Connected Equipment
Equipment left connected changes what your instrument sees.
Insulation resistance — every connected load provides a parallel leakage path, so the measured value falls. Ten circuits each at 20 MΩ measure as 2 MΩ together. This is why a whole-installation figure below 1 MΩ is investigated by testing in sections , and why electronic equipment, dimmers, LED drivers and surge protective devices are disconnected or linked out. Applying 500 V DC to them can also destroy them.
RCD operation — standing earth leakage from connected equipment adds to your injected test current, so the device operates sooner than it would on the leakage you applied. Disconnect loads where practicable; where you cannot, note it.
Loop impedance — a heavily loaded circuit gives a slightly unstable reading, and testing under load risks nuisance tripping.
Whatever cannot be disconnected is a limitation and is recorded as such.
5. Preparation — Nulling the Leads
A pair of standard test leads has roughly 0.05 to 0.20 Ω of resistance, and a 10 m wander lead can add 0.3 to 0.5 Ω . Against an R1+R2 of 0.30 Ω, that is not a rounding error — it is the whole measurement.
Null the leads (or measure and subtract them) before every set of continuity measurements , and re-null when you change leads. Failing to null pushes every reading high , producing false fails, unnecessary remedial work and an inaccurate schedule of test results. It is one of the most common practical-assessment failures.