Study guide

6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules

Washington Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Administration, Licensing, & General Regulations

1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)

2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances

2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1

3 Chapter 3: Water Heaters & Storage Tanks

3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)

4 Chapter 4: Water Supply and Distribution Systems

4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)

5 Chapter 5: Backflow Prevention & Cross-Connection Control

5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)

6 Chapter 6: Sanitary Drainage Systems & Sizing

6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules

7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors

7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)

8 Chapter 8: Vents and Venting Fundamentals

8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)

9 Chapter 9: Vent Terminations, Traps, & Priming

9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)

10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards

10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)

11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis

11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations

12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing

12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4

13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics

13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)

14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy

14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist

6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules

Key Takeaways Explain This Topic AI

The UPC defines the building drain as the lowest drainage piping inside the building walls, ending at the building sewer 2 feet outside the building wall.

Horizontal drainage piping slopes at least 1/4 inch per foot (2 percent); piping 4 inches and larger may slope 1/8 inch per foot (1 percent) where approved by the AHJ (UPC 708.1).

Fixtures on a floor lower than the next upstream manhole cover must be protected by a backwater valve, and upper-floor fixtures may not discharge through it (UPC 710.1).

Cleanouts on drains that pass through a backwater valve must be labeled "backwater valve downstream" (UPC 710.1).

Washington deletes UPC Chapter 7 Part II, Sections 713 through 723 and Tables 717.1 and 721.1, so there is no state UPC building sewer size or depth rule.

Last updated: September 2026

Where the Building Drain Ends

The UPC Chapter 2 definitions draw the boundaries:

Building drain: "That part of the lowest piping of a drainage system that receives the discharge from soil, waste, and other drainage pipes inside the walls of the building and conveys it to the building sewer beginning 2 feet outside the building wall ."

Building sewer: The horizontal piping that extends from the end of the building drain to a public sewer, private sewer, private sewage disposal system, or other point of disposal.

Horizontal branch: A drain extending laterally from a stack or building drain that receives the discharge of one or more fixture drains.

Stack: The vertical main of soil, waste, or vent piping extending through one or more stories.

Washington Deletes the Building Sewer Rules

Washington's WAC 51-56-003 adopts the UPC "provided further, that those requirements of the Uniform Plumbing Code relating to … building sewers are not adopted ." The Chapter 7 amendment makes it explicit:

Chapter 7, Part II Building Sewers. Delete all of Part II ( Sections 713 through 723, and Tables 717.1 and 721.1 ).

What that means for the exam:

There is no UPC building sewer sizing table (Table 717.1) and no UPC sewer depth, cleanout-spacing, or testing rule (721, 723) in Washington's plumbing code. Local sewer utilities, health jurisdictions, and public works standards set those requirements.

Washington's definition of plumbing system (218.0) covers drainage piping and building drains within the property lines . It adds that no certification is required to install plumbing systems within the property lines and outside a building .

Statements such as "the UPC requires a 4-inch minimum building sewer in Washington" are not supported by the Washington code. Size the building drain with Table 703.2 (Section 6.3).

Grade of Horizontal Drainage (UPC 708.1)

  • Pipe Minimum slope Condition
  • Any horizontal drainage pipe 1/4 inch per foot (2%) toward the point of disposal Standard

4 inches and larger 1/8 inch per foot (1%) Only where the street sewer depth, structural features, or building arrangement make 1/4 inch impractical, and the AHJ approves first

At 1/8 inch per foot, horizontal fixture unit capacity drops by the 0.8 factor in Table 703.2 note 5. Piping must also be run "in practical alignment." Fittings are made for a 1/4-inch grade (701.3), and hangers must prevent sagging (313.4).

Grade math: 60 feet of drain at 1/4 inch per foot falls 15 inches (60 × 0.25). At 1/8 inch per foot it falls 7.5 inches. Slope percentage = rise ÷ run × 100. For example, 1/4 inch per 12 inches is about 2.08%.

Gravity Drainage and Fixtures Below the Sewer

709.1: Where practicable, fixtures drain to the public sewer or private system by gravity .

710.1 Backwater valves: Fixtures on a floor level lower than the next upstream manhole cover of the public or private sewer must be protected by an approved backwater valve .

Fixtures on that floor that are not below the manhole cover do not need one.

Fixtures on floors above that elevation may not discharge through the backwater valve.

Cleanouts on drains that pass through a backwater valve must carry a permanent label: "backwater valve downstream."

710.2 Below the sewer crown: Fixtures below the crown of the main sewer drain by gravity to a watertight sump or receiving tank , then are lifted into the building drain or sewer (Section 7.2).

710.6 Access: Backwater valves, gate and ball valves, unions, motors, and similar devices must be accessible. Unless continuously exposed, they go in a pit with an adequately sized removable cover.

Why a backwater valve matters

If the public sewer surcharges during a storm, sewage rises in the main and backs into the building drain. Any fixture below the next upstream manhole cover would overflow first. The backwater valve closes against reverse flow. Upper-floor fixtures are kept off it so their discharge does not back up behind a closed valve into the lower level.

Existing Building Drains (UPC 102.4.1)

Existing building drains and sewers may serve new work only if examination and testing show they meet the requirements for new work. Otherwise the AHJ orders the needed changes. Openings into a drainage or vent system not connected to fixtures or vent terminals must be permanently plugged or capped (102.4.2).

Testing the Building Drain

The building drain is tested with the rest of the DWV system under 712: a 10-foot water head or 5 psi air for 15 minutes, and no air test on plastic (Section 1.2). A two-way cleanout inside or just outside the wall at the building drain's lower end may substitute for an upper-terminal cleanout (707.4, exception 4; Section 7.1).