Study guide

About the PTS Qualification & Assessment

Personal Track Safety PTS

Track your progress as you read

Finished sections get a check mark.

1 Introduction

About the PTS Qualification & Assessment

2 Chapter 1: Railway Infrastructure & Track Layout

1.1 Track Layout, Track Components & Permanent Way Terminology 1.2 Points, Crossings, Switch Blades & Associated Hazards 1.3 Limited Clearances, Refuges & Trackside Structures

3 Chapter 2: Sentinel Scheme, Fitness for Work & PPE

2.1 The Sentinel Scheme, Card System & Sponsorship 2.2 Medical Fitness, Drugs & Alcohol Policy & Fatigue Management 2.3 Trackside Personal Protective Equipment Standards

4 Chapter 3: Walking and Working On or Near the Line

3.1 On or Near the Line, the Lineside & Going onto the Railway 3.2 Positions of Safety, Walking Alone & Crossing the Line 3.3 Procedures When a Train Approaches

5 Chapter 4: AC Electrification & Overhead Line Safety

4.1 AC Overhead Line Equipment Principles & Components 4.2 AC Clearances, Live Equipment, Bonds & Overhead Line Permits 4.3 Overhead Line Emergencies, Emergency Switch-Off & Rescue

6 Chapter 5: DC Conductor Rail & Electrification Safety

5.1 DC Electrification Infrastructure & Operating Voltages 5.2 DC Working Distances, Safe Stepping & Bridging Risks 5.3 Flooding, Weather & DC Emergency Switch-Off

7 Chapter 6: Safe Systems of Work & Trackside Safety Roles

6.1 The Safe System of Work and Its Hierarchy 6.2 Trackside Safety Roles and How to Recognise Them 6.3 Briefings, During the Work & the Worksafe Procedure

8 Chapter 7: Safety-Critical Communications & Trackside Signage

7.1 Communicating Clearly: Safety-Critical Communications 7.2 Signals, Trackside Signs & Whistle Boards 7.3 Railway Telephones, Radio & Mobile Phones

9 Chapter 8: Railway Emergency Procedures & Stopping Trains

8.1 Emergencies: Danger to Trains and Emergency Calls 8.2 Stopping Trains and Protecting the Line 8.3 Reporting Your Concerns: Close Calls, CIRAS & Statutory Reporting

About the PTS Qualification & Assessment

Key Takeaways Explain This Topic AI

PTS is required to go on or near the line, or to do engineering or technical work within 1.25 metres of a platform edge, on Network Rail managed infrastructure.

PTS has a core element plus PTS AC for lines with overhead line equipment and PTS DCCR for lines with conductor rails.

A Primary Sponsor and Sentinel profile, a valid NR/L2/OHS/00124 medical, photo identification, effective English communication and passed PTS pre-learning. Confirm the workforce-specific D&A requirement: Issue 8 retains a negative test within three months before PTS training for the supply chain but removes that separate pre-course requirement for Network Rail workers. Other fitness and testing duties still apply.

PTS is normally valid for two years. After expiry you must not work using that competence; a provider’s eight-week recertification-course admission window is not an extension of track-work authority.

Recertification requires endorsed workplace experience. Confirm the applicable course-date evidence rules; the full CTM/021 text was not available to establish one universal October 2026 count.

Last updated: October 2026

About the PTS Qualification & Assessment

Personal Track Safety (PTS) is the entry-level track safety competence for Network Rail managed infrastructure. Network Rail's Guide to your Personal Track Safety (RT3170, Issue 11, 2024) says PTS is required by people who need to go on or near the line (within 3 metres of a line) or carry out engineering or technical work on a platform within 1.25 metres of its edge . Training providers describe it as the competence anyone joining the industry needs before they can access the track environment.

PTS is designed to keep you safe. It does not by itself qualify you to protect other people: with PTS alone you work under the control of a COSS, and you must never work alone unless you are a COSS or an individual working alone (IWA).

The Three Parts of PTS

Part What it covers Why it matters

PTS core The railway environment, fitness for work, Sentinel, going onto the railway, safe systems of work, communication, emergencies and reporting concerns Needed for all track access

PTS AC Lines with 25 kV AC overhead line equipment You can only go on or near a line with OLE if your Sentinel record includes PTS AC

PTS DCCR Lines with DC conductor rails You can only go on or near a line with conductor rails if your Sentinel record includes PTS DCCR

Initial courses commonly take two days after online pre-learning. Confirm the included AC/DCCR modules and practical assessment for the booking; course length is not a universal examination duration.

Before the Course

Training providers set out the prerequisites, which follow the Sentinel Scheme Rules and Network Rail standards:

A Primary Sponsor and a Sentinel profile : your sponsor must create your Sentinel profile and make sure your medical and drugs and alcohol records are valid and uploaded. Only sponsors approved at "trackside" level can sponsor people to hold PTS (Sentinel Scheme Rules 5.1.3).

