1 Chapter 1: Exam Structure & Open-Book Code Navigation

1.1 Washington 01 Electrician Licensing Pathway & Exam Structure 1.2 National Electrical Code Architecture & Fast Lookup Strategies 1.3 Open-Book Exam Rules, Reference Preparation & Pacing

2 Chapter 2: Electrical Theory & Fundamental Math

2.1 Ohm's Law, Joule's Law & Circuit Analysis 2.2 AC Fundamentals, Reactance & Power Factor 2.3 Three-Phase Power Calculations: Wye & Delta Configurations

3 Chapter 3: General Installation Requirements & Conductor Sizing

3.1 Installation Requirements & Working Space Clearances 3.2 Conductor Sizing & Table 310.16 Ampacity 3.3 Temperature Correction Factors & Raceway Derating

4 Chapter 4: Wiring Methods, Raceways & Enclosure Calculations

4.1 Common Wiring Methods & Cable Assemblies 4.2 Conduit & Tubing Installation and Fill Calculations 4.3 Box Fill & Pull Box Sizing Calculations 4.4 Flexible Raceways, ENT, Wireways, Cable Trays, Specialty Cables & Plenum Rules

5 Chapter 5: Branch Circuits, Feeders & Overcurrent Protection

5.1 Branch Circuit Ratings, Receptacle Placement & Lighting 5.2 GFCI, AFCI & Special Protection Requirements 5.3 Overcurrent Protection & Feeder Tap Rules 5.4 Grounded Conductors, Feeders, Outside Circuits & Surge Protection (Articles 200, 215, 225, 280, 285) 5.5 Overcurrent Device Location, Fuses, Circuit Breakers & Transformer Secondary Conductors (Article 240)

6 Chapter 6: Grounding & Bonding (Article 250)

6.1 Grounding vs. Bonding: Core Principles & Definitions 6.2 Grounding Electrode Systems & GEC Sizing 6.3 Main Bonding Jumpers & Equipment Grounding Conductor Sizing

7 Chapter 7: Services, Feeders & Load Calculations

7.1 Electrical Services & Service Equipment (Article 230) 7.2 Dwelling Unit Load Calculations: Standard & Optional Methods 7.3 Commercial Load Calculations & Voltage Drop

8 Chapter 8: Equipment for General Use & Equipment Over 1000 Volts (Articles 400-490)

8.1 Flexible Cords, Fixture Wires, Switches, Receptacles & Panelboards (Articles 400-408) 8.2 Luminaires, Appliances, Space Heating & Other Equipment (Articles 410-427, 455-480) 8.3 Equipment Over 1000 Volts (Article 490 and Related Rules)

9 Chapter 9: Motors, HVAC Equipment, Generators & Transformers (Articles 430-450)

9.1 Motor Branch Circuit Conductor Sizing & Overloads 9.2 Motor Short-Circuit Protection & Disconnecting Means 9.3 Transformers, Generators & Hermetic HVAC Equipment

10 Chapter 10: Hazardous Locations & Special Occupancies (Articles 500-590)

10.1 Hazardous (Classified) Locations (Articles 500–516) 10.2 Health Care Facilities, Places of Assembly & Theaters (Articles 517-540) 10.3 Agricultural Buildings, Mobile Homes, RV Parks, Marinas & Temporary Installations (Articles 545-590)

11 Chapter 11: Special Equipment (Articles 600-695)

11.1 Signs, Cranes, Elevators, EV Charging, Welders, IT Rooms & Industrial Machinery (Articles 600-670) 11.2 Swimming Pools, Spas, Hot Tubs & Fountains (Article 680) 11.3 Solar Photovoltaic Systems, Fuel Cells, Wind & Fire Pumps (Articles 690-695)

12 Chapter 12: Emergency Systems, Special Conditions & Communications (Articles 700-830)

12.1 Emergency, Legally Required & Optional Standby Systems (Articles 700-702) 12.2 Interconnected Power Sources, Energy Storage, Power-Limited Circuits, Fire Alarm & Communications (Articles 705-830)

13 Chapter 13: Washington Electrical Laws & Administrative Code (RCW 19.28 & WAC 296-46B)

13.1 Certificates of Competency, Specialty Scopes & Renewal 13.2 Trainees, Supervision Ratios, Apprenticeship & Qualifying Experience 13.3 Electrical Contractors, Administrators, Bonds & Exemptions 13.4 Permits, Inspections, Class A & Class B Work, and Plan Review 13.5 Civil Penalties, Appeals, Exam Rules & Certificate Discipline 13.6 WAC 296-46B Amendments: Adoption, General Rules, Services, Grounding & Wiring (NEC Chapters 1-4) 13.7 WAC 296-46B Amendments: Special Occupancies, Special Equipment, Emergency Systems & Communications (NEC Chapters 5-8)

13.3 Electrical Contractors, Administrators, Bonds & Exemptions

Key Takeaways Explain This Topic AI

Under RCW 19.28.041, no one may advertise, bid, or engage in the business of installing or maintaining electrical wiring or equipment without an electrical contractor license, which expires 24 months after issue.

An electrical contractor license application must include a $4,000 bond naming the State of Washington; if the bond is canceled, the license is suspended until a new bond is approved (RCW 19.28.041(3)).

Every contractor must designate a master electrician or administrator who is a member of the firm or a full-time supervisory employee, and no person may be the designee for more than one contractor at a time (RCW 19.28.041(5), .061(1)).

