Study guide

10.3 Agricultural Buildings, Mobile Homes, RV Parks, Marinas & Temporary Installations (Articles 545-590)

Washington Journeyman Electrician 01 General Journey Level

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Structure & Open-Book Code Navigation

1.1 Washington 01 Electrician Licensing Pathway & Exam Structure 1.2 National Electrical Code Architecture & Fast Lookup Strategies 1.3 Open-Book Exam Rules, Reference Preparation & Pacing

2 Chapter 2: Electrical Theory & Fundamental Math

2.1 Ohm's Law, Joule's Law & Circuit Analysis 2.2 AC Fundamentals, Reactance & Power Factor 2.3 Three-Phase Power Calculations: Wye & Delta Configurations

3 Chapter 3: General Installation Requirements & Conductor Sizing

3.1 Installation Requirements & Working Space Clearances 3.2 Conductor Sizing & Table 310.16 Ampacity 3.3 Temperature Correction Factors & Raceway Derating

4 Chapter 4: Wiring Methods, Raceways & Enclosure Calculations

4.1 Common Wiring Methods & Cable Assemblies 4.2 Conduit & Tubing Installation and Fill Calculations 4.3 Box Fill & Pull Box Sizing Calculations 4.4 Flexible Raceways, ENT, Wireways, Cable Trays, Specialty Cables & Plenum Rules

5 Chapter 5: Branch Circuits, Feeders & Overcurrent Protection

5.1 Branch Circuit Ratings, Receptacle Placement & Lighting 5.2 GFCI, AFCI & Special Protection Requirements 5.3 Overcurrent Protection & Feeder Tap Rules 5.4 Grounded Conductors, Feeders, Outside Circuits & Surge Protection (Articles 200, 215, 225, 280, 285) 5.5 Overcurrent Device Location, Fuses, Circuit Breakers & Transformer Secondary Conductors (Article 240)

6 Chapter 6: Grounding & Bonding (Article 250)

6.1 Grounding vs. Bonding: Core Principles & Definitions 6.2 Grounding Electrode Systems & GEC Sizing 6.3 Main Bonding Jumpers & Equipment Grounding Conductor Sizing

7 Chapter 7: Services, Feeders & Load Calculations

7.1 Electrical Services & Service Equipment (Article 230) 7.2 Dwelling Unit Load Calculations: Standard & Optional Methods 7.3 Commercial Load Calculations & Voltage Drop

8 Chapter 8: Equipment for General Use & Equipment Over 1000 Volts (Articles 400-490)

8.1 Flexible Cords, Fixture Wires, Switches, Receptacles & Panelboards (Articles 400-408) 8.2 Luminaires, Appliances, Space Heating & Other Equipment (Articles 410-427, 455-480) 8.3 Equipment Over 1000 Volts (Article 490 and Related Rules)

9 Chapter 9: Motors, HVAC Equipment, Generators & Transformers (Articles 430-450)

9.1 Motor Branch Circuit Conductor Sizing & Overloads 9.2 Motor Short-Circuit Protection & Disconnecting Means 9.3 Transformers, Generators & Hermetic HVAC Equipment

10 Chapter 10: Hazardous Locations & Special Occupancies (Articles 500-590)

10.1 Hazardous (Classified) Locations (Articles 500–516) 10.2 Health Care Facilities, Places of Assembly & Theaters (Articles 517-540) 10.3 Agricultural Buildings, Mobile Homes, RV Parks, Marinas & Temporary Installations (Articles 545-590)

11 Chapter 11: Special Equipment (Articles 600-695)

11.1 Signs, Cranes, Elevators, EV Charging, Welders, IT Rooms & Industrial Machinery (Articles 600-670) 11.2 Swimming Pools, Spas, Hot Tubs & Fountains (Article 680) 11.3 Solar Photovoltaic Systems, Fuel Cells, Wind & Fire Pumps (Articles 690-695)

12 Chapter 12: Emergency Systems, Special Conditions & Communications (Articles 700-830)

12.1 Emergency, Legally Required & Optional Standby Systems (Articles 700-702) 12.2 Interconnected Power Sources, Energy Storage, Power-Limited Circuits, Fire Alarm & Communications (Articles 705-830)

