Study guide

5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5)

Washington Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Administration, Licensing, & General Regulations

1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)

2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances

2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1

3 Chapter 3: Water Heaters & Storage Tanks

3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)

4 Chapter 4: Water Supply and Distribution Systems

4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)

5 Chapter 5: Backflow Prevention & Cross-Connection Control

5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)

6 Chapter 6: Sanitary Drainage Systems & Sizing

6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules

7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors

7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)

8 Chapter 8: Vents and Venting Fundamentals

8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)

9 Chapter 9: Vent Terminations, Traps, & Priming

9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)

10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards

10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)

11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis

11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations

12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing

12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4

13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics

13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)

14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy

14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist

5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5)

Key Takeaways Explain This Topic AI

UPC Table 603.3.1 requires minimum air gaps of 1, 1-1/2, and 2 inches for effective openings up to 1/2, 3/4, and 1 inch, and twice the opening for openings over 1 inch.

Where a sidewall affects the outlet, the minimums rise to 1-1/2, 2-1/4, and 3 inches, or three times the opening (UPC Table 603.3.1).

A single sidewall affects an air gap when it is within three times the effective opening of the spout's inside edge; two intersecting walls when within four times (Table 603.3.1 note 1).

Where a backflow device has no critical level marking, the bottom of the device is the critical level (UPC Chapter 2 definition).

Hose bibbs need a nonremovable hose-bibb vacuum breaker or backflow preventer, or an AVB at least 6 inches above the highest point of use (UPC 603.5.7).

Last updated: September 2026

Air Gaps (UPC 603.3.1 and Table 603.3.1)

The UPC defines an air gap (water distribution) as "the unobstructed vertical distance through the free atmosphere between the lowest opening from a pipe or faucet conveying potable water to the flood-level rim of a tank, vat, or fixture." Because nothing connects the outlet to the receptor, an air gap protects against every hazard level and both backsiphonage and backpressure .

  • Effective opening Not affected by sidewalls Affected by sidewalls
  • Not greater than 1/2 inch 1 inch 1-1/2 inches
  • Not greater than 3/4 inch 1-1/2 inches 2-1/4 inches
  • Not greater than 1 inch 2 inches 3 inches
  • Greater than 1 inch 2 × the effective opening 3 × the effective opening

Notes to the table:

When walls do not count: Sidewalls, ribs, or similar obstructions do not affect the gap if they are farther from the inside edge of the spout than 3 times the effective opening (one wall) or 4 times the effective opening (two intersecting walls).

When walls do count: A wall, rib, or obstruction rising from the water surface to or above the spout's horizontal plane, and closer than note 1 allows, counts. The effect of three or more walls has not been determined; in that case, measure the gap from the top of the wall .

Effective opening: The minimum cross-sectional area at the control valve seat, or of the supply pipe or tubing feeding the outlet. With two or more supply lines, use the smaller of the sum of their areas or the area of the single outlet.

Gaps under 1 inch: Permitted only as a permanent part of a listed assembly tested under actual backflow conditions from 0 to 25 inches of mercury vacuum.

Worked examples

3/4-inch fill spout 6 inches from the tank wall: 3 × 0.75 = 2.25 inches; 6 inches is more than that, so the wall does not affect it. Minimum gap: 1-1/2 inches .

3/4-inch spout 1 inch from a single wall: the wall counts. Minimum gap: 2-1/4 inches .

1-1/2-inch fill line in a corner, 5 inches from both intersecting walls: 4 × 1.5 = 6 inches, and 5 inches is within that, so the walls count. Minimum gap: 3 × 1.5 = 4-1/2 inches .

2-inch line well clear of walls: 2 × 2 = 4 inches .

Drainage air gaps differ: Potable water discharged to a drainage system needs a gap of 2 pipe diameters, not less than 1 inch (603.4.4). Indirect waste air gaps and air breaks are covered in Section 7.3.

Critical Level

The critical level (C-L or C/L) marking on a vacuum breaker or backflow device is set by the testing laboratory. It determines the minimum elevation above the flood-level rim at which the device may be installed. If a device has no critical level marking, the bottom of the vacuum breaker, combination valve, or device is the critical level. Measure every "6 inches above" or "12 inches above" requirement from the critical level.

Device or application Minimum height of critical level

Flushometer valve AVB (603.5.1) 6 inches above the bowl's overflow rim or the highest part of the urinal, or per listing

  • Tank ballcock (603.5.2) 1 inch above the full opening of the overflow pipe
  • AVB, general (Table 603.2) 6 inches above all downstream piping and the flood-level rim
  • PVB and SVB (Table 603.2) 12 inches above all downstream piping and the flood-level rim
  • Deck- or equipment-mounted vacuum breakers (603.5.13) 1 inch above the flood-level rim, per listing

VB on a water supply inlet to a tank or vat (603.5.5) 6 inches , or per listing, on the discharge side of the last valve

Specific Applications (UPC 603.5)

  • Section Application Required protection
  • 603.5.3 Water closet flushometer tanks Approved assembly, device, or method

603.5.4 Heat exchangers Protect the potable side. Double-wall exchangers need a space between walls vented to atmosphere ; single-wall exchangers in indirect-fired heaters must meet 505.4.1

603.5.5 Water supply inlets to tanks, vats, sumps, and pools Air gap; a listed vacuum breaker on the discharge side of the last valve with its critical level at least 6 inches up; or a backflow preventer suited to the degree of hazard

603.5.7 Outlets with hose threads (except water heater drains, boiler drains, and clothes washer connections) Nonremovable hose-bibb backflow preventer or vacuum breaker, or an AVB at least 6 inches above the highest point of use on the discharge side of the last valve. In freezing climates, use a listed self-draining frost-proof hose bibb with integral protection

603.5.8 Water-cooled compressors and degreasers Backflow preventer per the chapter; protection against backpressure if the equipment can produce it

603.5.9 Aspirators Vacuum breaker on the inlet; discharge through an air gap

603.5.11 Nonpotable lines that cannot be corrected Treat as nonpotable; label outlets "CAUTION: NONPOTABLE WATER, DO NOT DRINK"

603.5.15 Health care and laboratories Vacuum breakers for bedpan washer hoses at least 5 feet above the floor; hose connections at least 6 feet above the floor

603.5.16 Portable cleaning equipment, dental vacuum pumps, chemical dispensers Air gap, AVB, SVB, or RP

603.5.17 Freeze-proof yard hydrants and stop-and-waste valves that drain into the ground May not be installed underground

Containment Devices Set by the Purveyor

Water purveyors sometimes install a residential dual check at single-family meters. It is not a testable assembly and is not in UPC Table 603.2, but it still closes the system. WA 608.3 then requires a thermal expansion tank on the building side (Section 3.4). Under WAC 246-290-490, a purveyor serving a single-family home may rely on UPC point-of-hazard devices. An example is a properly installed AVB on an irrigation system, provided the premises is not on the high-hazard list.