6.1 CDM 2015 Schedule 2 Welfare Facilities Standards & Site Setup Requirements

CITB Site Management Safety Training Scheme SMSTS

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Legal Framework, CDM 2015 & Health and Safety Management

1.1 How the SMSTS Course and Examination Actually Work 1.2 Health and Safety at Work etc. Act 1974 (HASAWA) & Statutory Duties 1.3 Management of Health and Safety at Work Regulations 1999 & HSG65 (Plan-Do-Check-Act) 1.4 CDM 2015 Overview & Five Duty Holders (Client, Principal Designer, Principal Contractor, Designer, Contractor) 1.5 CDM 2015 Project Documentation: PCI, Construction Phase Plan & Health and Safety File 1.6 Statutory Notifications (F10), Enforcement Notices (Improvement/Prohibition), and Fee for Intervention (FFI) 1.7 RIDDOR 2013: Reporting Over-7-Day Injuries, Specified Injuries, Occupational Diseases & Dangerous Occurrences

2 Chapter 2: Risk Management, RAMS & Site Safety Leadership

2.1 Principles of Risk Assessment & Five Steps to Risk Assessment 2.2 Hierarchy of Control Measures & Risk Matrices 2.3 Developing, Reviewing, and Implementing Risk Assessments & Method Statements (RAMS) 2.4 Permit to Work (PTW) Systems for High-Risk Activities 2.5 Worker Consultation, Toolbox Talks, and Safety Leadership Culture 2.6 Behavioural Safety, Human Factors, and Accident Investigation Techniques

3 Chapter 3: High-Risk Site Operations: Height, Excavations & Confined Spaces

3.1 Work at Height Regulations 2005 & Hierarchy of Control for Height Work 3.2 Scaffolding Standards (TG20, BS EN 12811) & Statutory 7-Day Inspection Regimes 3.3 Mobile Elevating Work Platforms (MEWPs), Ladders, Tower Scaffolds & Fragile Roof Safety 3.4 Excavation Safety: Preventing Ground Collapse, Shoring, Battering & Edge Protection 3.5 Underground Services Avoidance (HSG47): Cable Avoidance Tools (CAT) & Genny Operation 3.6 Confined Spaces Regulations 1997: Risk Assessment, Atmosphere Testing & Rescue Procedures 3.7 Temporary Works Management: BS 5975-1, Coordinator Roles & Permits to Load and Strike

4 Chapter 4: Occupational Health, Chemical Safety & Physical Hazards

4.1 Control of Substances Hazardous to Health (COSHH) Regulations & Exposure Limits 4.2 Respirable Crystalline Silica (RCS), Dust Control & Respiratory Protective Equipment (RPE) 4.3 Asbestos Management on Construction Sites: Control of Asbestos Regulations 2012 4.4 Noise at Work Regulations 2005 & Hand-Arm Vibration Syndrome (HAVS) Exposure Action Values 4.5 Manual Handling Operations Regulations 1992, Ergonomics & Musculoskeletal Health 4.6 Health Surveillance, Medical Fitness & Workplace Hygiene/Wellbeing 4.7 Lead in Buildings: Control of Lead at Work Regulations 2002 & Blood-Lead Surveillance 4.8 Drugs and Alcohol at Work: Legal Framework, Site Policy, Testing & Support

5 Chapter 5: Fire Safety, Electrical Protection & Plant Operations

5.1 Fire Prevention on Construction Sites (HSG168), Fire Triangle & Hot Work Permits 5.2 Fire Extinguishers, Means of Escape, LPG Storage & Emergency Evacuation Plans 5.3 Electricity at Work Regulations 1989 & Safe Isolation Procedures 5.4 110V Reduced Low Voltage Systems, RCDs & Overhead Power Lines Safety (GS6) 5.5 Provision and Use of Work Equipment Regulations 1998 (PUWER) & Equipment Inspections 5.6 Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Crane Safety & Rigging

