5.6 Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Crane Safety & Rigging
CITB Site Management Safety Training Scheme SMSTS
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Legal Framework, CDM 2015 & Health and Safety Management
1.1 How the SMSTS Course and Examination Actually Work 1.2 Health and Safety at Work etc. Act 1974 (HASAWA) & Statutory Duties 1.3 Management of Health and Safety at Work Regulations 1999 & HSG65 (Plan-Do-Check-Act) 1.4 CDM 2015 Overview & Five Duty Holders (Client, Principal Designer, Principal Contractor, Designer, Contractor) 1.5 CDM 2015 Project Documentation: PCI, Construction Phase Plan & Health and Safety File 1.6 Statutory Notifications (F10), Enforcement Notices (Improvement/Prohibition), and Fee for Intervention (FFI) 1.7 RIDDOR 2013: Reporting Over-7-Day Injuries, Specified Injuries, Occupational Diseases & Dangerous Occurrences
2 Chapter 2: Risk Management, RAMS & Site Safety Leadership
2.1 Principles of Risk Assessment & Five Steps to Risk Assessment 2.2 Hierarchy of Control Measures & Risk Matrices 2.3 Developing, Reviewing, and Implementing Risk Assessments & Method Statements (RAMS) 2.4 Permit to Work (PTW) Systems for High-Risk Activities 2.5 Worker Consultation, Toolbox Talks, and Safety Leadership Culture 2.6 Behavioural Safety, Human Factors, and Accident Investigation Techniques
3 Chapter 3: High-Risk Site Operations: Height, Excavations & Confined Spaces
3.1 Work at Height Regulations 2005 & Hierarchy of Control for Height Work 3.2 Scaffolding Standards (TG20, BS EN 12811) & Statutory 7-Day Inspection Regimes 3.3 Mobile Elevating Work Platforms (MEWPs), Ladders, Tower Scaffolds & Fragile Roof Safety 3.4 Excavation Safety: Preventing Ground Collapse, Shoring, Battering & Edge Protection 3.5 Underground Services Avoidance (HSG47): Cable Avoidance Tools (CAT) & Genny Operation 3.6 Confined Spaces Regulations 1997: Risk Assessment, Atmosphere Testing & Rescue Procedures 3.7 Temporary Works Management: BS 5975-1, Coordinator Roles & Permits to Load and Strike
4 Chapter 4: Occupational Health, Chemical Safety & Physical Hazards
4.1 Control of Substances Hazardous to Health (COSHH) Regulations & Exposure Limits 4.2 Respirable Crystalline Silica (RCS), Dust Control & Respiratory Protective Equipment (RPE) 4.3 Asbestos Management on Construction Sites: Control of Asbestos Regulations 2012 4.4 Noise at Work Regulations 2005 & Hand-Arm Vibration Syndrome (HAVS) Exposure Action Values 4.5 Manual Handling Operations Regulations 1992, Ergonomics & Musculoskeletal Health 4.6 Health Surveillance, Medical Fitness & Workplace Hygiene/Wellbeing 4.7 Lead in Buildings: Control of Lead at Work Regulations 2002 & Blood-Lead Surveillance 4.8 Drugs and Alcohol at Work: Legal Framework, Site Policy, Testing & Support
5 Chapter 5: Fire Safety, Electrical Protection & Plant Operations
5.1 Fire Prevention on Construction Sites (HSG168), Fire Triangle & Hot Work Permits 5.2 Fire Extinguishers, Means of Escape, LPG Storage & Emergency Evacuation Plans 5.3 Electricity at Work Regulations 1989 & Safe Isolation Procedures 5.4 110V Reduced Low Voltage Systems, RCDs & Overhead Power Lines Safety (GS6) 5.5 Provision and Use of Work Equipment Regulations 1998 (PUWER) & Equipment Inspections 5.6 Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Crane Safety & Rigging
6 Chapter 6: Site Setup, Logistics, Welfare & Environmental Protection
6.1 CDM 2015 Schedule 2 Welfare Facilities Standards & Site Setup Requirements 6.2 Site Traffic Management, Pedestrian-Vehicle Segregation & Delivery Logistics 6.3 Site Inductions, Security, Signage & Competence Verification (CSCS/CPCS) 6.4 First Aid at Work Regulations 1981: Needs Assessment, First Aiders & Equipment 6.5 Environmental Protection: Waste Management (Duty of Care), Pollution Prevention & Noise Control 6.6 Mobile Workforce, Lone Working & Driving for Work
5.6 Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Crane Safety & Rigging
Key Takeaways Explain This Topic AI
LOLER 1998 mandates that every lifting operation must be properly planned by a competent Appointed Person (AP), appropriately supervised by a Lift Supervisor, and executed safely.