Medical fitness to Network Rail standard NR/L2/OHS/00124.

Drugs and alcohol : Network Rail’s Issue 8 briefing retains a negative test within three months before PTS training for supply-chain workers , but removes that separate pre-course requirement for Network Rail workers . Other fitness and testing duties still apply. Check your workforce category and records with the sponsor.

English and identity : you must be able to read and communicate effectively in English, and bring photo identification such as a passport or driving licence. The Sentinel Scheme Rules require enough English to understand instructions, challenge when appropriate and make an emergency phone call.

E-learning : you must pass the PTS pre-learning training and assessment online through Network Rail's e-learning website before the course, and bring the completion certificate.

PPE for the practical session : approved lace-up safety boots, orange high-visibility upper and lower clothing, a helmet, eye protection and gloves.

Some providers set a minimum age for their courses (for example 18), so check with your provider.

The Course and the Assessment

The course aims to make you able to correctly interpret the Rule Book (or the PTS handbook) and relevant instructions when going on or near the line , and to follow a safe system of work . Provider course profiles list the key topics as getting to know the infrastructure, going on to the railway, walking or working, communication skills, emergency situations, AC electrification equipment, DCCR electrification equipment and a track visit.

Assessment is by theory and practical/verbal assessment, after the online pre-learning assessment. The public sources reviewed do not establish a universal national question count or percentage pass mark for the PTS assessment, so prepare to understand and apply the rules rather than to memorise a fixed question paper.

PTS course topic Where it is covered in this guide

Getting to know the infrastructure Chapter 1 (track layout, points, limited clearances) and section 7.2 (signals)

  • Are you fit for work? and the Sentinel scheme Chapter 2
  • Going on to the railway, walking or working Chapters 3 and 6
  • AC and DCCR electrification equipment Chapters 4 and 5
  • Communication skills Sections 7.1 and 7.3
  • Emergency situations and reporting your concerns Chapter 8
  • Validity, Recertification and Practice

A PTS competence is normally valid for two years . Do not work using an expired PTS competence. Some providers admit candidates to recertification up to eight weeks after expiry instead of requiring an initial course; this is a course-admission window , not an extension of competence or permission to work on or near the line. Check the provider’s admission rules. Recertification is normally a one-day course.

NSAR Briefing 26 requires genuine endorsed workplace experience, identifying the date, location and protection used. Insufficient endorsed experience makes a candidate ineligible for recertification and requires initial training.

Public provider summaries of NR/L2/CTM/021 contain transition dates and different admission descriptions. The full current standard was not available in this review to verify a universal 8-in-24/4-in-12 count for October 2026. Have the sponsor and provider check the requirement for the course date, including accepted electronic records and eligible older paper evidence. Do not equate attendance with actual competence use.

Provider summaries describe a mentoring period for newly qualified PTS holders, identified by a green square on Sentinel and a blue helmet (chapter 2). Follow your sponsor’s mentoring and assessment arrangements. Elapsed time alone does not establish competence or authorise release from mentoring.

Sentinel Scheme Rules require a valid physical or virtual Sentinel card and swiping in before work . A swipe-in checks access and records attendance; it is not by itself evidence that a particular competence was practised . Record the actual competence activity in the Sentinel Log Book under the applicable practice requirements, with the required confirmation.

Your Handbooks

Your Primary Sponsor must give you the handbooks and briefings you need at no cost (Sentinel Scheme Rules 3.2.3 and Appendix B). For PTS the key documents are:

  • Document Current issue (checked 12 October 2026)
  • RT3170 Guide to your Personal Track Safety Issue 11, 2024

GERT8000-HB1 General duties and track safety for track workers Issue 9, in force since 6 December 2025; Issue 10 comes into force on 5 December 2026

  • GERT8000-HB2 Instructions for track workers who use emergency protection equipment Issue 2
  • GERT8000-HB16 AC electrified lines Issue 7, in force since 6 June 2026
  • GERT8000-HB17 DC electrified lines Issue 6, in force since 6 June 2026

The Rule Book is updated in regular cycles: for example, HB1 Issue 9 was published in September 2025 and came into force in December 2025, and HB16 Issue 7 was published in March 2026 and came into force in June 2026. Each change is summarised in the Rule Book Briefing Leaflet , and your sponsor must brief you on changes. Always work to the issue that is in force on the day.

The Sentinel Scheme Rules also refer to the rail industry Lifesaving Rules , which the rules define as rules developed by the rail industry to address the main causes of death and serious injury. Infringing them is listed as a breach of the Sentinel Scheme Rules, so make sure your sponsor has briefed you on the current version.

Loading diagram... The PTS Journey