Study guide

4.3 Asbestos Management on Construction Sites: Control of Asbestos Regulations 2012

CITB Site Management Safety Training Scheme SMSTS

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Legal Framework, CDM 2015 & Health and Safety Management

1.1 How the SMSTS Course and Examination Actually Work 1.2 Health and Safety at Work etc. Act 1974 (HASAWA) & Statutory Duties 1.3 Management of Health and Safety at Work Regulations 1999 & HSG65 (Plan-Do-Check-Act) 1.4 CDM 2015 Overview & Five Duty Holders (Client, Principal Designer, Principal Contractor, Designer, Contractor) 1.5 CDM 2015 Project Documentation: PCI, Construction Phase Plan & Health and Safety File 1.6 Statutory Notifications (F10), Enforcement Notices (Improvement/Prohibition), and Fee for Intervention (FFI) 1.7 RIDDOR 2013: Reporting Over-7-Day Injuries, Specified Injuries, Occupational Diseases & Dangerous Occurrences

2 Chapter 2: Risk Management, RAMS & Site Safety Leadership

2.1 Principles of Risk Assessment & Five Steps to Risk Assessment 2.2 Hierarchy of Control Measures & Risk Matrices 2.3 Developing, Reviewing, and Implementing Risk Assessments & Method Statements (RAMS) 2.4 Permit to Work (PTW) Systems for High-Risk Activities 2.5 Worker Consultation, Toolbox Talks, and Safety Leadership Culture 2.6 Behavioural Safety, Human Factors, and Accident Investigation Techniques

3 Chapter 3: High-Risk Site Operations: Height, Excavations & Confined Spaces

3.1 Work at Height Regulations 2005 & Hierarchy of Control for Height Work 3.2 Scaffolding Standards (TG20, BS EN 12811) & Statutory 7-Day Inspection Regimes 3.3 Mobile Elevating Work Platforms (MEWPs), Ladders, Tower Scaffolds & Fragile Roof Safety 3.4 Excavation Safety: Preventing Ground Collapse, Shoring, Battering & Edge Protection 3.5 Underground Services Avoidance (HSG47): Cable Avoidance Tools (CAT) & Genny Operation 3.6 Confined Spaces Regulations 1997: Risk Assessment, Atmosphere Testing & Rescue Procedures 3.7 Temporary Works Management: BS 5975-1, Coordinator Roles & Permits to Load and Strike

4 Chapter 4: Occupational Health, Chemical Safety & Physical Hazards

4.1 Control of Substances Hazardous to Health (COSHH) Regulations & Exposure Limits 4.2 Respirable Crystalline Silica (RCS), Dust Control & Respiratory Protective Equipment (RPE) 4.3 Asbestos Management on Construction Sites: Control of Asbestos Regulations 2012 4.4 Noise at Work Regulations 2005 & Hand-Arm Vibration Syndrome (HAVS) Exposure Action Values 4.5 Manual Handling Operations Regulations 1992, Ergonomics & Musculoskeletal Health 4.6 Health Surveillance, Medical Fitness & Workplace Hygiene/Wellbeing 4.7 Lead in Buildings: Control of Lead at Work Regulations 2002 & Blood-Lead Surveillance 4.8 Drugs and Alcohol at Work: Legal Framework, Site Policy, Testing & Support

5 Chapter 5: Fire Safety, Electrical Protection & Plant Operations

5.1 Fire Prevention on Construction Sites (HSG168), Fire Triangle & Hot Work Permits 5.2 Fire Extinguishers, Means of Escape, LPG Storage & Emergency Evacuation Plans 5.3 Electricity at Work Regulations 1989 & Safe Isolation Procedures 5.4 110V Reduced Low Voltage Systems, RCDs & Overhead Power Lines Safety (GS6) 5.5 Provision and Use of Work Equipment Regulations 1998 (PUWER) & Equipment Inspections 5.6 Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Crane Safety & Rigging

