Study guide
5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)
Washington Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Administration, Licensing, & General Regulations
1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)
2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances
2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1
3 Chapter 3: Water Heaters & Storage Tanks
3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)
4 Chapter 4: Water Supply and Distribution Systems
4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)
5 Chapter 5: Backflow Prevention & Cross-Connection Control
5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)
6 Chapter 6: Sanitary Drainage Systems & Sizing
6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules
7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors
7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)
8 Chapter 8: Vents and Venting Fundamentals
8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)
9 Chapter 9: Vent Terminations, Traps, & Priming
9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)
10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards
10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)
11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis
11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations
12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing
12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4
13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics
13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)
14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy
14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist
5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)
Key Takeaways Explain This Topic AI
Washington's 603.4.2 requires backflow assemblies to be tested by a DOH-certified backflow assembly tester at installation, repair, or relocation and at least annually thereafter.
WAC 246-290-490 also requires inspection and testing after a backflow incident and annually unless the purveyor requires more frequent testing.
A BAT's field test kit must be pressure-tested and accuracy-checked by an independent laboratory within the 12 months before a test (WAC 246-292-034).
DOH operator certificates, including BAT certificates, are valid until December 31 each year and are renewed annually (WAC 246-292-090).
For an existing high health hazard, the purveyor must see backflow protection installed within 90 days of notifying the consumer, or on an alternate acceptable schedule (WAC 246-290-490).
Last updated: September 2026
Who Tests, and When
Washington amendment to UPC 603.4.2: For devices other than those the Department of Health regulates with the purveyor, the AHJ must ensure the premises owner or responsible person has each backflow prevention assembly tested by a Washington State Department of Health certified backflow assembly tester (BAT) :
At the time of installation, repair, or relocation , and
At least annually thereafter , unless the AHJ requires more frequent testing.
Washington's amendment to 603.2 adds several related duties:
The person in control must maintain every device in good working order.
A defective device must be repaired or replaced .
No device may be removed, relocated, or substituted without AHJ approval .
Testing must be done by a DOH-certified BAT.
Washington's definition 205.0 says a certified backflow assembly tester is certified by DOH under chapter 246-292 WAC . A BAT inspects and tests assemblies, and maintains and repairs them in compliance with chapter 18.106 RCW.
The Purveyor's Program (WAC 246-290-490)
Every public water system purveyor must run a written cross-connection control program. Its required elements include:
- Element Requirement
- Legal authority A local ordinance, resolution, code, or bylaw establishing the program and corrective actions
Hazard evaluation Evaluate new connections before service starts (connections made on or after April 9, 1999); re-evaluate periodically and whenever the use changes
Staffing At least one Cross-Connection Control Specialist (CCS)
Testing quality control Documentation of BAT certification and test kit calibration , test report contents, and time frames for submitting reports, all set by the purveyor
Records Keep incident records and annual summary reports for 5 years ; file an annual program summary report
Corrective action May deny or discontinue water service until the hazard is controlled, or require or install a premises isolation assembly. The AHJ must be notified first, except in an emergency
Inspection and testing duties (WAC 246-290-490(7))
A CCS inspects backflow preventer installations for protection commensurate with the hazard.
A BAT or CCS inspects air gaps and assemblies for correct installation and approval status.
Only a BAT tests assemblies for proper operation.
When: upon installation, repair, reinstallation, or relocation; upon installation or replumbing of an air gap; after a backflow incident ; and annually thereafter . The purveyor may require more frequent tests for high-hazard premises or assemblies that repeatedly fail.
AVBs on irrigation systems are inspected at installation, after an incident, and after repair, reinstallation, or relocation.
Tests use procedures acceptable to DOH, such as the USC Manual of Cross-Connection Control .
Retrofit timelines
New connections (on or after April 9, 1999): protection is installed and tested before service is provided .
Existing connection with a high health hazard: installed within 90 days of the purveyor's notice, or on an alternate schedule acceptable to the purveyor.
Existing low hazard: on a schedule acceptable to the purveyor.
BAT Certification and Test Kits (WAC 246-292)
Certification: Apply to DOH, then pass a computer-based examination and a DOH practical examination .
Renewal: Certificates are valid until December 31 each year and are renewed annually. BATs must also pass a professional growth examination during each professional growth reporting period.
Test kit: The kit must be evaluated, pressure-tested, and checked for accuracy by an independent laboratory at least once within the 12 months before a test. It must be recalibrated, repaired, or replaced if it fails.
Reports: The BAT gives a completed inspection and field test report to both the owner and the purveyor . The report includes the kit's information, the BAT's certification number, the readings, and the BAT's signature.
Field Test Criteria (ASSE Series 5000 and USC Methods)
UPC 603.4.2 requires testing by procedures in the ASSE Series 5000 standards. Common passing criteria:
- Assembly Component Passing result
- RP Differential relief valve Opens at 2.0 psid or more
- RP First check Holds at least 5.0 psid , and more than the relief valve opening point
- RP Second check Holds tight against backpressure
- DC First and second checks Each holds at least 1.0 psid
- PVB / SVB Air inlet Opens at 1.0 psid or more and fully opens
- PVB / SVB Check valve Holds at least 1.0 psid
An RP that discharges steadily from its relief port under normal flow usually has a fouled first check . That lowers the zone differential until the relief valve opens. Testers isolate and test the first check before blaming the relief valve.
Where the Plumber Fits
- Credential Issued by Scope
- Journey level plumber (PL01) L&I Installs, replaces, and repairs backflow assemblies as plumbing work
Backflow specialty plumber (PL30) L&I Maintenance and repair of assemblies inside buildings. Requires a current DOH BAT certification to apply. Does not include installing or replacing assemblies
- BAT DOH Inspects and field tests assemblies and air gaps protecting the public system; signs test reports
- CCS DOH Runs the purveyor's program and assesses hazards
A journey level plumber who is not also a BAT cannot sign a test report. A BAT who is not certified by L&I cannot perform plumbing work that requires a plumbing certificate.