Study guide
4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10)
Washington Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Administration, Licensing, & General Regulations
1.1 Washington Plumber Certification Law: RCW 18.106, WAC 296-400A, Trainees, & Supervision 1.2 Permits, Inspections, Tests, & Disinfection (UPC Chapter 1, 609, 712) 1.3 General Regulations: Prohibited Fittings, Pipe Protection, Nail Plates, Sleeves, & Trenching (UPC Chapter 3) 1.4 Hangers, Supports, Rod Sizes, Dissimilar Metals, & Expansion (UPC 313, Table 313.3)
2 Chapter 2: Plumbing Fixtures, Fittings, & Clearances
2.1 Fixture Setting, Clearances, Closet Flanges, & Water Closets (UPC 402, 411, 413; WA 402.5) 2.2 Showers, Shower Pans, Bathtubs, Lavatories, Bidets, & Scald Limits (UPC 407–410; WA 408) 2.3 Urinals, Floor Drains, Floor Sinks, Sinks, Dishwashers, Disposers, & Special Fixtures (UPC 412–421) 2.4 Minimum Fixture Counts in Washington: IBC Table 2902.1, Not UPC Table 422.1
3 Chapter 3: Water Heaters & Storage Tanks
3.1 Water Heater Permits, Sizing (WA Table 501.1), Bedroom and Bathroom Locations, & Safety Devices 3.2 Temperature and Pressure Relief Valves & Discharge Piping (UPC 504.6, 608; WA 608.3.1 and 608.5) 3.3 Water Heater Installation Details: Garages, Pans, Supports, Attic and Under-Floor Access, & Washington's Mechanical Code Deletions 3.4 Seismic Strapping, Thermal Expansion Tanks, Pressure Regulators, & Temperature Controls (WA 507.2, 608.2, 608.3)
4 Chapter 4: Water Supply and Distribution Systems
4.1 Water Piping Materials, Joints, Lead Limits, Under-Slab Rules, & Velocity (UPC 604, 605, 609, 610.12) 4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10) 4.3 Water Pressure Limits, Booster Pumps, Potable Water Tanks, & Water Hammer (UPC 607–609) 4.4 Water Valves, Shutoffs, Manifolds, & Hot Water Distribution (UPC 606, 609.11; WA 210.0 and 609.11)
5 Chapter 5: Backflow Prevention & Cross-Connection Control
5.1 Backflow Principles: Backsiphonage, Backpressure, & Degree of Hazard (UPC 602–603; WAC 246-290-490) 5.2 Backflow Assemblies and Devices: RP, DC, PVB, SVB, AVB, & Installation Rules (UPC 603.3, 603.4, Table 603.2) 5.3 Air Gaps, Critical Level, & Specific Backflow Applications (UPC Table 603.3.1, 603.5) 5.4 Backflow Testing, Certified Testers, & Washington's Cross-Connection Program (WA 603.4.2; WAC 246-290-490, 246-292)
6 Chapter 6: Sanitary Drainage Systems & Sizing
6.1 DWV Materials, Joints, & Changes in Direction (UPC 701, 704–706; WA 701.2) 6.2 Drainage Fixture Units, Trap Sizes, & Flow Conversions (UPC Table 702.1, 702.2, 702.3) 6.3 Sizing Drainage Piping with Table 703.2 (Vertical, Horizontal, Water Closet Limits, & WA Note 4) 6.4 Building Drains, Grade, Gravity Drainage, Backwater Valves, & Washington's Deletion of Building Sewer Rules
7 Chapter 7: Cleanouts, Sumps and Ejectors, Indirect Wastes, & Interceptors
7.1 Cleanouts: Location, Spacing, Size, and Clearance (UPC 707 as Amended by Washington) 7.2 Sumps, Sewage Ejectors, Grinder Pumps, & Macerating Systems (UPC 710) 7.3 Indirect Wastes, Air Gaps and Air Breaks, Receptors, Standpipes, & Condensate (UPC Chapter 8) 7.4 Interceptors and Separators: Grease, Sand, Oil, Laundry, & Bottling (UPC 1009–1017)
8 Chapter 8: Vents and Venting Fundamentals
8.1 Venting Fundamentals: Trap Seal Protection, Vent Sizing, the Half-Drain Rule, & Aggregate Venting (UPC 901–904) 8.2 Vent Grades and Connections, Vent Stacks, Relief and Yoke Vents, & Suds Relief (UPC 905, 907, 711) 8.3 Wet Venting and Circuit Venting (UPC 908, 911; WA 908.2.4 and 911.1) 8.4 Island Fixture Venting, Combination Waste and Vent Systems, & Engineered Vent Systems (UPC 909, 910, 912)
9 Chapter 9: Vent Terminations, Traps, & Priming
