Notice of Intent to Claim Lien & Memorandum of Lien Filing Procedures
Virginia Contractor Business Exam Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Virginia Licensing Laws & Board for Contractors Regulations
Virginia DPOR & Board for Contractors Structure Contractor License Classes & Monetary Thresholds License Eligibility, Designated Employees, Qualified Individuals & Pre-Licensing Education License Maintenance, Renewal, Reinstatement, and Prohibited Acts / Disciplinary Sanctions
2 Chapter 2: Virginia-Specific Regulations & Consumer Protections
2.1 Virginia Contractor Transaction Recovery Fund & Claim Eligibility 2.2 Virginia Uniform Statewide Building Code (USBC) & Local Permitting Requirements 2.3 Virginia Erosion and Sediment Control Regulations & Environmental Compliance
3 Chapter 3: Construction Contracts & Risk Management
3.1 Essential Elements of Construction Contracts & Required VA Provisions 3.2 Change Orders, Breach of Contract, and Dispute Resolution Mechanisms 3.3 Construction Insurance & Surety Bonds
4 Chapter 4: Virginia Mechanics Lien Law
Fundamentals of Virginia Mechanics Liens & Statutory Deadlines Notice of Intent to Claim Lien & Memorandum of Lien Filing Procedures Lien Waivers, Priority of Liens, and Lien Foreclosure Actions
5 Chapter 5: Estimating, Bidding & Financial Management
Estimating Methods, Quantity Takeoffs, and Overhead Calculation Bidding Procedures, Bid Preparation, and Markup Strategies Accounting Systems, Cash vs. Accrual Basis, and Financial Statements Payroll Taxes, Business Tax Obligations, and Financial Ratio Analysis
6 Chapter 6: Project Management & Site Operations
6.1 Project Scheduling Methods (CPM, Gantt Charts) and Progress Tracking 6.2 Material Management, Subcontractor Coordination, and Quality Control 6.3 Site Logistics, Project Closeout, Punch Lists, and Warranties
7 Chapter 7: OSHA Safety & Worker Protection Standards
OSHA Regulations, Employers' General Duty Clause & Inspection Procedures Construction Hazard Prevention (Fall Protection, Excavation, Scaffolding, HazCom) Virginia Workers' Compensation Act & Workplace Injury Reporting
8 Chapter 8: Employment Law & Business Ethics
8.1 Federal & Virginia Labor Laws (FLSA, Davis-Bacon, Equal Opportunity) 8.2 Employee Classification vs. Independent Contractor Status 8.3 Business Ethics, Environmental Compliance, and Fair Business Practices
Notice of Intent to Claim Lien & Memorandum of Lien Filing Procedures
Key Takeaways Explain This Topic AI
For 1-and-2 family residential projects where a Mechanics Lien Agent (MLA) is designated on the building permit, claimants must serve written Notice to the MLA within 30 days of beginning work or permit issuance under Va. Code § 43-4.01.
A Memorandum of Mechanics' Lien must be recorded in the land records of the Circuit Court in the city or county where the real property is located.
The Memorandum of Lien must contain an itemized accounting of the claim, a legal description of the property, claimant and owner details, contractor license information, and a verification under oath executed before a notary public.
Subcontractors and lower-tier suppliers must serve a copy of the recorded Memorandum of Lien upon the property owner and general contractor under Va. Code § 43-7 and § 43-9 to perfect their lien rights.
Last updated: July 2026
- Notice of Intent to Claim Lien & Memorandum of Lien Filing Procedures
- Mechanics Lien Agent (MLA) Notice Requirements (Va. Code § 43-4.01)
To protect innocent home buyers from unrecorded "secret liens" on new residential construction, Virginia established the Mechanics Lien Agent (MLA) system under Va. Code § 43-4.01 . This statute applies specifically to construction, alteration, or repair of one- and two-family residential dwellings .
Designation of an MLA
When a building permit is issued for a 1- or 2-family residential property, the property owner may designate a Mechanics Lien Agent (typically a title insurance company or attorney). If designated:
The local building authority must print the MLA's name, full address, and telephone number on the face of the building permit.
The permit must be posted conspicuously at the residential job site.
