Study guide

3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5)

Washington Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Administration, Licensing, & General Regulations

1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)

2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances

2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1

3 Chapter 3: Water Heaters & Storage Tanks

3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)

4 Chapter 4: Water Supply and Distribution Systems

4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)

5 Chapter 5: Backflow Prevention & Cross-Connection Control

5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)

6 Chapter 6: Sanitary Drainage Systems & Sizing

6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules

7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors

7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)

8 Chapter 8: Vents and Venting Fundamentals

8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)

9 Chapter 9: Vent Terminations, Traps, & Priming

9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)

10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards

10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)

11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis

11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations

12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing

12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4

13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics

13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)

14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy

14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist

3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5)

Key Takeaways Explain This Topic AI

A system with storage water heating needs a listed combination T&P relief valve; listed nonstorage instantaneous heaters with an inside diameter of 3 inches or less are exempt (WA 608.3.1).

Pressure relief valves are set at not more than 150 psi, with no shutoff valve between the relief valve and the system (UPC 608.4).

The relief device's Btu/h or steam relief rating must be at least the water heater's input rating (UPC 504.6).

Washington's 608.5 requires T&P discharge piping equal to the valve outlet size, with no valves, and terminating 6 to 24 inches above the ground pointing down.

Relief valve discharge into a water heater pan is prohibited, and the terminal end of the discharge pipe may not be threaded (WA 608.5).

Last updated: September 2026

What the T&P Valve Protects Against

A storage water heater is a closed pressure vessel. If the thermostat and high-limit control both fail, water keeps heating past 212°F without boiling, because it is under pressure. At 50 psi, water stays liquid to about 298°F. At 150 psi it stays liquid to about 366°F. If the tank then ruptures, the superheated water flashes to steam and expands about 1,600 times in volume. A properly sized, properly piped T&P relief valve prevents that event by discharging water before the tank reaches those conditions.

When a T&P Valve Is Required

Section Rule

608.3.1 (Washington amendment) A water system containing storage water heating equipment needs an approved, listed, adequately sized combination temperature and pressure relief valve . Exception: a listed nonstorage instantaneous heater with an inside diameter not more than 3 inches .

608.3.1 location The valve goes on the heater in the location its listing and the manufacturer's instructions require, and it gets a drain per 608.5.

505.2 (Washington) Non-gas storage heaters need an over-temperature safety device and a combination T&P valve

608.6 A water-heating device connected to a separate storage tank, with valves between heater and tank, needs its own pressure relief valve

608.7 A hot water storage tank or indirect water heater located above the fixture outlets it serves needs a vacuum relief valve (CSA Z21.22)

Ratings and Settings

Pressure (608.4): Each pressure relief valve is an approved automatic type with a drain, set at not more than 150 psi . No shutoff valve may be installed between the relief valve and the system.

Capacity (504.6): The relief valve's hourly Btu discharge capacity or rated steam relief capacity must be not less than the input rating of the heater. A 199,000 Btu/h commercial heater needs a valve rated for at least 199,000 Btu/h.

Temperature: Standard residential T&P valves (ANSI Z21.22/CSA 4.4) open on temperature at about 210°F . The temperature-sensing element must sit in the hottest water near the top of the tank, in the heater's designated tapping. Never extend the valve out on a nipple or tee that holds the probe away from the tank water.

No shutoffs anywhere in the relief path (504.6): Do not install a valve between the relief valve and the heater, or on the discharge pipe between the valve and atmosphere.

Discharge Piping: Washington 608.5

Washington's amended 608.5 reads as a checklist. The discharge piping serving a temperature relief valve, pressure relief valve, or combination valve must have no valves, obstructions, or means of isolation , and must be:

Full size: equal to the size of the valve outlet, discharging full size to the flood level of the receiving area, pointing down.

Rated material: rated for at least the operating temperature of the system and approved for the use.

Gravity discharge: discharging independently by gravity through an air gap into the drainage system, or outside the building with the end of the pipe not more than 2 feet and not less than 6 inches above the ground , pointing downward.

Safe: discharging so as not to cause personal injury or structural damage.

Not trapped: no part may be trapped or subject to freezing.

Unthreaded: the terminal end may not be threaded, so the outlet cannot be capped.

Not into the pan: discharge from a relief valve into a water heater pan is prohibited .

Washington exception: Where no drainage was provided, replacement water heating equipment only needs a drain pointing down from the relief valve and ending between 2 feet and 6 inches from the floor . No additional floor drain is required.

  • Discharge detail Compliant Violation
  • Size 3/4-inch pipe from a 3/4-inch outlet Reducing to 1/2-inch tubing
  • Path Continuous fall by gravity Uphill run, sag, or trap
  • End Plain, unthreaded, 6 to 24 inches above grade or floor, pointing down Threaded end, hose adapter, or cap
  • Isolation None Ball valve, check valve, or tee with a plug
  • Termination Through an air gap to an approved receptor, or outdoors Into the water heater drain pan

Why 6 to 24 inches? Below 6 inches the outlet can be blocked by snow, water, or debris. Above 24 inches the discharge splashes and can scald someone standing nearby.

Related Pan Rule

A drain pan under a heater in an attic or over a floor-ceiling assembly (Section 3.3) catches leaks from the tank. It is not a receptor for relief valve discharge. A T&P line that ends over the pan violates item 7, even if the pan has a drain.

Exam trap: "Relief valves may be tested by installing a ball valve in the discharge so the line can be isolated." Any valve or means of isolation in the discharge piping is prohibited.