9.2 Interior Hazardous Materials Management (X02), CCA and Lead Management (X03) & Site Remediation (X04)
WELL Accredited Professional WELL AP
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: WELL Certification Process, Project Typologies & Scoring
1.1 The WELL Building Standard & Project Typologies 1.2 The WELL Certification Journey & Documentation 1.3 Scoring Rules, Preconditions & Certification Levels 1.4 Performance Verification, On-Site Testing & Recertification 1.5 Precertification, Mid-Cycle Reviews & the WELL Ratings Family 1.6 WELL Portfolio & WELL at Scale: Scope, Documentation Scales & Score
2 Chapter 2: Air — Indoor Air Quality, Ventilation, Filtration & Contaminant Control
2.1 Air Quality Thresholds (A01) & Smoke-Free Environments (A02) 2.2 Ventilation Design (A03), Enhanced Ventilation Design (A06) & Air Quality Monitoring (A08) 2.3 Construction Pollution Management (A04), Pollution Infiltration (A09) & Air Filtration (A12) 2.4 Enhanced Air Quality (A05), Enhanced Supply Air (A13) & Microbe and Mold Control (A14) 2.5 Operable Windows (A07), Combustion Minimization (A10) & Source Separation (A11)
3 Chapter 3: Water — Quality Thresholds, Legionella Management, Moisture & Hygiene
3.1 Water Quality Indicators (W01) & Drinking Water Quality (W02) 3.2 Basic Water Management (W03): Ongoing Monitoring & Legionella Plans 3.3 Enhanced Water Quality (W04), Drinking Water Quality Management (W05) & Drinking Water Promotion (W06) 3.4 Moisture Management (W07) & Hygiene Support (W08)
4 Chapter 4: Nourishment — Availability, Transparency, Portioning & Sourcing
4.1 Fruits and Vegetables (N01) & Nutritional Transparency (N02) 4.2 Refined Ingredients (N03), Food Advertising (N04), Artificial Ingredients (N05) & Portion Sizes (N06) 4.3 Nutrition Education (N07), Mindful Eating (N08) & Food Preparation (N10) 4.4 Special Diets (N09), Responsible Food Sourcing (N11), Food Production (N12) & Local Food Environment (N13)
5 Chapter 5: Light — Light Exposure, Visual Acuity, Circadian Design & Daylight
5.1 Light Exposure (L01) & Visual Lighting Design (L02) 5.2 Circadian Lighting Design (L03): EML, M-EDI and the Enhanced Daylight Trade 5.3 Electric Light Glare Control (L04), Visual Balance (L07) & Electric Light Quality (L08) 5.4 Daylight Design Strategies (L05), Daylight Simulation (L06) & Occupant Lighting Control (L09)
6 Chapter 6: Movement — Active Design, Ergonomics, Site Selection & Activity Programs
6.1 Active Buildings and Communities (V01) & Circulation Network (V03) 6.2 Ergonomic Workstation Design (V02), Active Furnishings (V07) & Self-Monitoring (V10) 6.3 Physical Activity Opportunities (V06), Spaces and Equipment (V08) & Promotion (V09) 6.4 Facilities for Active Occupants (V04) & Site Planning and Selection (V05)
7 Chapter 7: Thermal Comfort — Performance, Zoning, Individual Control & Humidity
7.1 Thermal Performance (T01) & Verified Thermal Comfort (T02) 7.2 Thermal Zoning (T03), Radiant Thermal Comfort (T05) & Thermal Comfort Monitoring (T06) 7.3 Individual Thermal Control (T04) & Humidity Control (T07)
8 Chapter 8: Sound — Acoustic Zoning, Noise Limits, Isolation & Masking
8.1 Sound Mapping (S01) & Maximum Noise Levels (S02) 8.2 Sound Barriers (S03) & Minimum Background Sound (S06) 8.3 Reverberation Time (S04) & Sound Reducing Surfaces (S05)
9 Chapter 9: Materials — Restrictions, Hazard Management, VOCs, Transparency & Cleaning
9.1 Material Restrictions (X01) & Enhanced Material Restrictions (X05) 9.2 Interior Hazardous Materials Management (X02), CCA and Lead Management (X03) & Site Remediation (X04) 9.3 VOC Restrictions (X06), Materials Transparency (X07) & Materials Optimization (X08) 9.4 Waste Management (X09), Pest Management and Pesticide Use (X10) & Cleaning Products and Protocols (X11)
10 Chapter 10: Mind — Mental Health, Nature and Place, Restoration & Substance Use
10.1 Mental Health Promotion (M01), Services (M03) & Education (M04) 10.2 Nature and Place (M02) & Enhanced Access to Nature (M09) 10.3 Restorative Opportunities (M06), Restorative Spaces (M07) & Restorative Programming (M08) 10.4 Stress Management (M05), Tobacco Cessation (M10) & Substance Use Services (M11)
11 Chapter 11: Community — Health Promotion, Integrative Design, Emergency Preparedness & Equity
11.1 Health and Wellness Promotion (C01), Integrative Design (C02) & Enhanced Promotion (C07) 11.2 Emergency Preparedness (C03) & Emergency Resources (C14) 11.3 Occupant Survey (C04), Enhanced Occupant Survey (C05) & Diversity and Inclusion (C12) 11.4 Health Services and Benefits (C06), New Parent Support (C08), New Mother Support (C09), Family Support (C10), Civic Engagement (C11) & Accessibility (C13)
12 Chapter 12: Innovation, WELL Core Applicability & Exam Strategy
12.1 Innovation Features (I01–I05), Alternative Adherence Paths & Equivalencies 12.2 WELL Core Applicability, Multifamily Residential & Sector-Specific Space Types 12.3 WELL AP Exam Mastery: Format, Domain Weights, Embedded Content & Test-Day Strategy
9.2 Interior Hazardous Materials Management (X02), CCA and Lead Management (X03) & Site Remediation (X04)
Key Takeaways Explain This Topic AI
X02 Interior Hazardous Materials Management is a precondition covering three legacy hazards in existing buildings: asbestos, lead paint and polychlorinated biphenyls.
