Study guide

2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1

Washington Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Administration, Licensing, & General Regulations

1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)

2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances

2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1

3 Chapter 3: Water Heaters & Storage Tanks

3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)

4 Chapter 4: Water Supply and Distribution Systems

4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)

5 Chapter 5: Backflow Prevention & Cross-Connection Control

5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)

6 Chapter 6: Sanitary Drainage Systems & Sizing

6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules

7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors

7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)

8 Chapter 8: Vents and Venting Fundamentals

8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)

9 Chapter 9: Vent Terminations, Traps, & Priming

9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)

10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards

10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)

11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis

11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations

12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing

12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4

13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics

13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)

14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy

14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist

2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1

Key Takeaways Explain This Topic AI

Washington's WAC 51-56 amendment states that UPC Sections 422.1 through 422.5 and Table 422.1 are not adopted; minimum fixtures come from Building Code Chapter 29 and Table 2902.1.

Washington also does not adopt UPC 415.2, drinking fountain alternatives, and refers to Building Code Chapter 29 instead.

Under the IBC method, the occupant load is split half male and half female, and fractional fixture results are rounded up to the next whole number.

IBC Table 2902.1 requires business occupancies to provide water closets at 1 per 25 for the first 50 and 1 per 50 for the remainder, per sex.

IBC Table 2902.1 requires restaurants to provide 1 water closet per 75 per sex, 1 lavatory per 200, and 1 drinking fountain per 500.

Last updated: September 2026

The Washington Rule

In most UPC states, the minimum number of water closets, lavatories, and drinking fountains comes from UPC Table 422.1 . Washington is different. The state amends UPC 422.0 as follows:

422.0 Minimum Number of Required Fixtures. For minimum number of plumbing fixtures required, see Building Code chapter 29 and Table 2902.1. Sections 422.1 through 422.5 and Table 422.1 are not adopted.

The same amendment pattern applies to drinking fountains:

415.2 Drinking Fountain Alternatives. This section is not adopted. See Building Code chapter 29.

For the exam, the high-yield fact is where the numbers come from : the International Building Code (IBC) as adopted in Washington, not the UPC. A question that asks for "UPC Table 422.1" ratios in a Washington context is testing whether you know the table is not adopted. The UPC still governs how each required fixture is installed (Chapter 4), connected to drainage (Chapter 7), vented (Chapter 9), and supplied (Chapter 6).

Who Uses Fixture Counts

Designers and plan reviewers normally set fixture counts. Journey level plumbers still need to recognize a noncompliant layout, especially on tenant improvements, where a change of use can raise the required count. Fixture counts also feed directly into the drainage and water sizing you will do on Parts 2 and 3 of the exam. Every added water closet adds drainage fixture units and water supply fixture units.

The IBC Calculation Method

Occupancy and occupant load: Use the occupant load and occupancy classification from the building code, usually shown on the architectural plans.

Split by sex: Divide the total occupant load in half to get the male and female loads.

Apply the ratios: Apply each fixture ratio in Table 2902.1 to each half.

Round up: Round any fractional result up to the next whole number . In a mixed occupancy, sum the fractions for each occupancy first, then round up.

Table footnote a: Each ratio means one fixture for the stated number of persons or any fraction of it .

Selected Rows of IBC Table 2902.1

Occupancy Water closets Lavatories Drinking fountains Other

Business (offices, banks, similar uses) 1 per 25 for the first 50 and 1 per 50 for the remainder over 50 1 per 40 for the first 80 and 1 per 80 for the remainder over 80 1 per 100 1 service sink

Educational 1 per 50 1 per 50 1 per 100 1 service sink

Assembly: restaurants, banquet halls, food courts 1 per 75 male; 1 per 75 female 1 per 200 1 per 500 1 service sink

  • Mercantile (retail stores, markets) 1 per 500 1 per 750 1 per 1,000 1 service sink
  • Factory and industrial 1 per 100 1 per 100 1 per 400 1 service sink
  • Storage (low and moderate hazard) 1 per 100 1 per 100 1 per 1,000 1 service sink

Another table footnote says business and mercantile occupancies with an occupant load of 30 or fewer do not need a service sink.

Scope note: Always use the edition of the IBC adopted in Washington, along with any Washington amendments to Chapter 29. The rows above are the published IBC values used to illustrate the method.

Worked Example 1: Office Building (Business)

An office tenant space has an occupant load of 200 .

Split: 100 male, 100 female.

Water closets per sex: The first 50 at 1 per 25 gives 2. The remaining 50 at 1 per 50 gives 1. Total: 3 water closets per sex .

Lavatories per sex: The first 80 at 1 per 40 gives 2. The remaining 20 at 1 per 80 gives 0.25, which rounds up. Total: 3 lavatories per sex .

Drinking fountains: 200 ÷ 100 = 2 .

Service sink: 1 .

Worked Example 2: Restaurant

A restaurant has an occupant load of 300 .

Split: 150 male, 150 female.

Water closets per sex: 150 ÷ 75 = 2 .

Lavatories per sex: 150 ÷ 200 = 0.75, which rounds up to 1 .

Drinking fountains: 300 ÷ 500 = 0.6, which rounds up to 1 before any building-code exceptions are applied.

Service sink: 1 .

Related Washington Chapter 4 Amendments

These amendments often travel with fixture-count questions:

  • Section Washington rule
  • 402.5 Water closet and bidet front clearance 24 inches; 21 inches in dwelling and sleeping units (Section 2.1)

405.4 No fixture or fitting may be sold, installed, or approved in Washington unless it meets Chapter 4 standards

  • 407.2 Lavatory and kitchen faucets 2.5 gpm; public lavatories 0.5 gpm (2015 amendment)
  • 407.4 Self-closing metering faucets on lavatories in general-public restrooms
  • 408.6 Shower compartment 900 square inches plus a 30-inch circle (Section 2.2)

411.2 and 412.1 Water closets 1.6 gpf and urinals 1.0 gpf under the 2015 amendments; no continuous-flow fixtures

414.3 Domestic dishwashers discharge through an air gap fitting; commercial dishwashers through an air gap

418.3 Floor drains in toilet rooms with two or more water closets or a water closet plus a urinal, and in commercial laundry rooms (Section 2.3)

Exam trap: "Water bottle filling stations may replace up to 50% of drinking fountains" is the unamended UPC 415.2 text. Washington does not adopt 415.2. Drinking fountain alternatives come from Building Code Chapter 29.