13 Chapter 13: Washington Electrical Laws & Administrative Code (RCW 19.28 & WAC 296-46B)

13.1 Certificates of Competency, Specialty Scopes & Renewal 13.2 Trainees, Supervision Ratios, Apprenticeship & Qualifying Experience 13.3 Electrical Contractors, Administrators, Bonds & Exemptions 13.4 Permits, Inspections, Class A & Class B Work, and Plan Review 13.5 Civil Penalties, Appeals, Exam Rules & Certificate Discipline 13.6 WAC 296-46B Amendments: Adoption, General Rules, Services, Grounding & Wiring (NEC Chapters 1-4) 13.7 WAC 296-46B Amendments: Special Occupancies, Special Equipment, Emergency Systems & Communications (NEC Chapters 5-8)

10.3 Agricultural Buildings, Mobile Homes, RV Parks, Marinas & Temporary Installations (Articles 545-590)

Key Takeaways Explain This Topic AI

Equipotential planes in livestock areas must be bonded to the electrical grounding system with a solid copper conductor not smaller than 8 AWG (NEC Article 547); in Washington, Article 547 applies only to commercial agricultural buildings over 1,000 square feet.

Mobile home service equipment must be adjacent to the home, not mounted in or on it, within sight and not more than 30 feet from the exterior wall it serves, and rated at least 100 amperes (NEC 550.32).

Every RV site with electrical supply needs a 20-ampere, 125-volt receptacle; at least 20 percent of sites need a 50-ampere, 125/250-volt receptacle and at least 70 percent a 30-ampere, 125-volt receptacle (NEC 551.71).

In the 2020 NEC, marina shore-power receptacles need individual ground-fault protection of equipment of no more than 30 mA, and dock feeders and branch circuits no more than 100 mA (NEC 555.35).

All 125-volt, single-phase, 15-, 20-, and 30-ampere receptacle outlets used by personnel for temporary power need GFCI protection (NEC 590.6(A)).

Last updated: September 2026

Why this section matters

Articles 517 through 590 carry about four questions. Health care and assembly occupancies are in Section 10.2. This section covers the remaining occupancies most likely to appear: agricultural buildings (547) , mobile and manufactured homes (550) , RV parks (551) , marinas and docking facilities (555) , and temporary installations (590) .

Agricultural buildings (Article 547)

Scope: agricultural buildings, or parts of them, where excessive dust or dust with water may accumulate (poultry, livestock, and fish confinement areas where litter or feed dust builds up), and where a corrosive atmosphere exists from poultry or animal excrement or from periodic washing.

Washington limit: Article 547 applies only when the building is larger than 1,000 square feet and used as part of a business or commercial farming activity (WAC 296-46B-547).

Wiring methods. Permitted methods include:

  • Types UF, NMC, and copper SE cable;
  • jacketed Type MC cable;
  • rigid nonmetallic conduit and liquidtight flexible nonmetallic conduit;

other cables and raceways suitable for the location, with approved fittings.

Type NM is not on the list for these areas. Boxes, fittings, and wiring devices must be dust-tight or weatherproof and corrosion resistant. Luminaires must minimize the entry of dust, water, and foreign material and be protected from damage by livestock.

GFCI: receptacles in the covered areas of agricultural buildings (damp or wet locations, dirt confinement areas for livestock, and outdoors) need GFCI protection as the article requires.

Equipotential planes:

Where required: indoors, in livestock confinement areas with concrete floors where metallic equipment that livestock can reach may become energized; outdoors, in concrete slabs where metallic equipment is accessible to livestock and may become energized.

Construction: wire mesh or other conductive elements embedded in or placed under the concrete.

Bonding: connected to the electrical grounding system with a solid copper conductor, insulated, covered, or bare, not smaller than 8 AWG .

Purpose: keep the animal's hooves and the metal it touches at the same potential. Cattle notice stray voltage of a volt or two, which is why the plane matters even when the voltage seems harmless.

Distribution point: farms fed from one service commonly use a site-isolating device at a central distribution point (a yard pole), with each building treated as a separate structure fed by a feeder.

