Study guide

14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist

Washington Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Administration, Licensing, & General Regulations

1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)

2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances

2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1

3 Chapter 3: Water Heaters & Storage Tanks

3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)

4 Chapter 4: Water Supply and Distribution Systems

4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)

5 Chapter 5: Backflow Prevention & Cross-Connection Control

5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)

6 Chapter 6: Sanitary Drainage Systems & Sizing

6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules

7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors

7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)

8 Chapter 8: Vents and Venting Fundamentals

8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)

9 Chapter 9: Vent Terminations, Traps, & Priming

9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)

10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards

10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)

11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis

11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations

12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing

12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4

13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics

13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)

14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy

14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist

14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist

Key Takeaways Explain This Topic AI

DWV tests use a 10-foot water head or 5 psi air for 15 minutes, water supply tests use working pressure or 50 psi air, and plastic is never air tested.

Water closet front clearance in Washington is 24 inches, reduced to 21 inches in dwelling and sleeping units; the side clearance is 15 inches and the center-to-center spacing 30 inches.

A T&P relief valve's pressure setting may not exceed 150 psi, and its discharge ends 6 to 24 inches above the floor or grade, unthreaded, and never into the heater pan.

UPC Table 1002.2 limits trap arms to 30, 42, 60, 72, and 120 inches for 1-1/4 through 4-inch arms, and a water closet to 6 feet from its vent.

A common distractor is the IPC or unamended UPC value; in Washington, choose the amended 2015 UPC value.

Last updated: September 2026

  • Numbers by Chapter
  • Administration and testing (Chapter 1, 609, 712)

Permit void 180 days after issue if work has not started, or after 180 days of suspension. Renewal within 1 year costs half the fee.

Inspection notice: 1 working day (105.2.3) or 24 hours (105.2.4). Correction notices must be complied with in 10 days .

DWV: 10-foot head, 15 minutes , or 5 psi air, 15 minutes . No air on plastic.

Water: working pressure, 15 minutes , or 50 psi air (not on plastic). Disinfection (Washington): 50 ppm for 24 hours or 200 ppm for 3 hours .

General regulations (Chapter 3)

Nail plates No. 18 gauge , where pipe is within 1 inch of the framing face, extending 1-1/2 inches past the pipe.

Backfill in thin layers to 12 inches over the pipe. Thermoplastic sewer bedding 4 inches , with side compaction in 6-inch lifts.

Hangers: copper 6 ft (1-1/2 inch and smaller) or 10 ft ; PVC and ABS 4 ft ; PEX 32 in ; hubless cast iron at every other joint, or each joint if over 4 feet.

Fixtures (Chapter 4, Washington)

15 / 30 / 24 (21) inches for water closets; 12 / 24 inches for urinals.

Shower 900 sq in plus a 30-inch circle to 70 inches; threshold 2 to 9 inches ; liner 3 inches above the dam; pan test filled to the rough threshold.

Waste outlets: lavatory 1-1/4 , tub and sinks 1-1/2 , shower and service sink 2 inches.

Temperature limits: showers 120°F (ASSE 1016), tubs and public lavatories 120°F (ASSE 1070), bidets 110°F .

Water heaters (Chapter 5, 608)

Washington first hour ratings 42–80 gallons . Straps in the upper and lower thirds, 4 inches from the controls. Garage ignition sources 18 inches up. Pan 1-1/2 inches deep with a 3/4-inch drain.

Pressure relief setting 150 psi or less . Discharge full size, 6 to 24 inches above grade, not threaded, not into the pan.

Water supply (Chapter 6)

Copper at least Type L ; Type M only aboveground in buildings or underground outside structures. Lead: 0.25% wetted surfaces, 0.2% solder.

Velocity 8 ft/s cold, 5 ft/s hot . Pressure 15 psi minimum residual , 80 psi maximum static , with 80% of the regulator setting used for sizing.

