4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)
Washington Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Administration, Licensing, & General Regulations
1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)
2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances
2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1
3 Chapter 3: Water Heaters & Storage Tanks
3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)
4 Chapter 4: Water Supply and Distribution Systems
4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)
5 Chapter 5: Backflow Prevention & Cross-Connection Control
5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)
6 Chapter 6: Sanitary Drainage Systems & Sizing
6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules
7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors
7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)
8 Chapter 8: Vents and Venting Fundamentals
8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)
9 Chapter 9: Vent Terminations, Traps, & Priming
9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)
10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards
10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)
11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis
11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations
12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing
12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4
13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics
13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)
14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy
14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist
4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)
Key Takeaways Explain This Topic AI
A fullway valve is required on the discharge side of each water meter and each unmetered supply, with a separate fullway valve to each building on a premises (UPC 606.2).
In multi-dwelling buildings, each dwelling unit needs accessible shutoff valves so its fixtures can be isolated without shutting off other units (UPC 606.3).
A control valve is required immediately ahead of each water-supplied appliance and each slip joint or appliance supply (UPC 606.5).
Parallel (manifold) systems need a valve at each fixture or an identified valve at the manifold; manifolds in inaccessible spaces need a shutoff ahead of each fixture (WA 606.5).
Washington's WAC 51-56 amendment defines hot water as water at 100°F or more; the unamended 2015 UPC uses 120°F.
Last updated: September 2026
Valves Required by UPC 606
Section Requirement
606.1 Materials Valves up to 2 inches: copper alloy or other approved material. Over 2 inches: cast-iron or copper-alloy bodies permitted. Gate and ball valves must be fullway , with non-corrosive working parts, and drinking-water valves meet NSF 61
606.2 Fullway valve On the discharge side of each water meter and on each unmetered supply . Where one premises has several buildings, each building gets its own fullway valve. Exception: a single-family residence and its accessory buildings may share one valve
606.3 Multidwelling units One or more shutoff valves in each dwelling unit , so a fixture or group can be shut off without affecting other units; valves accessible within the unit they control
606.4 Multiple openings Valves controlling two or more openings are fullway gate valves, ball valves, or other approved valves
606.5 Control valve Immediately ahead of each water-supplied appliance and immediately ahead of each slip joint or appliance supply
606.6 Accessible Required shutoff and control valves must be accessible
606.7 Battery of fixtures A single control valve ahead of an automatic metering valve that serves a battery of fixtures
Parallel (manifold) distribution systems
Washington's amendment to 606.5 adds:
A parallel water distribution system (a manifold with individual lines to each fixture) must have a control valve either immediately ahead of each fixture or at the manifold , and each manifold valve must be identified with the fixture it supplies.
Where the manifold is in an attic, crawl space, or other location that is not accessible , a separate shutoff valve is required immediately ahead of each fixture or appliance .
Washington's 610.4 amendment adds that listed parallel systems are installed per their listing . The UPC also requires that velocity limits never be exceeded.
Unions and Connectors Near Equipment
609.5: Unions go in the water supply piping within 12 inches of regulating equipment, water heaters, conditioning tanks, and similar equipment that must be removed for service.
604.5: Flexible water connectors must be readily accessible .
603.4.5: Backflow preventers on hot water over 110°F must be designed to operate at that temperature.
Hot Water: Definitions and Temperature Limits
Washington 210.0: "Hot water" is water at a temperature exceeding or equal to 100°F . The unamended 2015 UPC definition is 120°F , so this is a Washington difference worth memorizing.
Point-of-use limits (Section 2.2): showers and tub-showers use ASSE 1016 valves with stops at 120°F , tub fillers and public lavatories use ASSE 1070 devices at 120°F , and bidets are limited to 110°F . The water heater thermostat never counts as the control.
417.5: With two handles, hot is on the left .
Hot Water Pipe Insulation
Washington 609.11: "Domestic water piping within commercial buildings shall be insulated in accordance with Section C403.2.8 and Table C403.2.8 or Section C404.6 of the Washington State Energy Code , as applicable." In Washington, commercial hot water pipe insulation thickness comes from the energy code, not the UPC.
Washington 312.6: All hot and cold water pipes installed outside the conditioned space must be insulated. The 2015-edition amendment specified a minimum of R-3 (Section 1.3).
For reference, the unamended UPC 609.11.2 ties insulation wall thickness to pipe diameter: at least the pipe's diameter for pipe up to 2 inches, and 2 inches for larger pipe. Washington replaces 609.11 with the energy code reference.
Hot Water Recirculation
Long runs from a water heater waste water and energy while users wait for hot water. Designers answer with a recirculation loop (supply main, return line, and pump) or with heat trace . The 2015 UPC places recirculation rules, including pump controls and maximum hot water volume, in Appendix L, Sustainable Practices . Washington adopts only Appendices A, B, and I of the UPC. In Washington, recirculation controls and hot water system efficiency are therefore energy code requirements, not UPC exam content.
Good practice on any loop:
Check valve on the return near the heater, so cold water cannot enter the return and cross over into the hot supply when fixtures open.
Balancing valves on each return branch in multi-riser systems, so the nearest loop does not short-circuit the flow.
Pump controls (timer, aquastat, or demand activation) as the energy code requires, rather than 24-hour operation.
Insulate supply and return piping as the energy code requires.
Isolation valves and unions at the pump for service (606.6, 609.5).
Worked Scenario: A Four-Unit Apartment Building
A four-unit building on one lot is served by one meter.
606.2: Put a fullway valve on the discharge side of the meter . Because the four units are in one building, one building valve serves the building. A second building on the same premises would need its own fullway valve.
606.3: Each unit needs accessible shutoff valves inside that unit , so one apartment can be isolated for repairs.
606.5: Put control valves (angle stops) ahead of each lavatory, water closet, sink, dishwasher, clothes washer, and water heater. Every slip-joint fixture supply needs one.
Manifold option: If each unit uses a PEX manifold in an accessible closet with valves labeled by fixture, the stops may be at the manifold. If the manifold is in the attic, a separate shutoff is required at each fixture .