The Mandatory 30-Day MLA Notice Rule
Subcontractors, sub-subcontractors, and material suppliers who do not deal directly with the property owner must provide formal written Notice to the Mechanics Lien Agent to preserve their lien rights against subsequent good-faith purchasers:
Timeline : Written notice must be sent to the MLA within 30 days of starting work or within 30 days of building permit issuance.
Method of Delivery : Notice must be delivered by registered or certified mail with return receipt requested, or hand-delivered with written receipt. [Building Permit Issued / Work Commences] -------- (30 Days) --------> [Mandatory MLA Notice Deadline]
Impact of Late MLA Notice
If a claimant fails to send notice within the initial 30-day window, their lien rights are not entirely destroyed, but they are severely restricted:
Notice provided after 30 days only protects lien rights for labor performed or materials furnished on or after the date the MLA receives the notice .
All labor or materials supplied prior to the actual date of late MLA notice are permanently barred from being included in any future mechanics' lien.
Required Elements of the Memorandum of Mechanics' Lien
Filing a mechanics' lien requires recording a formal legal document called a Memorandum of Mechanics' Lien . Under Va. Code § 43-5 (for General Contractors) and Va. Code § 43-8 (for Subcontractors), the memorandum must be prepared with exact technical accuracy.
Essential Components of the Memorandum
Claimant Details & License Info : Name, address, and DPOR contractor license number, license class (Class A, B, or C), and license expiration date. Under Va. Code § 54.1-1115 , an unlicensed contractor cannot enforce a mechanics' lien.
Owner & Property Information : Full legal name(s) of the record property owner(s) and legal property description (including Tax Map Parcel Number, subdivision lot/block, deed book reference, and physical street address).
Itemized Financial Account : Total contract amount, itemized value of work performed and materials supplied, total payments received to date, and the net unpaid balance claimed.
Dates of Service : The date from which interest is claimed (typically the last work date or invoice due date) and the date work was completed or terminated.
Notarized Verification Under Oath : The memorandum must contain an affidavit verified under oath before a notary public by the claimant or their authorized representative.
- Form Element Requirement Details Statutory Citation
- Contractor License Must list valid Virginia DPOR License # and Class Va. Code § 54.1-1115
- Property Description Legal metes/bounds, tax map ID, deed book reference Va. Code § 43-5
- Financial Accounting Itemized balance minus credits within 150-day window Va. Code § 43-4
- Verification Executed under oath with notarized affidavit Va. Code § 43-5 / § 43-8
- Circuit Court Recording Procedures
The Memorandum of Mechanics' Lien must be recorded in the land records of the Clerk of the Circuit Court in the city or county where the real property is situated.
Step-by-Step Recording Process
Venue Determination : If a project spans county lines, separate memorandums must be recorded in each respective Circuit Court clerk's office.
Recording Fees & Taxes : The claimant must pay the Circuit Court recording fee (typically determined by document page count and state statutory fee schedules).
Grantor/Grantee Indexing : The Circuit Court clerk indexes the memorandum under the Property Owner's name as Grantor and the Claimant's name as Grantee .
Timestamping & Perfection : The lien becomes officially encumbered and perfected the moment it is accepted, timestamped, and recorded by the clerk.
Service of Notice on Owner and General Contractor
Recording the memorandum in land records is only part of the statutory requirement. Subcontractors and lower-tier claimants must satisfy strict post-recording service rules under Va. Code § 43-7 and Va. Code § 43-9 .
Subcontractor Notice Obligations (Va. Code § 43-7)
A subcontractor must furnish a copy of the recorded Memorandum of Lien to the property owner by certified mail or personal service.
Serving this notice establishes the owner's personal liability up to the amount the owner owes the general contractor at the time notice is served.
Sub-subcontractor Notice Obligations (Va. Code § 43-9)
A sub-subcontractor or lower-tier material supplier must serve a copy of the recorded memorandum upon BOTH the property owner AND the general contractor . [Record Memorandum at Circuit Court]
- |
- +---> [Serve Copy to Property Owner (Va. Code § 43-7)]
- |
- +---> [Serve Copy to General Contractor (If Sub-Sub, Va. Code § 43-9)]
Failure to properly serve notice on all required parties prevents the claimant from establishing the owner's personal liability under Title 43 and invalidates lower-tier lien enforcement.