Study guide

6.4 Sumps, Sewage Pumps, Ejectors & Backwater Valves

Virginia Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Overview, Virginia Licensing Law & Standards of Practice

1.1 Exam Format, Permitted References & Open-Book Strategy 1.2 Definitions, Licensure Requirement & Qualification for the Exam 1.3 Standards of Practice: Designations, Address Changes & License Use 1.4 Standards of Conduct, Prohibited Acts & Revocation of Licensure

2 Chapter 2: Renewal, USBC Administration & General Regulations

2.1 License Renewal, Continuing Education & Reinstatement 2.2 Virginia USBC Administration, Permits, Inspections & Required Tests 2.3 General Regulations: Materials, Protection, Support, Trenching & Structural Safety

3 Chapter 3: Plumbing Fixtures, Clearances & Temperature Control

3.1 Minimum Plumbing Facilities: Table 403.1, Calculations & Separate Facilities 3.2 Fixture Installation: Clearances, Compartments, Connections, Showers & Accessibility 3.3 Water Conservation, Temperature-Limiting Devices, Flushing Devices & Emergency Fixtures

4 Chapter 4: Fixture Traps, Trap Seals & Interceptors

4.1 Fixture Traps, Trap Seals & Trap Seal Protection 4.2 Grease Interceptors: Where Required, Sizing, Flow Control & Virginia's Disposer Rule 4.3 Oil Separators, Sand & Lint Interceptors, Other Interceptors & Corrosive Waste

5 Chapter 5: Sanitary Drainage Systems & Sizing

5.1 Drainage Principles & Drainage Fixture Units (Tables 709.1 and 709.2) 5.2 Horizontal Branches, Building Drains & Building Sewers: Slope, Sizing & Separation 5.3 Soil & Waste Stacks, Stack Offsets, Branch Connections & Relief Vents

6 Chapter 6: Drainage Fittings, Cleanouts, Indirect Waste & Sumps

6.1 Drainage Fittings, Changes of Direction, Joints & Prohibited Connections 6.2 Cleanouts: Locations, Spacing, Size, Clearance & Access 6.3 Indirect Waste, Air Gaps, Air Breaks, Waste Receptors & Condensate Disposal 6.4 Sumps, Sewage Pumps, Ejectors & Backwater Valves

7 Chapter 7: Vent Systems & Sizing

7.1 Vent Purpose, Terminals, Outdoor Extensions & Vent Connections 7.2 Trap-to-Vent Distance (Table 909.1) & Vent Pipe Sizing (906) 7.3 Common Vents, Wet Venting & Waste Stack Vents 7.4 Circuit Venting, Combination Waste & Vent, Island, Single-Stack & Air Admittance Valves

8 Chapter 8: Water Supply, Distribution Sizing, Hot Water & Water Heaters

8.1 Water Service, Pipe Materials, Joints, Valves, Pressure Control & Disinfection 8.2 Water Distribution Design: Flow and Pressure Criteria, Fixture Supplies & Pipe Sizing 8.3 Hot Water Supply: Delivery Distance, Temperature Control, Recirculation & Thermal Expansion 8.4 Water Heaters: Installation, Relief Valves, Discharge Piping & Drain Pans

9 Chapter 9: Backflow Prevention & Cross-Connection Control

9.1 Cross-Connections, Backsiphonage, Backpressure & Degree of Hazard 9.2 Air Gaps, Atmospheric Vacuum Breakers & Hose Connection Protection 9.3 Testable Assemblies: RP, Double Check, PVB & SVB; Location, Testing & Virginia Certification 9.4 Protecting Specific Connections: Beverage Dispensers, Boilers, Sprinklers, Irrigation & Equipment

10 Chapter 10: Storm Drainage Systems & Sizing (with Virginia Amendments)

10.1 Storm Drainage Basics: Disposal, Materials, Rainfall Rates & Roof Area 10.2 Sizing Leaders, Conductors, Horizontal Storm Drains & Gutters (Virginia Tables) 10.3 Secondary (Emergency) Roof Drains, Scuppers & Roof Ponding 10.4 Subsoil Drains, Building Subdrains, Storm Sumps, Controlled-Flow Roofs & Continuous Flow

6.4 Sumps, Sewage Pumps, Ejectors & Backwater Valves

Key Takeaways Explain This Topic AI

A sump must not receive drainage from piping that can discharge to the building sewer by gravity, except in existing structures (IPC 712.1).

A check valve and a full-open valve on the discharge side of the check valve are required in the pump discharge, with access, above the sump cover or in an access pit (712.2).

Sump pits must be at least 18 inches in diameter and 24 inches deep unless otherwise approved, with a gastight removable cover not more than 2 inches below the floor, and must be vented (712.3.2).

Pumps receiving water closet discharge must handle 2-inch spherical solids; others must handle 1/2-inch solids. Minimum capacity is 21 gpm for a 2-inch discharge, 30 gpm for 2-1/2 inch and 46 gpm for 3 inch (712.4.2).

Fixtures on a floor whose finished floor is below the next upstream public sewer manhole cover must be protected by a backwater valve; fixtures on floors above it must not discharge through one, except in existing buildings (714.1).

