Study guide
1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)
Washington Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Administration, Licensing, & General Regulations
1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)
2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances
2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1
3 Chapter 3: Water Heaters & Storage Tanks
3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)
4 Chapter 4: Water Supply and Distribution Systems
4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)
5 Chapter 5: Backflow Prevention & Cross-Connection Control
5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)
6 Chapter 6: Sanitary Drainage Systems & Sizing
6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules
7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors
7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)
8 Chapter 8: Vents and Venting Fundamentals
8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)
9 Chapter 9: Vent Terminations, Traps, & Priming
9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)
10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards
10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)
11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis
11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations
12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing
12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4
13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics
13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)
14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy
14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist
1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)
Key Takeaways Explain This Topic AI
UPC Table 313.3 supports copper tube 1-1/2 inches and smaller every 6 feet horizontally and 2 inches and larger every 10 feet, with vertical support at each floor not over 10 feet.
Schedule 40 PVC and ABS DWV is supported every 4 feet horizontally, at the base and each floor vertically, with provision for expansion every 30 feet (UPC Table 313.3).
Hubless cast-iron is supported at every other joint unless over 4 feet, then at each joint, within 18 inches of the joint, and braced at 40-foot intervals (Table 313.3).
PEX 1 inch and smaller is supported every 32 inches horizontally; 1-1/4 inch and larger every 4 feet (UPC Table 313.3).
UPC Table 313.6 requires 3/8-inch hanger rods for 1/2 to 4-inch pipe, 1/2-inch rods for 5 to 8-inch pipe, and 5/8-inch rods for 10 to 12-inch pipe.
Last updated: September 2026
Why Support Spacing Is Tested
Hangers keep drainage piping on grade, carry the weight of pipe and contents, and restrain movement. A sagging drain loses its slope and creates a belly that collects solids. Under UPC 313.1 , piping must be supported as the code, the manufacturer's installation instructions, and the AHJ require. Section 313.2 requires hangers strong enough for the pipe and its contents, and requires that piping be isolated from incompatible materials . Section 313.4 requires support that maintains alignment and prevents sagging. Section 313.5 requires underground piping to lie on a firm bed for its entire length.
Hanger spacing is a favorite closed-book question because it is pure recall. Table 313.3 is not one of the tables PSI provides, so memorize the core rows below.
UPC Table 313.3: Hangers and Supports
Material (joint) Horizontal Vertical
Cast iron, hub and spigot (lead and oakum or compression gasket) Every 5 feet , except 10 feet where 10-foot lengths are installed Base and each floor, not over 15 feet
Cast iron, hubless (shielded coupling) Every other joint , unless over 4 feet, then each joint Base and each floor, not over 15 feet
Copper and copper alloy 1-1/2 inches and smaller: 6 feet ; 2 inches and larger: 10 feet Each floor, not over 10 feet
Steel pipe for water or DWV 3/4 inch and smaller: 10 feet ; 1 inch and larger: 12 feet Every other floor, not over 25 feet
Schedule 40 PVC and ABS DWV All sizes 4 feet ; allow for expansion every 30 feet Base and each floor; mid-story guides; expansion every 30 feet
- CPVC 1 inch and smaller: 3 feet ; 1-1/4 inches and larger: 4 feet Base and each floor; mid-story guides
- PEX 1 inch and smaller: 32 inches ; 1-1/4 inches and larger: 4 feet Base and each floor; mid-story guides
PE-RT and polypropylene 1 inch and smaller: 32 inches; 1-1/4 inches and larger: 4 feet Base and each floor; mid-story guides
- PEX-AL-PEX and PE-AL-PE All sizes (1/2 to 1 inch) 98 inches Base and each floor; mid-story guides
- Lead Continuous support Not over 4 feet
Notes to the cast-iron rows:
A support must be adjacent to the joint, not over 18 inches from it.
Brace at intervals not exceeding 40 feet to prevent horizontal movement.
Provide support at each horizontal branch connection .
For hubless pipe, hangers shall not be placed on the coupling .
Memory hook: "5-6-10-12-4-3-32." Cast iron 5 ft, copper 6 ft (small) or 10 ft (2 inches and up), steel 10 or 12 ft, PVC and ABS 4 ft, CPVC 3 ft (small), PEX 32 inches.
Hanger Rod Sizes (UPC Table 313.6)
- Pipe and tube size Minimum rod size
- 1/2 to 4 inches 3/8 inch
- 5 to 8 inches 1/2 inch
- 10 to 12 inches 5/8 inch
- Worked example
A 3-inch hubless cast-iron building drain runs 60 feet horizontally in a crawl space using 10-foot pipe lengths, so joints fall every 10 feet. The pipe is over 4 feet between joints, so support each joint , with each hanger within 18 inches of the joint and never on the coupling. Add a support at each branch connection. Because of the 40-foot bracing note, the run also needs bracing at intervals not exceeding 40 feet. Each hanger rod must be at least 3/8 inch .
Dissimilar Metals and Transitions
Galvanic corrosion occurs when dissimilar metals such as copper and galvanized steel touch in the presence of water. The UPC addresses it several ways:
310.6: Except for necessary valves, dissimilar-metal connections must be in exposed or accessible locations.
313.2: Piping must be isolated from incompatible materials . In practice, that means copper-plated or plastic-coated hangers, or isolation pads, on copper tube.
605.15: Dielectric unions installed where metals differ must comply with ASSE 1079 .
605.16.1: Copper to threaded pipe in water systems must use a copper alloy adapter , a copper alloy nipple at least 6 inches long , a dielectric fitting , or an ASSE 1079 dielectric union .
507.1: The AHJ may require an approved dielectric insulator on water heater connections.
Expansion and Contraction
Section 312.1 requires "approved provisions … for expansion of hot water piping." Section 312.2 requires provision for expansion, contraction, and structural settlement. Table 313.3 requires PVC and ABS DWV to allow for expansion every 30 feet. Plastics move far more than metals:
- Material Approximate expansion coefficient (in/in/°F) Growth per 100 ft at a 50°F rise
- PEX 0.00011 about 6.6 in
- PVC 0.00003 about 1.8 in
- Copper 0.0000094 about 0.56 in
- Steel 0.0000065 about 0.39 in
Formula: growth (inches) = length (inches) × coefficient × temperature change (°F).
Example: 80 feet of PVC DWV carrying 140°F discharge that was installed at 60°F: 960 in × 0.00003 × 80°F ≈ 2.3 inches . That movement is why the table requires expansion provisions and why plastic stacks get mid-story guides rather than rigid clamps at every point. Coefficients vary by manufacturer; use the manufacturer's data for real designs.
Unions (UPC 315.1)
Unions are allowed in drainage piping only where accessible in the trap seal or between a fixture and its trap . In the vent system they are allowed except underground or in wet vents . They are allowed anywhere in the water supply system.