9.1 Vent Terminations: Roof Height, Clearances, Used Roofs, Outdoor Vents, & Frost Closure (UPC 906) 9.2 Traps, Trap Arms, Table 1002.2 Distances, & Prohibited Traps (UPC 1001–1004) 9.3 How Trap Seals Are Lost & How the Code Protects Them: Venting, Seal Depth, and Trap Seal Primers (UPC 901.3, 1005, 1007)
10 Chapter 10: Alternate Water, Rainwater Catchment, Definitions, & Referenced Standards
10.1 Alternate Water Sources: Reclaimed, Gray, and On-Site Treated Water (UPC Chapter 15 as Amended by Washington) 10.2 Nonpotable Rainwater Catchment Systems (UPC Chapter 16 as Amended by Washington) 10.3 Key UPC Definitions and Referenced Standards (UPC Chapters 2 and 17; WA Definition Amendments)
11 Chapter 11: Part 2 — Waste & Vent Isometric Drawings & Plan Analysis
11.1 Part 2 Explained: Reading the Waste and Vent Drawing 11.2 Part 2 Worked Example: Accumulating DFU and Sizing Every Drain Segment 11.3 Part 2 Worked Example: Sizing Individual, Branch, and Main Vents and Checking Aggregate Venting 11.4 Spotting Code Violations on Waste and Vent Drawings: A Checklist with Code Citations
12 Chapter 12: Part 3 — Water Supply Isometric Drawings & Pipe Sizing
12.1 Part 3 Explained: Reading the Water Sizing Drawing and Gathering the 610.7 Data 12.2 Part 3 Worked Example: Accumulating Water Supply Fixture Units, Cold and Hot 12.3 Part 3: Available Pressure, Elevation, Regulators, Device Losses, and the Length Column 12.4 Part 3 Worked Example: Sizing the Meter, Building Supply, and Every Branch with Table 610.4
13 Chapter 13: Washington Amendments Review, Plumbing Math, & Water Service Special Topics
13.1 Washington's Amendments to the 2015 UPC (WAC 51-56): A Consolidated Review 13.2 Plumbing Math for the Exam: Offsets, Rolling Offsets, Grade, Areas, Volumes, and Pressure 13.3 Water Service Details, Treatment Units, Softeners, & Residential Sprinklers (UPC 604, 609, 611, 612; WA Amendments)
14 Chapter 14: Comprehensive Exam Preparation & Test-Taking Strategy
14.1 The PSI Exam Day: Structure, Fees, Retakes, Rules, and Pacing 14.2 Using the Provided Tables Fast (702.1, 610.3, 610.4, 610.10) and Writing the Missing Ones from Memory 14.3 High-Yield Number Review, Classic Traps, and a Final Readiness Checklist
4.2 Water Supply Fixture Units & the Sizing Tables (UPC 610.3, 610.4, 610.8, 610.10)
Key Takeaways Explain This Topic AI
UPC Table 610.3 assigns 1.0 WSFU to a private lavatory, 2.5 to a 1.6 gpf tank water closet, 4.0 to a bathtub or clothes washer, and 2.0 to a shower head.
For separate hot and cold branch sizing, each side of a fixture with both connections may be taken as three-quarters of its Table 610.3 value (Table 610.3 note 3).
Table 610.10 assigns flushometer water closets 40, 70, 90, and 105 cumulative fixture units for 1 to 4 valves, then 115 plus 10 for each valve beyond 5.
UPC 610.8 adjusts available pressure by 1/2 psi per foot of elevation between the source and the highest outlet before choosing the Table 610.4 pressure range.
No building supply pipe may be smaller than 3/4 inch (UPC 610.8, Table 610.4 note 2).
Last updated: September 2026
Why Fixture Units, Not Gallons per Minute
Fixtures are used intermittently, so the peak demand of a building is far less than the sum of every fixture running at once. The UPC captures this probability through water supply fixture units (WSFU) . Section 610.3 says the Table 610.3 values include both hot and cold demand . Section 610.4 lets systems within the range of Table 610.4 be sized directly from that table. Larger or unusual systems use Appendix A (610.5). Washington's 610.4 amendment keeps this choice: "may be sized from that table or by the method set forth in Section 610.5."
Tables provided on the exam: PSI provides Tables 610.3, 610.4, and 610.10 with the journey level exam (along with 702.1). You need to know how to use them quickly and correctly.