Last updated: October 2026

When pumping is required (IPC 712.1)

Building subdrains that cannot discharge to the sewer by gravity must discharge into a tightly covered and vented sump . Automatic pumping equipment, or another approved method, lifts the liquid into the gravity drainage system. In other than existing structures, the sump shall not receive drainage from any piping that can discharge by gravity to the building sewer. Upper floors drain by gravity, and only the low fixtures go to the sump. This also means that a pump failure floods only the low level.

Valves in the discharge (IPC 712.2)

A check valve and a full-open valve on the discharge side of the check valve are required between the pump or ejector and the gravity drainage system. The order is: pump, then check valve, then full-open valve, then gravity drain.

Both valves need access . They must be above the sump cover , or, where the discharge pipe is below grade, in an access pit with a removable cover outside the sump.

With the full-open valve downstream of the check valve, a technician can close the full-open valve and service the check valve or pump without draining the discharge line back into the sump.

Sump design (IPC 712.3)

712.3.1: pump capacity and head must suit the expected use.

712.3.2 sump pit: at least 18 inches in diameter and 24 inches deep unless otherwise approved. It needs access, must receive all drainage by gravity, and is made of tile, concrete, steel, plastic or other approved material with a solid bottom that supports the pump. The pit must have a gastight removable cover installed not more than 2 inches below grade or floor level, strong enough for the loads in the area, and it must be vented under Chapter 9 .

712.3.3.1 discharge materials: copper or copper alloy, CPVC, ductile iron, PE or PVC. Under 712.3.3.2 , pipe and fittings must be rated for the maximum operating pressure and temperature, and be suitable for burial where buried.

712.3.4: the effluent level control must keep the effluent from rising to within 2 inches of the invert of the gravity inlet to the sump.

712.3.5: the pump discharge connects to a building sewer, building drain, soil or waste stack, or horizontal branch drain. A connection to horizontal piping must be made through a wye fitting into the top of the pipe, at least 10 pipe diameters from the base of any soil stack, waste stack or fixture drain.

Sewage pumps and ejectors (IPC 712.4)

They must discharge the sump contents to the drainage system automatically .

712.4.1: macerating toilet systems meet ASME A112.3.4/CSA B45.9 and are installed per the manufacturer.

712.4.2 capacity and solids: pumps or ejectors that receive water closet discharge must handle spherical solids up to and including 2 inches . Other pumps or ejectors must handle solids up to and including 1/2 inch .

  • Discharge pipe diameter Minimum pump or ejector capacity (Table 712.4.2)
  • 2 inches 21 gpm
  • 2-1/2 inches 30 gpm
  • 3 inches 46 gpm

Exceptions: grinder pumps that receive water closet discharge need a discharge opening of at least 1-1/4 inches . Macerating toilet assemblies serving a single water closet need a discharge opening of at least 3/4 inch .

Table 712.4.2 relates each discharge size to a minimum flow, which keeps the velocity in the discharge high enough to carry solids. In a 2-inch line, 21 gpm is about 2 feet per second.

Venting sumps (IPC 906.5 and 918.8)

906.5.1: drainage piping below sewer level is vented the same way as a gravity system. Vents for sumps with sewage pumps or ejectors, other than pneumatic types, are sized by Table 906.5.1 , based on the pump's discharge capacity and the vent's developed length.

  • Pump capacity 1-1/4-inch vent 1-1/2-inch vent 2-inch vent
  • 20 gpm up to 270 ft no limit no limit
  • 40 gpm up to 72 ft up to 160 ft no limit
  • 60 gpm up to 31 ft up to 75 ft up to 270 ft
  • 100 gpm less than 10 ft up to 25 ft up to 97 ft

Developed length includes an allowance for fittings. If no better value is available, add 50% to the developed length.

906.5.2: a pneumatic ejector's air pressure relief pipe connects to an independent vent stack through the roof, and is at least 1-1/4 inches.

918.8: air admittance valves shall not be used to vent sumps or tanks , except where the sump or tank vent system has been designed by an engineer . An AAV only admits air and cannot relieve the air pushed out as the sump fills.

Clear-water sumps (IPC 1111 to 1113)

Subsoil drains discharge to a trapped area drain, sump, dry well or approved location above ground. A subsoil sump does not need a gastight cover or a vent (1111.1). Storm and subsoil sump pits are also at least 18 inches in diameter by 24 inches deep unless approved (1113.1.2). Their discharge piping needs a gate valve and a full-flow check valve , except that one- and two-family dwellings need only a check valve (1113.1.4). Storm water must not drain into sewers intended for sewage only (1101.3).

Backwater valves (IPC 714)

714.1: where plumbing fixtures are on a floor whose finished floor elevation is below the elevation of the manhole cover of the next upstream manhole in the public sewer, those fixtures must be protected by a backwater valve in the building drain or the horizontal branch serving them. Fixtures on a floor above that manhole cover elevation must not discharge through the backwater valve.

Exception: in existing buildings , fixtures above the manhole cover elevation may discharge through a backwater valve.

714.2: backwater valves meet ASME A112.14.1, CSA B181.1 or CSA B181.2.

714.3: backwater valves must be installed with access to the working parts .

1101.9: storm drainage systems need backwater valves on the same basis.

Why upper floors stay out: if the public sewer surcharges and the valve closes, upper-floor fixtures that drain through it would back up out of the lowest fixtures. Keeping them on a separate gravity line lets them keep draining.

The trigger is the finished floor elevation , not the flood level rim of the fixtures.

Loading diagram... Sewage ejector discharge arrangement (IPC 712)