Statutory Thorough Examination intervals under LOLER Regulation 9 are strictly: at least every 6 months for lifting accessories (slings, shackles, chains) and equipment lifting people; at least every 12 months for all other lifting equipment (cranes, excavators used as cranes, forklifts).
Safe Working Load (SWL) or Working Load Limit (WLL) must be clearly marked on all lifting equipment and accessories; using un-marked or out-of-date inspected gear is illegal.
Crane stability requires outriggers fully extended on suitable spreader mats/pads over consolidated ground, calculated ground bearing pressure, and rated capacity indicators (RCI).
Rigging and slinging operations require qualified Slinger/Signallers (Rigger) utilizing correct sling angles, de-rating factors, mode factors, and tag lines to control load swing.
Last updated: August 2026
Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Crane Safety & Rigging
Lifting operations involving mobile cranes, tower cranes, excavators lifting loads, telehandlers, passenger hoists, and rigging tackle represent some of the highest-risk activities on construction sites. The failure of a crane or lifting accessory can cause catastrophic structural destruction and multiple fatalities. The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) work in tandem with PUWER 1998 to establish legal requirements for planning, supervising, inspecting, and safely executing all lifting operations.
1. Scope of LOLER 1998: Lifting Equipment vs. Lifting Accessories
LOLER applies to all employers and site managers who own, operate, or control lifting equipment. The regulation distinguishes between two primary categories:
Lifting Equipment: Work equipment used for lifting or lowering loads. Examples include mobile cranes, tower cranes, excavators fitted with lifting eyes, forklift trucks, telehandlers, scissors lifts, and goods/passenger hoists.
Lifting Accessories (Tackle): Equipment used to attach the load to the lifting machine. Examples include chain slings, wire rope slings, synthetic webbing slings, shackles, eyebolts, spreader beams, vacuum lifters, and lifting beams.
2. Planning and Categorization of Lifting Operations (Regulation 8)
LOLER Regulation 8 mandates that every lifting operation must be properly planned by a competent person, appropriately supervised, and carried out in a safe manner .
The Lift Plan and Duty Roles
All lifting operations require a written Lift Plan (Method Statement) produced by an Appointed Person (AP) . +-----------------------------------------------------------------------------------+
- | LOLER DUTY HOLDER RESPONSIBILITIES |
- +-----------------------------------------------------------------------------------+
- | [ APPOINTED PERSON (AP) ] • Overall authority. Authors Lift Plan, selects |
- | crane, calculates ground loading & sling geometry. |
- | |
- | [ CRANE SUPERVISOR ] • Direct site supervisor. Controls the lift area, |
- | enforces Lift Plan, and monitors weather/wind. |
- | |
- | [ SLINGER / SIGNALLER ] • Inspects tackle, attaches load, verifies center |
- | of gravity, and directs crane via signals/radio. |
- | |
- | [ CRANE OPERATOR ] • Operates crane within rated capacity limits; obeys |
- | emergency stop signals from any worker. |
- +-----------------------------------------------------------------------------------+
Lift Categories under BS 7121 (Code of Practice for Safe Use of Cranes):
Basic Lift: Routine lift of a load of known weight over clear ground with uncomplicated crane setup.