6 Chapter 6: Site Setup, Logistics, Welfare & Environmental Protection

6.1 CDM 2015 Schedule 2 Welfare Facilities Standards & Site Setup Requirements 6.2 Site Traffic Management, Pedestrian-Vehicle Segregation & Delivery Logistics 6.3 Site Inductions, Security, Signage & Competence Verification (CSCS/CPCS) 6.4 First Aid at Work Regulations 1981: Needs Assessment, First Aiders & Equipment 6.5 Environmental Protection: Waste Management (Duty of Care), Pollution Prevention & Noise Control 6.6 Mobile Workforce, Lone Working & Driving for Work

4.3 Asbestos Management on Construction Sites: Control of Asbestos Regulations 2012

Key Takeaways Explain This Topic AI

The Control of Asbestos Regulations 2012 (CAR 2012) govern all asbestos management, surveying, removal, and disposal activities across UK construction.

Under Regulation 4 (Duty to Manage Asbestos), dutyholders of non-domestic premises built before the year 2000 must inspect premises, maintain an Asbestos Register, and create an Asbestos Management Plan.

A Refurbishment and Demolition (R&D) Survey is legally mandatory before carrying out any intrusive structural, demolition, or refurbishment work on pre-2000 buildings.

High-risk asbestos removal involving friable materials (such as pipe insulation, asbestos insulating board, or sprayed coatings) requires a licensed asbestos contractor and a 14-day HSE notification.

The legal control limit for airborne asbestos fiber exposure across all types of asbestos is 0.1 fibers per cubic centimeter of air (0.1 f/cm³) averaged over a 4-hour period.

Last updated: August 2026

Regulatory Framework: Control of Asbestos Regulations 2012 (CAR 2012)

Asbestos is the single greatest cause of work-related deaths in the United Kingdom. Although the import, supply, and use of all forms of asbestos were completely banned in the UK in November 1999 , millions of tonnes of Asbestos-Containing Materials (ACMs) remain in buildings constructed or refurbished prior to the year 2000. Construction workers, refurbishment operatives, maintenance trades, and site managers face extreme risk if ACMs are disturbed without prior identification and strict containment controls.

The statutory framework governing all asbestos risks is the Control of Asbestos Regulations 2012 (CAR 2012) . CAR 2012 sets out stringent duties for building owners, dutyholders, principal contractors, and site managers to prevent exposure to airborne asbestos fibers.

Asbestos Types and Health Hazards

Asbestos is a group of naturally occurring fibrous silicate minerals known for their high tensile strength, heat resistance, and chemical durability. The three main commercial types of asbestos used in UK construction are:

Crocidolite (Blue Asbestos): The most dangerous amphibole fiber type, heavily used in sprayed insulation and lagging.

Amosite (Brown Asbestos): An amphibole fiber type widely used in Asbestos Insulating Board (AIB), ceiling tiles, and structural thermal insulation.

Chrysotile (White Asbestos): A serpentine fiber type, used extensively in asbestos cement sheeting, textured coatings (Artex), vinyl floor tiles, and gaskets.

Pathological Impact of Asbestos

When ACMs are damaged, drilled, sawed, or crushed, microscopic fibers are released into the air. Inhaled fibers become permanently lodged in pulmonary tissues, pleura, or peritoneum. Health effects have long latency periods (typically 15 to 60 years after exposure):

Mesothelioma: A fatal, incurable cancer of the pleural lining of the lungs or abdominal cavity, almost exclusively caused by asbestos exposure.

Asbestos-Related Lung Cancer: Malignant tumors triggered by asbestos fibers in lung tissue.

Asbestosis: Severe pulmonary fibrosis resulting from heavy historical exposure, causing progressive lung hardening and respiratory failure.

Pleural Thickening and Plaques: Fibrotic scarring of the pleural membrane.

Dutyholder Responsibilities under Regulation 4

Regulation 4 of CAR 2012 establishes a specific Duty to Manage Asbestos in non-domestic premises. The dutyholder is the person or organization that has control over the maintenance or repair of non-domestic premises (such as building owners, landlords, or managing agents).

Key Duties under Regulation 4

Take reasonable steps to determine whether there are ACMs present in the building, their location, quantity, and condition.

Presume materials contain asbestos unless strong evidence proves otherwise.

Maintain an up-to-date Asbestos Register specifying the location, type, and condition of all ACMs.

Prepare and implement a detailed Asbestos Management Plan to prevent exposure.