Booster cutoff 10 psi , within 5 feet . PEX kept 18 inches from the water heater. Unions within 12 inches of equipment.

Backflow (Chapter 6, Washington, DOH)

AVB 6 inches , no downstream valve, not over 12 hours of pressure in 24. PVB and SVB 12 inches . RP and DC 12-inch clearance below, with a platform above 5 feet .

Boilers: air gap or RP ; carbonators: RP . Test by a DOH BAT at installation and annually .

Air gaps 1, 1-1/2, 2 inches , or 2 × D (sidewalls: 1-1/2, 2-1/4, 3 inches, or 3 × D).

Drainage and cleanouts (Chapter 7, Washington)

Table 703.2: 16/8, 48/35, 256/216 . No water closets on 2 inches; 3-inch limits of 4 water closets vertical and 3 horizontal.

Slope 1/4 inch per foot ; 1/8 only for 4-inch and larger with AHJ approval (0.8 factor).

Cleanouts: at the upper end, every 100 feet , for turns over 135° . Washington clearance 12 or 18 inches , under-floor within 20 feet .

Ejectors: 20 gpm ; a 2-inch ball and 3-inch discharge (single dwelling: 1-1/2-inch ball, 2-inch discharge).

Indirect wastes, vents, and traps (Chapters 8–10)

Drainage air gap at least 1 inch . Food equipment indirect waste 1 inch minimum, 15 feet maximum . Clothes washer standpipe 18–30 inches , trap 6–18 inches above the floor.

Vents: individual at least 1-1/4 inches and at least half the drain; 6 inches above the flood rim before turning horizontal; terminal 6 inches above the roof, 10 feet from or 3 feet above openings.

Trap seal 2–4 inches ; trap arms 30/42/60/72/120 inches ; water closet 6 feet ; tailpiece 24 inches maximum.

Classic Distractors and Why They Are Wrong

  • Distractor Why it is wrong in Washington
  • "UPC Table 422.1 sets the number of fixtures" Not adopted; Building Code Table 2902.1 applies
  • "Shower minimum 1,024 square inches" Washington amends it to 900
  • "Cleanout clearance 18 or 24 inches" Washington amends it to 12 or 18
  • "Combustion air 50 cubic feet per 1,000 Btu/h" UPC 506 is not adopted; the Mechanical Code governs
  • "Gas pipe sizing by longest length" UPC Chapter 12 is not adopted

"Four-inch minimum building sewer in Washington" Building sewer sections are deleted; there is no such state UPC rule

  • "Hot water is 120°F or more" Washington defines hot water as 100°F or more
  • "Water test at 100 psi" The UPC uses working pressure , or 50 psi air
  • "Nail plate 16 gauge within 1-1/4 inches" The UPC requires 18 gauge within 1 inch
  • "Elevation loss is 0.433 psi per foot" (on Table 610.4 questions) 610.8 uses 1/2 psi per foot
  • "Lavatory 2 DFU in public use" Table 702.1 lists 1.0 for a lavatory in all columns
  • "Two flushometer water closets = 80 WSFU" Table 610.10 gives 70
  • Final Readiness Checklist
  • I can… Section
  • State the exam format, fees, retake rules, and the 90-day certificate deadline 1.1, 14.1
  • Recite Table 703.2 with notes, Table 1002.2, and the vent area list from memory 6.3, 9.2, 8.1
  • Size every drain and vent on a two-story commercial drawing, including aggregate venting 11.2, 11.3
  • Size meter, supply, and branches with Tables 610.3, 610.4, and 610.10 at any pressure 12.2–12.4
  • Name each Washington amendment and each non-adopted section 13.1
  • Pick the right backflow device for any application, with heights and testing 5.1–5.4
  • Apply cleanout, trap, and vent-termination rules to a drawing 7.1, 9.1, 11.4
  • Do offset, grade, area, volume, and head calculations 13.2