Intermediate Lift: Lifts involving blind spots, hazards in the swing arc, or lifting near energized structures.
Complex Lift: Tandem lifting (two cranes sharing a load), lifting suspended personnel, or lifting over live railways or highways. Requires complex engineering calculations by the AP.
3. Statutory Thorough Examination Schedule (Regulation 9)
Under LOLER Regulation 9, lifting equipment and accessories must undergo a rigorous Thorough Examination by an independent Competent Person (typically an engineer surveyor from an insurance inspection body).
Mandatory Examination Intervals Table
Category Work Equipment / Accessories Included Maximum Examination Interval
Lifting Accessories (Tackle) Chain slings, webbing slings, shackles, eyebolts, spreader bars. At least every 6 MONTHS
Equipment Lifting Persons MEWPs, scissors lifts, passenger hoists, crane man-baskets. At least every 6 MONTHS
Standard Lifting Equipment Mobile cranes, tower cranes, excavators used for lifting, telehandlers. At least every 12 MONTHS
Post-Repair / Exceptional Equipment subjected to major structural repair, overload, or modification. IMMEDIATELY before reuse
Site Management Compliance: Every item of lifting tackle on site must feature a valid inspection tag or color-coded badge. Operating with out-of-date or un-marked tackle is a direct criminal breach of LOLER.
4. Crane Stability, Outriggers, and Ground Conditions
The primary cause of crane overturns is inadequate ground support under outrigger jacks.
Ground Bearing and Outrigger Controls:
Outrigger Deployment: Crane outriggers must ALWAYS be fully extended and locked in accordance with manufacturer instructions. Partial outrigger extension is prohibited unless specifically calculated in the Lift Plan.
Spreader Pads (Mats): Outrigger jacks must rest on heavy-duty timber soleboards or engineered steel/composite spreader pads to distribute point loads over a larger surface area.
Ground Assessment: Ground bearing capacity must be formally verified by a structural engineer prior to positioning heavy cranes near excavations, retaining walls, or backfilled trenches.
Automatic Safe Load Indicators (ASLI / RCI): Mobile cranes must be fitted with calibrated Rated Capacity Indicators that warn the operator visually and audibly when approaching load limits and automatically cut dangerous crane movements upon 100% load reach.
5. Rigging, Slinging, and Load Geometry Mechanics
Improper slinging causes loads to slip, swing out of control, or collapse.
Critical Rigging Rules:
Working Load Limit (WLL) & Safe Working Load (SWL): Every sling and shackle must be clearly stamped with its WLL. Operatives must NEVER exceed rated limits.
Sling Included Angle De-Rating: As the included angle between sling legs increases, internal tension in each leg rises dramatically: +-----------------------------------------------------------------------------------+
- | SLING ANGLE MULTIPLIER (DE-RATING) |
- +-----------------------------------------------------------------------------------+
- | Leg Angle 0° (Vertical) ===> Factor = 1.00 (Full Rated WLL per leg) |
- | Leg Angle 60° (Equilateral) => Factor = 0.86 (14% Reduction in WLL) |
- | Leg Angle 90° (Right Angle) => Factor = 0.70 (30% Reduction in WLL) |
- | Leg Angle 120° (MAXIMUM) ===> Factor = 0.50 (50% REDUCTION IN CAPACITY!) |
- +-----------------------------------------------------------------------------------+
Maximum Leg Angle: Sling included angles must NEVER exceed 120 degrees .
Choke Hitch De-Rating: Wrapping a sling around a load in a choke hitch reduces its rated WLL by 20% (multiply WLL by 0.8) due to severe stress concentration at the bite point.
Tackle Rejection Criteria: Slings must be immediately destroyed if they exhibit cuts, fraying, chemical damage, heat singeing, deformed shackle pins, or missing identification tags.
Tag Lines: Non-conductive fiber tag lines must be attached to long or awkward loads to enable ground operatives to control load orientation without standing beneath suspended hazards.