Mobile homes, manufactured homes, and parks (Article 550)

Rule 2020 NEC

Mobile home service equipment must be located adjacent to the mobile home, not mounted in or on it, within sight and not more than 30 ft from the exterior wall it serves. Manufactured homes may have service equipment on the home when the conditions in 550.32(B) are met. 550.32(A)

Service equipment rated at least 100 A at 120/240 V 550.32(C)

A permanently installed feeder has four insulated, color-coded conductors . Equipment grounding conductors may not be identified by stripping their insulation. 550.33(A)

A park's service and feeder calculation uses at least 16,000 VA per mobile home lot , then the demand factors of Table 550.31 550.31

Washington differences (WAC 296-46B-550):

With a permanent feeder wiring method, the equipment grounding conductor may be bare ; bare conductors used underground must be copper. A portable cord is not a permanent method.

A service may be installed on the home only with the manufacturer's written instructions at the first inspection, or when installed at the factory.

Every alteration needs a permit. Circuits leaving the home's own panel need a factory-assembled-structure (FAS) permit, and work beyond the junction box under the home needs a second permit.

Recreational vehicle parks (Article 551)

Receptacles at RV sites (551.71):

  • every site with electrical supply: at least one 20 A, 125 V receptacle;
  • at least 20 percent of sites: a 50 A, 125/250 V receptacle;

at least 70 percent of sites: a 30 A, 125 V receptacle.

Calculated load per site (551.73(A)): 9,600 VA for 50 A sites, 3,600 VA for 20 A and 30 A sites, and 2,400 VA for sites with only a 20 A supply. The demand factors of Table 551.73(A) then apply, based on the number of sites.

Marinas, boatyards, and docking facilities (Article 555)

Water turns a small ground fault into a drowning hazard (electric shock drowning), so this article is strict.

Rule 2020 NEC

Electrical equipment on piers must be above the electrical datum plane . Washington instead sets a flat 12 in. above the deck for transformer terminations, connections, and receptacles (WAC 296-46B-555). 555.3

Permanent warning signs reading "WARNING - POTENTIAL SHOCK HAZARD - ELECTRICAL CURRENTS MAY BE PRESENT IN THE WATER" 555.10

Shore-power receptacles: individual ground-fault protection of equipment set to open at 30 mA or less 555.35(A)(1)

Other 125 V, 15 A and 20 A receptacles: Class A GFCI protection 555.35(A)(2)

Feeder and branch-circuit conductors on docks: ground-fault protection of equipment set at 100 mA or less; coordination with downstream devices is permitted at the feeder 555.35(A)(3)

A leakage current measurement device must be available where multiple receptacles supply shore power 555.35(C)

Each shore-power receptacle needs a readily accessible disconnect not more than 30 in. from the receptacle it controls, in the supply circuit ahead of it 555.36

Equipment grounding conductors on docks must be insulated copper 555.37

Washington amendments (WAC 296-46B-555):

Shore-power receptacles must be at least 20 A , single outlet, locking and grounding or pin-and-sleeve type.

A floating building's supply overcurrent devices need ground-fault protection of 30 mA or less.

"Adjacent" means within sight .

Extra-hard-usage portable power cable may be used as permanent wiring under or within docks.

Temporary installations (Article 590)

Time limits (590.3):

  • construction, remodeling, maintenance, repair, or demolition: for the length of the project;
  • holiday decorative lighting: no more than 90 days ;

emergencies, tests, experiments, and developmental work: as needed.

Temporary wiring must be removed when the project or purpose is complete.

Wiring (590.4):

Feeders and branch circuits may use cable assemblies, or cords and cables of the types in Table 400.4, within the limits of 590.4(B) and (C).

Receptacles on construction sites may not be on the same branch circuit as temporary lighting (590.4(D)).

Cables and cords must be protected from damage and supported. Vegetation may not support overhead spans, except festoon lighting, holiday lighting, and similar with strain relief.

Washington requires a box for every splice in temporary wiring and treats every construction circuit as temporary (WAC 296-46B-590).

GFCI for personnel (590.6):

(A)(1) Receptacles not part of the permanent wiring: all 125 V, single-phase, 15 A, 20 A, and 30 A receptacle outlets used by personnel need GFCI protection.

(A)(2) Permanent receptacles used for temporary power: also GFCI protected. Listed cord sets or devices with GFCI protection meet the rule.

(B) Other receptacles (for example, 250 V or three-phase): GFCI protection, or a written assured equipment grounding conductor program that includes regular testing and a designated person.

Washington also requires a temporary construction service to be disconnected once the permanent service is connected, unless L&I grants an extension (WAC 296-46B-590).