6 Chapter 6: Site Setup, Logistics, Welfare & Environmental Protection

6.1 CDM 2015 Schedule 2 Welfare Facilities Standards & Site Setup Requirements 6.2 Site Traffic Management, Pedestrian-Vehicle Segregation & Delivery Logistics 6.3 Site Inductions, Security, Signage & Competence Verification (CSCS/CPCS) 6.4 First Aid at Work Regulations 1981: Needs Assessment, First Aiders & Equipment 6.5 Environmental Protection: Waste Management (Duty of Care), Pollution Prevention & Noise Control 6.6 Mobile Workforce, Lone Working & Driving for Work

6.1 CDM 2015 Schedule 2 Welfare Facilities Standards & Site Setup Requirements

Key Takeaways Explain This Topic AI

CDM 2015 Schedule 2 mandates that suitable and sufficient welfare facilities must be provided before any construction work begins and maintained throughout the project.

Sanitary facilities must be clean, adequately ventilated, lit, and provide a minimum ratio of 1 WC per 5 persons (or 1 WC per 7 persons with daily cleaning where urinals are provided).

Washing facilities must be located next to toilets and changing rooms, supplying hot and cold (or warm) running water, soap, and hygienic drying facilities.

Rest facilities must feature enclosed rest rooms with tables, seating with back support, facilities to heat food and boil water, and adequate heating and lighting.

The Principal Contractor holds statutory responsibility for ensuring welfare facilities are operational on day one of site takeover and kept in a clean, hygienic condition.

Last updated: August 2026

Statutory Framework for Site Welfare Facilities

Provision of adequate welfare facilities is a fundamental legal obligation under UK construction safety legislation. Under the Construction (Design and Management) Regulations 2015 (CDM 2015) , specifically Regulation 13(4)(b) for Principal Contractors and Regulation 15(11) for Contractors, suitable and sufficient welfare facilities must be made available before any construction work begins on site . Welfare facilities must remain fully operational and maintained in a clean, hygienic condition throughout the entire construction phase until project completion.

CDM 2015 explicitly incorporates Schedule 2 (Minimum Welfare Facilities) , which translates general statutory duties under the Workplace (Health, Safety and Welfare) Regulations 1992 into prescriptive requirements tailored to construction site environments. HSE operational guidance ( CIS59 - Provision of welfare facilities during construction work ) reinforces that welfare facilities are not an optional luxury or a secondary consideration; failing to provide compliant welfare before starting site operations constitutes a direct breach of statutory duty resulting in HSE Prohibition Notices and prosecution.

CDM 2015 Schedule 2 Statutory Standards

Schedule 2 sets out mandatory minimum standards across five core welfare areas that site managers must establish and maintain.

1. Sanitary Conveniences (Schedule 2, Paragraph 1)

Sanitary facilities must be provided in sufficient numbers relative to the size of the workforce. They must meet the following legal requirements:

Enclosure & Privacy: Fully enclosed cubicles with lockable doors from the inside to guarantee user privacy.

Ventilation & Lighting: Adequately ventilated to external air and fitted with artificial or natural lighting.

Cleanliness & Maintenance: Kept in a clean and hygienic condition, with regular daily cleaning schedules documented on site.

Flushing Mechanism: Flushed by water connected to mains drainage or an effective chemical recirculating system (flushing chemical toilets).

Provision Ratios: Standard HSE guidance recommends a minimum ratio of 1 WC to 5 persons for mixed gender use (or 1 WC to 5 males where urinals are also provided). On sites where daily professional cleaning is maintained, a ratio of 1 WC to 7 persons is acceptable.

Gender Specificity: Separate toilet facilities must be provided for men and women unless each facility is in a separate lockable room intended for use by one person at a time.

2. Washing Facilities (Schedule 2, Paragraph 2)

Washing facilities must be located in the immediate vicinity of sanitary conveniences and changing rooms. Statutory requirements include:

Water Supply: Clean hot and cold, or warm, running water . Cold water alone is non-compliant except in temporary emergency setups.

