9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906)
Washington Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Administration, Licensing, & General Regulations
1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)
2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances
2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1
3 Chapter 3: Water Heaters & Storage Tanks
3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)
4 Chapter 4: Water Supply and Distribution Systems
4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)
5 Chapter 5: Backflow Prevention & Cross-Connection Control
5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)
6 Chapter 6: Sanitary Drainage Systems & Sizing
6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules
7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors
7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)
8 Chapter 8: Vents and Venting Fundamentals
8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)
9 Chapter 9: Vent Terminations, Traps, & Priming
9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)
10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards
10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)
11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis
11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations
12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing
12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4
13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics
13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)
14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy
14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist
9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906)
Key Takeaways Explain This Topic AI
Each vent terminates vertically at least 6 inches above the roof and at least 1 foot from any vertical surface (UPC 906.1).
A vent must terminate at least 10 feet from, or at least 3 feet above, any openable window, door, opening, air intake, or vent shaft (UPC 906.2).
A vent must terminate at least 3 feet in every direction from a lot line, alleys and streets excepted (UPC 906.2).
Vents within 10 feet of a roof area used for assembly or parking must extend at least 7 feet above that roof and be securely stayed (UPC 906.3).
Where frost closure is likely at design temperatures below 0°F, vent terminals are at least 2 inches, enlarged at least 1 foot below the roof, and extended at least 10 inches above the roof (UPC 906.7).
Last updated: September 2026
Why Termination Rules Matter
The vent terminal is where sewer gas leaves the building. Its location keeps that gas away from people and air intakes, and its size keeps it from freezing shut. A vent that closes with frost or snow cannot protect trap seals. Every vent through the roof must also extend undiminished in size (905.4) and be flashed watertight (906.5 and 312.8).
Roof Terminations (UPC 906.1 and 906.3)
906.1: Each vent pipe or stack extends through its flashing and terminates vertically at least 6 inches above the roof and at least 1 foot from a vertical surface .
906.3: Vents, whether separate or combined, extend full required size at least 6 inches above the roof or fire wall .
Flagpoling (a vent pipe standing high above the roof) is prohibited , except where the roof is used for assembly purposes or parking .
On such used roofs, vents within 10 feet of the used area extend at least 7 feet above the roof and are securely stayed .
Clearance to Openings and Lot Lines (UPC 906.2)
Condition Required clearance
Openable window, door, opening, air intake, or vent shaft At least 10 feet horizontally away, or at least 3 feet above it
Lot line At least 3 feet in every direction ; alleys and streets excepted
How to apply 906.2: Measure horizontally from the terminal to the opening. If that distance is less than 10 feet, the terminal must be at least 3 feet higher than the top of the opening.
Example: A vent terminal is 6 feet horizontally from a dormer window whose top is 2 feet above the roof surface at the vent. Because 6 feet is less than 10 feet, the vent must terminate at least 3 feet above the window top , which is 5 feet above the roof at that point. The 6-inch roof minimum is not enough here.
Outdoor Installations (UPC 906.4)
Vent pipes for outdoor installations extend at least 10 feet above the surrounding ground and are securely supported .
Flashing and Waterproofing
906.5: Joints at the roof around vent pipes are made watertight with approved flashings or flashing material.
312.8: Roof joints around pipes use lead, copper, galvanized iron, or other approved flashings. Counterflashing may not restrict the vent's required internal cross-sectional area.
906.6: Sheet lead used for flashings or vent terminals is at least 3 pounds per square foot . Safe pans use at least 4 pounds per square foot .
Frost or Snow Closure (UPC 906.7)
Where frost or snow closure is likely in locations with a minimum design temperature below 0°F :
Vent terminals are at least 2 inches in diameter, and never smaller than the required vent pipe .
The change in diameter (the increaser) is made inside the building , at least 1 foot below the roof , in an insulated space .
The terminal extends at least 10 inches above the roof , or as the AHJ requires.
The larger terminal holds warm, moist air longer and resists building up enough frost to close. Putting the increaser inside the insulated space keeps the transition warm. Whether a Washington location's design temperature falls below 0°F is a local design condition, and the AHJ may set how the rule is applied.
Other Vent Terminal Rules
1008.1: A building trap's relieving vent or fresh-air intake terminates above grade in a screened outlet outside the building . It need not be larger than half the diameter of the drain it connects to.
710.10: A sump vent may extend separately through the roof or combine with other vents. An air-operated ejector's vent may not combine with other vents.
803.3: A vent from indirect waste piping may not combine with a sewer-connected vent. It extends separately outdoors.
1017.1: Oil interceptor vapor vents are at least 2 inches and are independent of the sanitary vents.
Termination Checklist for Part 1 Questions
At least 6 inches above the roof, and 1 foot from any vertical surface?
At least 10 feet from openings, or at least 3 feet above them?
At least 3 feet from lot lines (streets and alleys excepted)?
Used roof (assembly or parking) within 10 feet? Then 7 feet high and stayed.
Cold location below 0°F design? Then a 2-inch minimum terminal, enlarged 1 foot below the roof inside insulation, extending 10 inches up.
Full size through the roof, and flashed watertight?