6.5 Environmental Protection: Waste Management (Duty of Care), Pollution Prevention & Noise Control

CITB Site Management Safety Training Scheme SMSTS

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Legal Framework, CDM 2015 & Health and Safety Management

1.1 How the SMSTS Course and Examination Actually Work 1.2 Health and Safety at Work etc. Act 1974 (HASAWA) & Statutory Duties 1.3 Management of Health and Safety at Work Regulations 1999 & HSG65 (Plan-Do-Check-Act) 1.4 CDM 2015 Overview & Five Duty Holders (Client, Principal Designer, Principal Contractor, Designer, Contractor) 1.5 CDM 2015 Project Documentation: PCI, Construction Phase Plan & Health and Safety File 1.6 Statutory Notifications (F10), Enforcement Notices (Improvement/Prohibition), and Fee for Intervention (FFI) 1.7 RIDDOR 2013: Reporting Over-7-Day Injuries, Specified Injuries, Occupational Diseases & Dangerous Occurrences

2 Chapter 2: Risk Management, RAMS & Site Safety Leadership

2.1 Principles of Risk Assessment & Five Steps to Risk Assessment 2.2 Hierarchy of Control Measures & Risk Matrices 2.3 Developing, Reviewing, and Implementing Risk Assessments & Method Statements (RAMS) 2.4 Permit to Work (PTW) Systems for High-Risk Activities 2.5 Worker Consultation, Toolbox Talks, and Safety Leadership Culture 2.6 Behavioural Safety, Human Factors, and Accident Investigation Techniques

3 Chapter 3: High-Risk Site Operations: Height, Excavations & Confined Spaces

3.1 Work at Height Regulations 2005 & Hierarchy of Control for Height Work 3.2 Scaffolding Standards (TG20, BS EN 12811) & Statutory 7-Day Inspection Regimes 3.3 Mobile Elevating Work Platforms (MEWPs), Ladders, Tower Scaffolds & Fragile Roof Safety 3.4 Excavation Safety: Preventing Ground Collapse, Shoring, Battering & Edge Protection 3.5 Underground Services Avoidance (HSG47): Cable Avoidance Tools (CAT) & Genny Operation 3.6 Confined Spaces Regulations 1997: Risk Assessment, Atmosphere Testing & Rescue Procedures 3.7 Temporary Works Management: BS 5975-1, Coordinator Roles & Permits to Load and Strike

4 Chapter 4: Occupational Health, Chemical Safety & Physical Hazards

4.1 Control of Substances Hazardous to Health (COSHH) Regulations & Exposure Limits 4.2 Respirable Crystalline Silica (RCS), Dust Control & Respiratory Protective Equipment (RPE) 4.3 Asbestos Management on Construction Sites: Control of Asbestos Regulations 2012 4.4 Noise at Work Regulations 2005 & Hand-Arm Vibration Syndrome (HAVS) Exposure Action Values 4.5 Manual Handling Operations Regulations 1992, Ergonomics & Musculoskeletal Health 4.6 Health Surveillance, Medical Fitness & Workplace Hygiene/Wellbeing 4.7 Lead in Buildings: Control of Lead at Work Regulations 2002 & Blood-Lead Surveillance 4.8 Drugs and Alcohol at Work: Legal Framework, Site Policy, Testing & Support

5 Chapter 5: Fire Safety, Electrical Protection & Plant Operations

5.1 Fire Prevention on Construction Sites (HSG168), Fire Triangle & Hot Work Permits 5.2 Fire Extinguishers, Means of Escape, LPG Storage & Emergency Evacuation Plans 5.3 Electricity at Work Regulations 1989 & Safe Isolation Procedures 5.4 110V Reduced Low Voltage Systems, RCDs & Overhead Power Lines Safety (GS6) 5.5 Provision and Use of Work Equipment Regulations 1998 (PUWER) & Equipment Inspections 5.6 Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Crane Safety & Rigging

6 Chapter 6: Site Setup, Logistics, Welfare & Environmental Protection

6.1 CDM 2015 Schedule 2 Welfare Facilities Standards & Site Setup Requirements 6.2 Site Traffic Management, Pedestrian-Vehicle Segregation & Delivery Logistics 6.3 Site Inductions, Security, Signage & Competence Verification (CSCS/CPCS) 6.4 First Aid at Work Regulations 1981: Needs Assessment, First Aiders & Equipment 6.5 Environmental Protection: Waste Management (Duty of Care), Pollution Prevention & Noise Control 6.6 Mobile Workforce, Lone Working & Driving for Work

6.5 Environmental Protection: Waste Management (Duty of Care), Pollution Prevention & Noise Control

Key Takeaways Explain This Topic AI

Section 34 of the Environmental Protection Act 1990 places a strict statutory Duty of Care on waste producers to store waste securely and transfer it only to Registered Waste Carriers.

Waste Transfer Notes (WTNs) for non-hazardous waste must be retained for at least 2 years, while Hazardous Waste Consignment Notes (HWCNs) must be retained for 3 years.

Site Waste Management Plans (SWMPs) enforce the legal Waste Hierarchy (Prevention, Reuse, Recycling, Recovery, Disposal), requiring strict segregation of plasterboard/gypsum waste.

Fuel and oil storage tanks must incorporate secondary containment (bunding) holding 110% of the largest tank's capacity or 25% of aggregate stored volume, whichever is greater.

Under the Control of Noise at Work Regulations 2005, reaching the Upper Exposure Action Value of 85 dB(A) triggers mandatory Hearing Protection Zones and enforced wearing of hearing protection.