Cleansing Agents: Continuous supply of soap or other suitable cleansing agents (heavy-duty skin cleansers for trades handling resins, oils, or tar).

Drying Facilities: Hygienic means of drying hands—such as disposable paper towels or warm-air hand dryers. Shared cloth towels or roller towels are strictly prohibited due to cross-infection risks.

Basin Dimensions: Washing basins must be large enough to allow workers to wash their hands, forearms, and face simultaneously. This is critical for groundworkers, masons, and demolition operatives handling hazardous contaminants like silica dust, cement, lead, or COSHH substances.

3. Drinking Water (Schedule 2, Paragraph 3)

Site management must ensure an adequate supply of wholesome drinking water is readily accessible to all site personnel:

Supply & Marking: Water must be supplied directly from mains tap water or clean storage containers. Where non-potable water (e.g. recycled wash water) exists on site, drinking taps must be clearly marked with legible statutory notices.

Cups & Fountains: Provided with clean drinking cups or drinking fountains. Cups must be protected against site dust contamination.

4. Accommodation for Clothing & Changing Facilities (Schedule 2, Paragraph 4)

Construction work exposes operatives to weather extremes, wet conditions, and hazardous substances. Schedule 2 requires:

Separate Storage: Facilities enabling workers to lock away personal non-work clothing separate from protective work clothing (PPE).

Drying Accommodation: Dedicated, heated drying rooms with coat hooks, racks, and mechanical ventilation to dry wet foul-weather gear overnight.

Changing Rooms: Mandatory changing rooms where workers must change into specialized protective clothing (e.g., asbestos abatement, lead removal, or chemical protective suits) or where privacy is required between male and female workers.

5. Rest Facilities (Schedule 2, Paragraph 5)

Site personnel require protected space to consume food, rest, and shelter from bad weather. Rest accommodation must satisfy:

Protection & Environment: Fully enclosed, weatherproof, adequately heated, lit, and free from site dust, chemical fumes, and noise.

Seating with Backs: Mandatory provision of tables and seating equipped with back support . Stools, wooden benches without backs, or inverted buckets are strictly non-compliant.

Food Preparation: Means for heating food (microwave ovens or hobs) and boiling water (electric kettles or water boilers).

Clean Water: Easy access to clean water for washing eating utensils.

Non-Smoking Requirement: All rest units must be designated strictly non-smoking and non-vaping zones, with clear safety signage displayed.

Welfare Planning, Setup Logistics & Utilities

Establishing compliant welfare requires careful logistics planning during the pre-construction phase.

Setup Phase Welfare Setup Strategy Infrastructure & Power Requirements

Initial Site Takeover Mobile towable eco-welfare units (generator/solar powered) Self-contained fresh water bowser & effluent waste storage

Groundworks & Civils Modular cabin complex (stacked/linked welfare units) Temporary 110V reduced low voltage or 230V mains via RCD protection

Main Build Phase Connection to permanent building services (mains water/sewer) Permanent mains electrical grid connection & mains drainage line

Utility Connections and Waste Logistics

During early site setup, connection to permanent mains water and mains drainage may take several weeks. Where static modular cabins are installed before utility grid connection:

Fresh Water Bowsers: Water must be delivered by bowsers and pumped via automated pressure pumps. Potable water tanks must be sanitized regularly.

Effluent Storage Tanks: Effluent tanks beneath toilets must be sized correctly based on worker numbers and emptied on a scheduled tankering contract with a licensed waste carrier.

Electrical Safety: Electrical supplies to welfare units must be installed by a competent electrician (NICEIC/ECA registered) with Residual Current Device (RCD) protection operating at 30mA trip threshold.

Loading diagram... CDM 2015 Schedule 2 Site Welfare Setup & Infrastructure Workflow