Provide the Asbestos Register to all contractors, site managers, and maintenance personnel before work commences.

Types of Asbestos Surveys (HSG264)

Under HSE guidance document HSG264 (Asbestos: The Survey Guide) , surveys must be conducted by competent, UKAS-accredited asbestos surveyors. There are two distinct types of asbestos surveys:

1. Management Survey

Purpose: Standard survey required during normal building occupation and routine management.

Scope: Non-intrusive survey designed to locate and assess the condition of ACMs that could be damaged or disturbed during normal occupancy or minor daily maintenance.

2. Refurbishment and Demolition (R&D) Survey

Purpose: Mandatory survey required before any construction, alteration, refurbishment, structural work, or demolition takes place on pre-2000 structures.

Scope: Fully intrusive, destructive survey involving destructive inspection techniques to access hidden voids, structural columns, wall cavities, sub-floors, and ductwork where ACMs may be concealed.

Critical Site Management Standard: A site manager must never permit intrusive construction or demolition work to begin on a pre-2000 building relying only on a standard Management Survey. An R&D Survey covering the exact work footprint is legally mandatory.

Categories of Asbestos Work

CAR 2012 categorizes work with asbestos into three distinct regulatory tiers based on friability, matrix bond strength, and overall risk:

1. Licensed Asbestos Work

High-risk work involving friable materials where matrix degradation creates severe fiber release potential. Examples include working with sprayed asbestos coatings, thermal pipe lagging, and Asbestos Insulating Board (AIB).

Requirements: Must be undertaken strictly by an HSE-Licensed Asbestos Removal Contractor (LARC). Requires a mandatory 14-day notification to the HSE (Form ASB5) , enclosure under negative pressure, air monitoring, decontamination units (DCUs), and medical surveillance.

2. Notifiable Non-Licensed Work (NNLW)

Moderate-risk work involving non-licensed materials where materials are damaged, friable, or removed without deterioration in short-duration tasks (e.g. removing large quantities of degraded AIB or textured coatings).

Requirements: Does not require an HSE license, but requires online notification to the HSE before work begins, health records kept for 40 years, and medical examinations for operatives.

3. Non-Licensed Asbestos Work

Low-risk work involving tightly bound, non-friable materials (e.g. removing intact asbestos cement roof sheets, vinyl floor tiles, or asbestos gaskets).

Requirements: Requires trained operatives, safe working controls (wetting agents, H-class vacuums, FFP3 RPE), and disposable coveralls, but no formal HSE notification.

Control Limits and Airborne Monitoring

Under CAR 2012 Regulation 2, the legal statutory Control Limit for airborne asbestos fiber concentrations is: Control Limit = 0.1 fibers per cubic centimeter of air ( 0.1 f/cm 3 ) \text{Control Limit} = 0.1 \text{ fibers per cubic centimeter of air } (0.1 \text{ f/cm}^3) Control Limit = 0.1 fibers per cubic centimeter of air ( 0.1 f/cm 3 )

calculated over a continuous 4-hour reference period.

Short-term peak exposure must not exceed 0.6 f/cm³ over a 10-minute period. If airborne concentrations approach or exceed 0.1 f/cm³, work must cease immediately, and controls must be re-evaluated.

Emergency Protocol for Unplanned Asbestos Disturbance

If suspect, unrecorded material is unexpectedly disturbed or uncovered during site operations, site managers must enforce the following emergency protocol immediately:

STOP WORK IMMEDIATELY: Cease all work in the affected area straight away.

EVACUATE AND ISOLATE: Evacuate all personnel from the immediate vicinity and lock/seal off the area with barrier tape and warning signs.

PREVENT CONTAMINATION SPREAD: Turn off local ventilation plant. If workers' clothing is contaminated, damp down clothes with water spray, carefully remove coveralls, and seal them in asbestos waste bags.

REPORT TO SITE MANAGEMENT: Inform the Site Manager and Project Director immediately.

ARRANGE TESTING: Commission an accredited UKAS asbestos analyst to sample and analyze the material.

UPDATE REGISTER: If confirmed as asbestos, update the site Asbestos Register and engage an appropriately licensed contractor to remediate.