Last updated: August 2026

Statutory Environmental Responsibilities in Construction

Environmental management on construction sites is governed by a rigorous body of UK environmental legislation enforced by regulatory bodies including the Environment Agency (EA) in England, Natural Resources Wales (NRW) , and the Scottish Environment Protection Agency (SEPA) . Key primary statutes include the Environmental Protection Act 1990 (EPA 1990) , the Environment Act 2021 , the Water Resources Act 1991 , the Hazardous Waste (England and Wales) Regulations 2005 , and the Control of Noise at Work Regulations 2005 .

Breach of environmental statutory duties is a strict liability criminal offence. Regulators possess powers to issue Enforcement Notices, Prohibition Notices, and launch criminal prosecutions resulting in unlimited fines and personal custodial sentences for site managers and company directors.

Waste Management & Statutory Duty of Care (EPA 1990 Section 34)

Under Section 34 of the Environmental Protection Act 1990 , anyone who produces, imports, carries, keeps, treats, or disposes of controlled waste owes a statutory Duty of Care . Construction site managers must implement four mandatory Duty of Care controls:

Prevent Illegal Disposal: Ensure waste is not fly-tipped or disposed of unlawfully.

Secure Waste Storage: Store waste securely in designated, covered skips or containers to prevent escape by wind, vermin, or rainwater leaching.

Verify Registered Waste Carriers: Transfer waste ONLY to authorized individuals—specifically a Registered Waste Carrier holding a valid EA registration certificate. Site managers must check registration credentials on the EA public register prior to waste removal.

Complete Statutory Documentation: Ensure every load of waste leaving site is accompanied by correct written documentation containing accurate European Waste Catalogue (EWC) codes.

Statutory Waste Documentation Retention Periods

Site management must maintain formal waste tracking records on site subject to EA audit:

Waste Category Statutory Transfer Document Minimum Retention Period

Non-Hazardous Waste (Inert rubble, wood, paper, metal, plastic) Waste Transfer Note (WTN) 2 Years from date of transfer

Hazardous Waste (Asbestos, lead paint, solvents, oil-contaminated rags, fluorescent tubes) Hazardous Waste Consignment Note (HWCN) 3 Years from date of transfer

Note: Recurring identical non-hazardous waste transfers between the same producer and carrier can utilize a single "Season Ticket" WTN valid for up to 12 months.

Site Waste Management Plans (SWMP) & The Waste Hierarchy

Best practice management requires developing a Site Waste Management Plan (SWMP) prior to construction commencing. The SWMP sets out predicted waste streams, target recovery rates, and enforces the legal Waste Hierarchy established under the Waste (England and Wales) Regulations 2011: The Legal Waste Hierarchy:

  • 1. PREVENTION: Eliminate waste at design stage (exact material sizing, lean procurement)
  • 2. PREPARING FOR REUSE: Clean and reuse materials on site (crushed concrete aggregate, timber shuttering)
  • 3. RECYCLING: Segregate waste streams into dedicated skips (metals, timber, cardboard)
  • 4. OTHER RECOVERY: Energy recovery via incineration plants
  • 5. DISPOSAL: Landfill disposal (absolute last resort)
  • Critical Rule: Gypsum and Plasterboard Segregation

Plasterboard and gypsum-based products must be strictly segregated in dedicated, covered plasterboard skips and NEVER mixed with general biodegradable waste. When gypsum decomposes alongside organic waste in anaerobic landfill conditions, anaerobic bacteria react to produce hydrogen sulfide gas (H₂S) —a toxic, highly flammable, and foul-smelling gas. Mixing plasterboard in general skips violates environmental regulations.

Pollution Prevention & Watercourse Protection

Protecting watercourses, groundwater, and soil from chemical contamination is governed by the Water Resources Act 1991 and Guidance for Pollution Prevention (GPPs / PPGs) .

Secondary Containment (Bunding) for Oils and Fuels

Fuel tanks, mobile bowsers, oil drums, and chemical stores present severe spill risks. Statutory regulations mandate secondary containment (bunding):

Bund Capacity Rule: Bunds must provide secondary containment capable of holding 110% of the maximum capacity of the largest container , or 25% of the total aggregate volume of all containers stored within the bund, whichever is greater.

Bund Integrity: Bunds must be impermeable to water and oil, with no drain valves or outlets. Taps and fill pipes must be locked inside the bund boundary.

Concrete Wash-Out Controls

Ready-mix concrete truck wash water is highly alkaline (pH 12–13), rendering it corrosive and toxic to aquatic life. Discharging wash water into surface drains, streams, or unlined ground is a criminal offence. Sites must establish sealed, lined concrete wash-out bays equipped with pH neutralizing treatment systems or water recycling tanks.

Spill Response Preparedness

Refuelling areas must be equipped with dedicated Spill Response Kits containing oil-absorbent pads, booms, and soil granules. Site personnel must be trained in emergency spill response procedures, including immediately isolating the spill source, deploying booms to protect site drains, and notifying the Environment Agency Incident Hotline (0800 80 70 60) for major spillage incidents.

Control of Noise and Vibration at Work

Construction operations (demolition, piling, breaking, crushing) generate high noise levels governed by the Control of Noise at Work Regulations 2005 .

Statutory Noise Exposure Action Values

Employers must measure workplace noise levels and act when noise exposures reach defined action values:

Noise Exposure Value Daily / Weekly Exposure Limit Peak Sound Pressure Mandatory Employer Action

Lower Exposure Action Value 80 dB(A) 135 dBC Conduct risk assessment, provide info/training, make hearing protection available

Upper Exposure Action Value 85 dB(A) 137 dBC Establish mandatory Hearing Protection Zones, enforce wearing of hearing protection

Maximum Exposure Limit 87 dB(A) (taking PPE into account) 140 dBC Absolute legal limit; exposure must not exceed under any circumstances

Control of Noise at Work Regulations 2005 Action & Limit Values (dB)