1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712)

Washington Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Administration, Licensing, & General Regulations

1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)

2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances

2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1

3 Chapter 3: Water Heaters & Storage Tanks

3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)

4 Chapter 4: Water Supply and Distribution Systems

4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)

5 Chapter 5: Backflow Prevention & Cross-Connection Control

5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)

6 Chapter 6: Sanitary Drainage Systems & Sizing

6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules

7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors

7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)

8 Chapter 8: Vents and Venting Fundamentals

8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)

9 Chapter 9: Vent Terminations, Traps, & Priming

9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)

10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards

10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)

11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis

11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations

12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing

12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4

13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics

13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)

14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy

14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist

1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712)

Key Takeaways Explain This Topic AI

UPC 104.4.3 voids a permit if work does not start within 180 days or is suspended or abandoned for 180 days after starting.

UPC 105.2 lists three required inspections: underground before backfill, rough-in before wall or ceiling membranes, and final on completion.

A DWV water test needs at least a 10-foot head held 15 minutes; the air test is 5 psi held 15 minutes, and plastic pipe may not be air tested (UPC 712).

Water supply piping is tested at not less than its working pressure for 15 minutes; a 50 psi air test may substitute except on plastic piping (UPC 609.4).

Washington's 609.9 amendment disinfects new or repaired water systems at 50 ppm chlorine for 24 hours or 200 ppm for 3 hours.

Last updated: September 2026

Administration: The Authority Having Jurisdiction

UPC Chapter 1 gives the Authority Having Jurisdiction (AHJ) power to enforce the code, interpret it, and adopt supplemental rules. The AHJ is usually the city or county plumbing inspector. Washington's WAC 51-56 amendments change two Chapter 1 items:

102.1 Conflict Between Codes is deleted.

103.3.1 Certification is replaced by "state rules and regulations concerning certification shall apply." In other words, chapter 18.106 RCW controls who may do plumbing (Section 1.1), not local licensing.

The AHJ acting in good faith is not personally liable for enforcement actions (103.2). A violation of the code is a misdemeanor, and each day it continues is a separate offense (106.3). A notice of correction must be complied with within 10 days of receipt (106.2).

Permits (UPC 104)

Under 104.1, it is unlawful to install, alter, repair, replace, or remodel a plumbing system without first obtaining a separate plumbing permit for each separate building or structure . The permit application must describe the work and location, state the intended occupancy, and include construction documents when the AHJ requires them.

Exempt work (104.2)

A permit is not required for:

Stopping leaks in drain, soil, waste, or vent pipe. However, if a trap or drain, soil, waste, or vent pipe becomes defective and must be removed and replaced with new material, that is new work and needs a permit and inspection.

Clearing stoppages , including removing and reinstalling a water closet, or repairing leaks in pipes, valves, or fixtures, if the repair does not replace or rearrange valves, pipes, or fixtures.

An exemption from the permit does not authorize work that violates the code.

Expiration and extensions

  • Rule UPC section Time limit
  • Application with no permit issued 104.3.3 Expires 180 days after filing; one extension of up to 180 days
  • Work never commenced 104.4.3 Permit void 180 days after issuance
  • Work suspended or abandoned after starting 104.4.3 Permit void after 180 days

Renewing an expired permit, no plan changes, suspension not over 1 year 104.4.3 New permit at one-half the normal fee

Extension of an unexpired permit 104.4.4 Written request; up to 180 days; only once

Work started before a permit is issued triggers a special investigation. The investigation fee equals the permit fee (104.5.1 and 104.5.2).

Inspections (UPC 105)

Section 105.2 requires three inspections. The permittee is responsible for scheduling them:

Underground inspection: after trenches are excavated and bedded and piping is installed, but before backfill .

Rough-in inspection: before wall or ceiling membranes are installed.

Final inspection: when the installation is complete.

No plumbing may be covered, concealed, or put into use until it has been tested, inspected, and approved (105.2.1.1 and 105.2.1.2). If work is covered first, the AHJ can order it uncovered (105.2.1). The AHJ may require an inspection request not less than 1 working day in advance (105.2.3). Section 105.2.4 requires notice at least 24 hours before the work is to be inspected. The permit holder must make sure the work will stand the test before calling (105.2.5) and must furnish the equipment, material, and labor for the test. A reinspection fee may be charged when work is not ready, corrections are not made, approved plans are not available, or access is not provided (105.2.6). It is not meant to charge the first time a job is rejected for a code violation.

Testing the DWV System (UPC 712)

Section 712.1 allows water or air testing, except that plastic pipe shall not be tested with air .

Water test (712.2): Close every opening except the highest one and fill the system to the point of overflow. When testing in sections, no section may be tested with less than a 10-foot head of water . The upper 10 feet of the preceding section must be retested with each new section. The water must stand at least 15 minutes before inspection starts , and the system must be tight at all points.

Air test (712.3): Close all other inlets and outlets and apply a uniform gauge pressure of 5 psi , or enough to balance 10 inches of mercury . Hold it without adding air for at least 15 minutes .

Final test: After fixtures are set and their traps are filled, the system gets a final test (712.1). The AHJ may require an air test of an existing system believed to be defective (105.3.1).

A 10-foot head of water exerts about 4.3 psi (10 × 0.433). That is why the water test and the 5 psi air test are roughly comparable. Tests are conducted in the presence of the AHJ or its representative (105.3).

Testing and Disinfecting the Water System

Pressure test (609.4): Test the completed hot and cold water system, or each section, with potable water at not less than the working pressure under which it will be used. The piping must hold without leaking for at least 15 minutes . A 50 psi air test may substitute for the water test, except for plastic piping .

Disinfection (WAC 51-56 amendment to 609.9): Where the AHJ requires disinfection of new or repaired potable water systems, use the method prescribed by the health authority. If the health authority prescribes none, use this procedure:

Flush with potable water until potable water appears at the outlets.

Fill the system with chlorinated water and valve it off. Use either 50 ppm for 24 hours or 200 ppm for 3 hours .

Flush until the chlorine residual at the outlets does not exceed that of the flushing water.

Repeat if a bacteriological test by a laboratory certified for drinking water in Washington shows contamination persists.

Exam trap: "Test water piping at 100 psi" is not the UPC rule. The UPC test pressure is the working pressure , and the air alternative is 50 psi .