Study guide
11.1 Part 2 Explained: Reading the Waste and Vent Drawing
Washington Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Administration, Licensing, & General Regulations
1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)
2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances
2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1
3 Chapter 3: Water Heaters & Storage Tanks
3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)
4 Chapter 4: Water Supply and Distribution Systems
4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)
5 Chapter 5: Backflow Prevention & Cross-Connection Control
5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)
6 Chapter 6: Sanitary Drainage Systems & Sizing
6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules
7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors
7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)
8 Chapter 8: Vents and Venting Fundamentals
8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)
9 Chapter 9: Vent Terminations, Traps, & Priming
9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)
10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards
10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)
11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis
11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations
12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing
12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4
13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics
13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)
14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy
14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist
11.1 Part 2 Explained: Reading the Waste and Vent Drawing
Key Takeaways Explain This Topic AI
Part 2 of the Washington journey level exam has 25 items in 90 minutes, requires 70 percent, and is closed book (PSI candidate bulletin).
L&I states Part 2 asks for fixture units and pipe sizes using minimum sizing allowed by the UPC while maintaining aggregate venting.
UPC Table 702.1 is provided with the exam, but Table 703.2 (drain and vent sizing) is not and must be memorized.
On the drawing, accumulate fixture units in the direction of flow, one lettered segment at a time, and record whether each segment is horizontal or vertical.
Trap arms are excluded from Table 703.2 loadings; they are sized from Table 702.1 minimum trap sizes and Table 702.2(1).
Last updated: September 2026
What L&I and PSI Say About Part 2
- Fact Source
- 25 items , 90 minutes , 70% to pass, closed book PSI Washington Plumbing Candidate Information Bulletin
- "A waste and vent sizing exercise taken from Chapter 7 of the UPC and amendments" L&I
"A drawing of a building … showing elevated views of plumbing fixtures along with the illustrated piping for the vents, waste, and cleanouts " L&I
"You will provide fixture units and pipe sizes . Use minimum sizing as allowed by the UPC along with maintaining aggregate venting " L&I
Tables provided: 702.1, 610.3, 610.4, 610.10 . Table 703.2 is not provided L&I
You will have Table 702.1 on screen, but you need Table 703.2, the Table 703.2 notes, the half-drain vent rule, Table 1002.2 trap arm limits, and the aggregate venting rule from memory. The exam is based on the 2015 UPC with Washington amendments .
The Drawing
The drawing is a riser or isometric-style view. The piping is drawn so that vertical pipes look vertical and horizontal runs are drawn at angles, letting you see every floor's fixtures and piping at once. Common conventions:
Solid lines are drainage (waste and soil). Dashed or lighter lines are vents. Always check the drawing's legend.
Fixtures are labeled with abbreviations: WC (water closet), LAV (lavatory), UR (urinal), FD (floor drain), MS or SS (mop or service sink), KS (kitchen sink), DW (dishwasher), CW (clothes washer), BT (bathtub), SH (shower), DF (drinking fountain).
Pipe segments are usually marked with letters or numbers at points where fixtures join. Questions ask for the fixture units carried by, or the minimum size of, a named segment.
Cleanouts (CO) appear at the ends of horizontal runs, at the stack base, and near the building drain's exit.
The drawing states whether fixtures are private, public, or assembly use. That choice changes the DFU values in Table 702.1.
A Reading Method That Prevents Mistakes
Read the title block and notes. Find the occupancy type (private or public), the flush volumes (1.6 gpf or more), any slope other than 1/4 inch per foot, and the building sewer or point of disposal.
Identify every fixture and write its Table 702.1 DFU value and minimum trap size next to it.
Trace the flow. Start at the most remote fixture on the top floor and follow the water downhill to the building drain. Waste always flows from trap to trap arm to branch to stack to building drain.
Label each segment as H (horizontal) or V (vertical). Table 703.2 has different limits for each.
Count water closets in each segment. Note 3 bars water closets from 2-inch pipe. Note 4 allows four water closets on a 3-inch vertical and three on a 3-inch horizontal.
Trace the vents separately. Find each fixture's vent, where vents join, and every terminal through the roof.
Example Drawing Used in Sections 11.2 and 11.3
The next two sections work one drawing all the way through. A two-story office building has an identical public restroom group on each floor, and the first floor also has a mop sink and a drinking fountain.
Each restroom group: 2 flushometer water closets (1.6 gpf), 2 lavatories, 1 integral-trap urinal (1.0 gpf), and 1 floor drain.
Second floor: the branch runs from LAV-1 (segment A) past LAV-2 (B), the urinal (C), the floor drain (D), WC-1 (E), and WC-2 (F), then into the stack.
Stack: vertical from the second floor down to the first-floor branch (segment G).
First floor: the same restroom group, plus a mop sink and a drinking fountain on a branch (H) that joins at the stack base. The combined load leaves in the horizontal building drain (J).
Vents: individual vents from each fixture join a branch vent on each floor. The branch vents tie into a vent stack that runs through the roof beside the stack vent.
Trap Arms Are Different
Table 703.2 note 1 says unit loadings exclude the trap arm . The trap arm, from the trap weir to the vent, is sized from Table 702.1 (minimum trap and trap arm size). Table 702.2(1) caps the DFU a trap arm can carry: 1 for 1-1/4 inch, 3 for 1-1/2 inch, 4 for 2 inch, 6 for 3 inch, and 8 for 4 inch. The trap arm's length is limited by Table 1002.2 (Section 9.2). On the drawing, the short run from a single fixture's trap to its vent is its trap arm, sized at the fixture's minimum trap size.
Time Management
Twenty-five items in 90 minutes gives you about 3.5 minutes per item . Spend the first 10 to 15 minutes building a DFU and size ledger : one line per segment, recording the running DFU total, H or V, the number of water closets, and the minimum size. Most questions then become lookups from your own ledger instead of new calculations. Section 14.1 covers pacing across all three parts.