Table 610.3: WSFU and Minimum Branch Sizes
- Fixture Min. branch Private Public Assembly
- Bathtub or combination bath/shower 1/2 in 4.0 4.0 —
- 3/4-inch bathtub fill valve 3/4 in 10.0 10.0 —
- Bidet 1/2 in 1.0 — —
- Clothes washer 1/2 in 4.0 4.0 —
- Dishwasher, domestic 1/2 in 1.5 1.5 —
- Drinking fountain or water cooler 1/2 in 0.5 0.5 0.75
- Hose bibb / each additional 1/2 in 2.5 / 1.0 2.5 / 1.0 —
- Lavatory 1/2 in 1.0 1.0 1.0
- Kitchen sink, domestic (with or without dishwasher) 1/2 in 1.5 1.5 —
- Laundry sink 1/2 in 1.5 1.5 —
- Service or mop basin 1/2 in 1.5 3.0 —
- Bar sink 1/2 in 1.0 2.0 —
- Clinical flushometer valve sink 1 in — 8.0 —
- Shower, per head 1/2 in 2.0 2.0 —
- Urinal, flush tank 1/2 in 2.0 2.0 3.0
- Urinal, flushometer valve 3/4 in See 610.10 See 610.10 See 610.10
- Water closet, 1.6 gpf gravity tank or flushometer tank 1/2 in 2.5 2.5 3.5
- Water closet, over 1.6 gpf gravity tank 1/2 in 3.0 5.5 7.0
- Water closet, flushometer valve 1 in See 610.10 See 610.10 See 610.10
Key notes to Table 610.3:
Note 1: The minimum branch size applies to the cold branch, or to both hot and cold branches.
Note 3: The listed values represent load on the cold water building supply. For fixtures with both hot and cold connections, the separate hot and cold values may each be taken as three-quarters of the listed total. A private lavatory (1.0) counts as 0.75 on the hot branch and 0.75 on the cold branch.
Note 5: Continuous-flow demands are added separately in gpm .
Note 8: The reduced value for additional hose bibbs applies when sizing the building demand or a segment serving more than one. The branch to each individual hose bibb is sized for 2.5 .
Table 610.10: Flushometer Valves
Flushometer valves draw a large, short burst, so they get their own decreasing, cumulative values (610.10). The number of valves served by each section of pipe sets that section's load:
- Valves Water closets (cumulative FU) Urinals (cumulative FU)
- 1 40 20
- 2 70 35
- 3 90 45
- 4 105 53
- 5 or more 115 , plus 10 per valve over 5 58 , plus 5 per valve over 5
Other fixtures in the same pipe section are added at their Table 610.3 values. The UPC's Example 610.10 counts 2 WC (70) + 2 UR (35) + 2 LAV (2) = 107 FU . Piping to a flushometer valve may never be smaller than the valve inlet.
Table 610.4 and the 610.8 Procedure
Section 610.7 lists the data you need: total fixture units, the developed length from the meter to the most remote outlet, the elevation difference to the highest outlet, and the minimum street pressure. Then 610.8 says:
Determine the available pressure at the meter or other source.
Add or subtract 1/2 psi for each foot of elevation between the source and the highest outlet.
Choose the Table 610.4 pressure range: 30–45 psi , 46–60 psi , or over 60 psi .
Choose the length column equal to or longer than the developed length: 40, 60, 80, 100, 150, 200, 250, 300, 400, 500, 600, 700, 800, 900, or 1,000 feet.
Follow down that column to the first value equal to or greater than the total fixture units.
Read the meter and street service size and the building supply and branch size from the two left-hand columns.
Also remember:
Minimum building supply: 3/4 inch (610.8 and Table 610.4 note 2).
Pressure losses through filters, softeners, backflow preventers, or tankless heaters must be included (610.2).
Where a pressure regulator is installed, size from 80% of the reduced pressure (608.2).
Branches (610.9) are sized by the fixture units they serve, using the same length and meter column. No branch needs to be larger than the building supply.
Worked Example: Office Restroom Core
A building has 4 flushometer water closets, 2 flushometer urinals, 4 public lavatories, and 1 public service sink . The minimum pressure at the meter is 68 psi . The highest outlet is 24 feet above the meter, and the developed length is 110 feet .
Fixture units: 4 WC = 105 ; 2 UR = 35 ; 4 lavatories × 1.0 = 4 ; service sink (public) = 3.0 . Total = 147 FU .
Pressure: 24 ft × 1/2 psi = 12 psi. 68 − 12 = 56 psi , so use the 46–60 psi range.
Length: 110 ft rounds up to the 150-foot column.
Table lookup: Going down the 150-ft column: 4, 14, 28, 30, 39, 52, 66, 85, 128, then 150 at the 2-inch meter / 1-1/2-inch building supply row. That is the first value of at least 147.
If the existing meter is only 1-1/2 inches: the 1-1/2 inch meter rows allow 66 (1-1/4 supply), 128 (1-1/2 supply), and 272 (2-inch supply) . The building supply must be 2 inches .
Worked Example: Two-Bath House
A house has 2 tank water closets (2.5 each), 2 lavatories (1.0 each), 1 tub/shower (4.0), 1 shower (2.0), a kitchen sink (1.5), a dishwasher (1.5), a clothes washer (4.0), and 2 hose bibbs (2.5 + 1.0). Total = 23.5 FU. The street pressure is 55 psi, the highest outlet is 15 feet up (−7.5 psi, leaving 47.5 psi, so 46–60 psi ), and the developed length is 95 feet, so use the 100-foot column. The column reads 5, 17, then 33 at 3/4-inch meter / 1-inch building supply . A 3/4-inch meter with a 1-inch supply is the answer.