Study guide
1.1 Current Exam Facts
City & Guilds 2922-34 Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic Systems Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts 1.2 Eligibility, Currency and Industry Recognition 1.3 Assessment Format and Permitted Materials
2 Key Documentation and Legislation
2.1 Health, Safety and Continuity Law 2.2 Building Regulations and Planning Permission 2.3 Waste, Transport and Battery Fire Documents
3 Non-Statutory Standards and Industry Guidance
3.1 BS 7671, IET Codes of Practice and Guidance Notes 3.2 MCS Standards MIS 3002, MIS 3012 and MGD Guides 3.3 Fire Guidance, Grid Codes and Manufacturer Instructions
4 Working Safely with Solar PV Systems
4.1 PV Electrical Hazards 4.2 Risk Assessment, Method Statements, Height and PPE 4.3 Dual-Supply Isolation and Prove-Dead
5 PV Cells, Modules and I-V Behaviour
5.1 Silicon Cell Technologies 5.2 Module Types and Building Integration 5.3 The I-V Curve, Irradiance, Temperature and Shading
6 Inverters, Inverter Functions and Metering
6.1 Inverter Types 6.2 Inverter AC, DC and Energy-Management Functions 6.3 Utility and Generation Metering
7 Array Behaviour, Architectures and Nameplate Symbols
7.1 Reverse Currents, Bypass Diodes and PID 7.2 Array Architectures 7.3 STC and Manufacturer Symbols
8 Site Performance: Pitch, Shade and Yield
8.1 Pitch, Orientation and Location 8.2 Shading, Loss Stack and MGD 005 8.3 Estimating Annual Yield
9 Array Capacity, DNO Connection and Equipment Siting
9.1 Calculating Maximum Array Capacity 9.2 G98, G99, G100 and Combined Generation 9.3 Equipment Siting and Permissions
10 DC Voltage, Current and Overcurrent Protection
10.1 DC Voltage and Current Multipliers 10.2 String Overcurrent Protection Rule 10.3 DC Circuit-Breakers and gPV Fuses
11 DC Isolation, Combiners, Connectors and Cables
11.1 DC Isolation and Switching 11.2 Combiner Boxes and PV Connectors 11.3 DC Cables and Earth-Fault Causes
12 DC Fault Monitoring, Surge Protection and Inverter Sizing
12.1 Insulation Monitoring, RCM and Earth-Fault Alarms 12.2 Electromagnetic Interference and DC Surge Protection 12.3 Inverter Sizing and the MPP Window
13 Inverter Location, AC Side and Labelling
13.1 Inverter Specification and Location 13.2 AC Isolation and G99 Relays 13.3 AC Cables, Voltage Drop and RCDs 13.4 Labelling the PV System
14 Testing, Commissioning, Handover and Maintenance
14.1 Initial Verification and DC Inspection 14.2 Minimum and Additional DC Tests 14.3 Handover, Client Briefing and Maintenance
15 Prosumer Installations, EEMS and Storage
15.1 Prosumer Terms and Vehicle Storage 15.2 Integrated Energy Management and the Smart Grid 15.3 G100 Export Limitation and Why Add Storage
1.1 Current Exam Facts
Key Takeaways Explain This Topic AI
City & Guilds pathway 2922-34 is the Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic Systems, Ofqual 610/4841/0, with 22 Guided Learning Hours and 30 Total Qualification Time (handbook v1.3, August 2025).
Unit 301 is a 30-question, 60-minute e-volve knowledge test graded Pass/Fail; the handbook sets the pass mark at approximately 75% and does not publish a fixed cut score.
Unit 301 weights are LO1 7% (2 questions), LO3 30% (9 questions), LO4 53% (16 questions), and LO6 10% (3 questions); LO2 and LO5 are assessed in the Unit 302 practical, not on the paper.
Last registration is 31 December 2027 and last certification is 31 December 2030 on the City & Guilds 2922 page updated 25 May 2026; learners must be 18 or over.
City & Guilds does not publish a candidate exam fee; approved centres set course prices. This ExamFinch guide is independent study material for 2922-34.
Last updated: September 2026
Why the published numbers matter on this award
Quick Answer: The award you are studying is City & Guilds pathway 2922-34 , officially titled Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic Systems . The Office of Qualifications and Examinations Regulation ( Ofqual ) number is 610/4841/0 . Handbook version 1.3 (August 2025) sizes it at 22 Guided Learning Hours (GLH) and 30 Total Qualification Time (TQT) . You must pass Unit 301 (online knowledge test) and Unit 302 (practical assignment). This ExamFinch chapter is independent study material for that pathway; it is not a City & Guilds publication.
Electricians lose weeks when they book the wrong City & Guilds number. Suite 2922 is Small Solar Photovoltaic Systems. The certificate that training centres, the Walled Garden, Joint Industry Board ( JIB ) records, and Electrotechnical Certification Scheme ( ECS ) Continuing Professional Development ( CPD ) entries actually use is pathway 2922-34 . A neighbouring award, 2923-34 (small electrical energy storage), is a different qualification with a different Ofqual number. If your booking confirmation, invoice, or ECS upload shows 2923 when you meant 2922, stop and correct it before you sit e-volve.