If the designee leaves, the contractor's license is void in 90 days unless another qualified designee is assigned (180 days after the designee's death or incapacity) (RCW 19.28.061(1)).

Owners doing work on their own residence, farm, or place of business need no license or certificate, unless the work is a new building for rent, sale, or lease or the property is sold within 12 months (RCW 19.28.261).

Last updated: September 2026

Why this section matters

The WA Codes section tests the business side of the trade as well as field rules. Expect questions on the bond amount , the administrator's duties , what happens when the administrator leaves, and when an owner may do his or her own work.

Contractor license (RCW 19.28.041)

It is unlawful to "advertise, offer to do work, submit a bid, engage in, conduct, or carry on the business of installing or maintaining wires or equipment to convey electric current" without an unrevoked, unsuspended, unexpired electrical contractor license (RCW 19.28.041(1)). Key points:

Licenses expire 24 calendar months after issue.

The application lists the business name and location, the owners or officers, and workers' compensation coverage. L&I also requires a valid UBI number.

The application must include a $4,000 bond with the State of Washington as obligee. L&I also accepts an assignment of savings in place of the bond. If the bond is canceled or the surety withdraws, the license is suspended until a new bond is approved (RCW 19.28.041(3)).

The applicant must designate someone who holds a master journey level certificate, a master specialty certificate in that specialty, or an administrator certificate (RCW 19.28.041(5)).

Only L&I licenses electrical contractors. No city or county may require a separate electrical license, bond, or fee for the same purpose (RCW 19.28.041(4)).

A person damaged by a contractor's breach of the bond conditions may sue the surety in superior court (RCW 19.28.071).

Telecommunications contractors also need a UBI number, a $4,000 bond or assignment of savings, a designated telecommunications administrator, and at least $170,000 of general liability insurance (L&I).

The designated master electrician or administrator (RCW 19.28.061)

  • Rule What the statute says
  • Who can be designated A member of the firm or a full-time supervisory employee

One contractor only "No person may concurrently qualify as master electrician or administrator for more than one contractor."

Designee leaves The contractor's license is void within 90 days unless another master electrician or administrator is qualified

Designee dies or is incapacitated License void within 180 days unless replaced; the contractor notifies L&I in writing within 10 days

Designee quits The master electrician or administrator notifies L&I in writing within 10 days

Duties under RCW 19.28.061(5): the designee must:

  • be available during working hours to carry out the administrator's duties;
  • ensure that all electrical work complies with Washington's installation laws and rules;
  • ensure that proper electrical safety procedures are used;
  • ensure that all required labels, permits, and licenses are used;
  • see that correction notices from an inspecting authority are complied with; and

notify L&I within 10 days if the relationship with the contractor ends.

L&I may not change these duties by rule (RCW 19.28.061(6)).

Administrator certificates. An administrator certificate requires passing an administrator exam. No L&I pre-approval or experience is required (L&I; PSI bulletin). The 01 general administrator exam has 65 NEC and theory questions, 17 Washington codes questions, and 10 major load calculation questions. The certificate is renewed every three years on or before the holder's birthday (RCW 19.28.061(2)). An administrator certificate alone does not allow the holder to perform electrical installations. The holder also needs an electrician certificate, or must work as a supervised trainee.

Exemptions from licensing and certification (RCW 19.28.261)

Exemption Condition

Owner's own property A person may do electrical work at his or her own residence, farm, place of business, or other owned property unless the work is on a new building intended for rent, sale, or lease, or on property offered for sale within 12 months after it was obtained

Owner-occupied new residential of up to four units Exempt if the owner files a signed affidavit to do the work and live in one unit as a principal residence. Available once every 24 months; the owner is expected to live there 24 months after completion.

Employees on employer's premises The certification provisions don't apply to regularly employed employees working on their employer's premises, with the same new-building and 12-month-sale limits

Utilities An electrical utility and its employees working on the utility's own lines and systems

Telephone, telegraph, radio, television Installation and maintenance of those wires and equipment (RCW 19.28.261(4))

Householder help A householder may help, or be helped by, a friend, neighbor, or relative when none of them holds out as being in the electrical business

Common carriers Common carriers and their employees under the Interstate Commerce Act

An exemption from licensing or certification is not an exemption from permits and inspection . An owner doing exempt work still buys an electrical work permit and gets the work inspected (WAC 296-46B-901).

Temporary construction services. A registered general contractor may install one temporary construction service per address and is treated as the owner when all of these are true (WAC 296-46B-901(14)):

the work is limited to mounting and bracing a preassembled pole or pedestal service, driving a ground rod or plate, and connecting the grounding electrode conductor;

  • the service is 200 A or less at 250 V or less;
  • it supplies no feeders, and branch circuits of 50 A or less supply only receptacles on the service or pole;
  • the general contractor owns the equipment and was hired by the property owner;

the general contractor buys a permit and gets the service inspected before it is energized.

Penalties (WAC 296-46B-915)

Violation 1st 2nd 3rd Each after

Offering, bidding, advertising, or doing electrical work without an electrical contractor license $1,000 $2,000 $3,000 $10,000

  • Work outside the scope of the firm's specialty contractor license $500 $1,500 $3,000 $6,000
  • Employing someone without a valid certificate or training certificate $250 $500 $500 $500