City & Guilds last updated the public 2922 product page on 25 May 2026 . That page is the owner source for last registration 31 December 2027 and last certification 31 December 2030 . Handbook v1.3 remains the owner source for assessment rules, permitted books, learning-outcome weights, and learner-entry rules. Where a centre flyer disagrees with either document, prefer the owner source with the later applicable date for that fact.
Identity card you should be able to recite
- Fact Current owner figure
- Suite number 2922
- Pathway 2922-34
- Official title Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic Systems
- Ofqual number 610/4841/0
- Handbook Version 1.3, August 2025
- Guided Learning Hours 22
- Total Qualification Time 30
- Minimum age 18+
- National Occupational Standards mapping (City & Guilds) SPV01
- Last registration (2922 page, 25 May 2026) 31 December 2027
- Last certification (2922 page, 25 May 2026) 31 December 2030
Guided Learning Hours are the 22 hours City & Guilds assigns to teaching, supervised practice, and assessment under a tutor. Total Qualification Time adds the extra notional hours a typical learner spends in directed study outside that contact time, bringing the estimate to 30 hours. This is a short CPD award, not a three-year apprenticeship. Centres removed the old “number of days” wording in handbook v1.3; do not treat a five-day or three-day commercial course length as a City & Guilds rule.
The qualification is written as CPD for competent electricians who already meet industry entry requirements in the Electrotechnical Assessment Specification (EAS) . Scope is domestic and small commercial grid-connected photovoltaic (PV) work — roof- and building-mounted arrays that export or operate in parallel with the public supply — not utility-scale farms, not standalone off-grid cabins as the main use case, and not a licence to design high-voltage networks. City & Guilds maps Units 301 and 302 to National Occupational Standards (NOS) SPV01 , the occupational standard for installing and maintaining solar PV systems. NOS mapping describes the job the unit is written against; it is not a claim that ExamFinch, your centre, or City & Guilds is the Microgeneration Certification Scheme ( MCS ).
Two mandatory units — and what the knowledge paper actually examines
To achieve the award you must complete both mandatory units:
301 — Installation and maintenance of small solar photovoltaic systems — online knowledge test on the City & Guilds e-volve platform.
302 — Installation and maintenance of small solar photovoltaic systems — practical assignment .
Eligibility must be confirmed first. After that, centres claim proxy unit 2922-801 so Walled Garden can release a certificate. Section 1.3 walks the proxy path; the exam-facts point is simpler: there is no knowledge-only route and no practical-only route.
Unit 301 is 30 questions in 60 minutes , graded Pass/Fail . Handbook v1.3 states that the pass mark is set at approximately 75% . That wording is deliberate. City & Guilds has not published a fixed integer cut score such as “23 out of 30.” Centres and blogs that print a guaranteed 23/30 figure are inventing a number the handbook refused to lock. Study as if you need a strong pass on a 30-item paper, and do not argue with an e-volve result by quoting a homemade threshold.
The six learning outcomes ( LO ) of the combined 301/302 unit are not all on the multiple-choice paper. The test specification in handbook v1.3 examines only LO1, LO3, LO4, and LO6 . LO2 (work safely with solar PV electrical systems) and LO5 (test, commission and handover solar PV systems) are assessed in the practical assignment . A candidate who crams inverter nameplate data but has never isolated a live array under a method statement is preparing for the wrong unit.
Unit 301 question weights (handbook v1.3)
Learning outcome on the knowledge test Questions Weight
LO1 Know the key documentation and legislation for design and installation of solar PV and electrical energy storage systems (EESS) 2 7%
- LO3 Understand the characteristics of solar PV systems, components and architectures 9 30%
- LO4 Understand design and installation considerations for solar PV systems 16 53%
- LO6 Understand the use of micro-generation and EESS as part of prosumer’s installations 3 10%
- Total 30 100%
LO4 is more than half the paper. Sixteen of thirty items sit on design and installation considerations: string voltage and current, cable and isolation choices, array layout, inverter matching, and the installation decisions that sit under BS 7671 Section 712 and the Institution of Engineering and Technology (IET) Code of Practice for Grid-connected Solar Photovoltaic Systems, 2nd Edition . LO3 is the next block — nine questions on modules, inverters, architectures, and component behaviour. LO1 is only two questions, but they are cheap marks if you can find statutory versus non-statutory documents. LO6 is three questions on micro-generation and electrical energy storage systems (EESS) in a prosumer’s installation (a consumer who also generates).
Treat the chart below as a revision timetable, not decoration. If you have six hours left before e-volve, roughly three of those hours belong on LO4, about two on LO3, and the remainder split between LO1 documents and LO6 prosumer/EESS items. Spending those six hours colour-coding a risk-assessment template is LO2/LO5 work — essential for Unit 302, almost invisible on Unit 301.