Under X02 Part 1, materials with over 1% asbestos are considered asbestos-containing materials, confirmed by polarized light microscopy or transmission electron microscopy; where confirmation is unavailable all presumed asbestos-containing materials are treated as ACM.
X02 Part 2 treats surface dust above 10 ug/ft2 on floors or 100 ug/ft2 on interior window sills as a lead hazard, along with paint above 0.5% lead by weight and bare soil above 400 ppm.
X03 CCA and Lead Management is a precondition addressing exterior CCA-treated wood plus lead in bare soil, artificial turf fibers, loose-fill rubber and playground paint.
X04 Site Remediation applies to sites with past or present industrial activities and accepts ASTM E1527-05 Phase I assessments, escalating to ASTM E1903-97 Phase II sampling and a sustainable remediation plan.
Last updated: September 2026
9.2 Interior Hazardous Materials Management (X02), CCA and Lead Management (X03) & Site Remediation (X04)
Core Exam Takeaway: X02 and X03 are both preconditions , and the split between them is interior versus exterior . X02 handles asbestos, lead paint and PCBs inside existing buildings ; X03 handles CCA-treated wood and lead in exterior soil, artificial turf, loose-fill rubber and playground paint . X04 Site Remediation (1 pt / Core 2 pt) is the optimization for contaminated sites . Memorize 1% asbestos , 400 ppm soil lead , and the three-year re-inspection cycle.
Feature X02: Interior Hazardous Materials Management — Precondition
Intent: manage risks of human exposure to hazardous materials ubiquitously used in past construction practices — specifically asbestos, lead and polychlorinated biphenyls (PCBs) .
WELL's framing is stark: exposure to asbestos-containing dust is the main cause of mesothelioma and is responsible for over 200,000 deaths annually ; lead accumulates in blood, tissue and bone and impairs intellectual development in children and the unborn ; PCBs are persistent, bioaccumulative and carcinogenic , and their production is banned worldwide .
The strategy: evaluate existing buildings for these materials, remove them when technically feasible, and if removal is not possible, isolate and periodically monitor to prevent exposure — while above all avoiding the generation of respirable dust .
X02 Part 1 — Manage Asbestos Hazards
Applies to existing buildings constructed or last renovated before laws banning asbestos-containing materials , and to buildings where no local asbestos phase-out regulation exists .
Option 1: Asbestos risk assessment — one of:
(a) A project where all asbestos was removed in a prior renovation demonstrates that occupancy of the space is legally allowed .
(b) An investigation by an inspector certified under local regulation — or a qualified professional with demonstrable experience where no local regulations apply — providing at minimum:
A list of locations where presumed asbestos containing materials (PACM) were found .
Confirmation of asbestos through Polarized Light Microscopy (PLM) or Transmission Electron Microscopy (TEM) testing, with sample number and location per applicable laws or the inspector's recommendation. Materials having over 1% asbestos are considered ACM. If analytical confirmation is not available or possible, all PACM are considered ACM.
Option 2: Asbestos action plan — if ACM were found, implement a plan containing: notification of works to authorities and people living, working or transiting nearby; preventative measures against formation and spread of airborne fibers ; worker protection including skin and respiratory protection; and for removal, wetting of all removed ACM, care in transportation to prevent crumbling, sealing and leak-tight transportation, proper labeling and disposal in permitted locations ; plus post-remediation clearance.
X02 Part 2 — Manage Lead Paint Hazards
Applies to existing buildings constructed or renovated before laws banning lead-containing interior wall paints .
Option 1: Identify lead paint hazards — one of:
(a) Where local law mandates full removal before occupancy , demonstrate the risk was addressed with legal documentation such as approved certificates of occupancy or remediation reports.
(b) An on-site investigation by a certified inspector or qualified professional , covering:
An inventory of locations of potential sources and sinks of lead-containing materials.
Confirmation through in-situ x-ray fluorescence (XRF) or laboratory analysis of paint chips and/or surface dusts. The hazard thresholds:
- Medium Lead hazard threshold
- Surface dust — floors more than 10 µg/ft² (0.11 mg/m²) of collection area
- Surface dust — interior window sills more than 100 µg/ft² (1.08 mg/m²)
- Paint over 0.5% lead by weight , or 930 µg/ft² (10,000 mg/m²) of applied area
- Bare soil over 400 ppm lead by weight
Lower thresholds mandated by local regulations prevail.
Option 2: Lead action plan — if lead is found, a certified inspector implements a plan containing: notification and access restriction ; dust-minimization and worker protection if paints are mechanically removed; a re-inspection schedule including visual assessments and dust testing at least once every three years where lead paint is left in place under stabilization (painted over to prevent chipping) or enclosure ; and post-remediation clearance confirming dust lead is below hazardous levels.
X02 Part 3 — Manage Polychlorinated Biphenyl (PCB) Hazards
Applies to buildings constructed or last renovated before applicable PCB bans , or undergoing renovation that disturbs materials likely to contain PCBs — WELL names caulking, fluorescent light ballasts, and capacitors of appliances fabricated before 1980 .
(a) An inspection strategy determining locations where PCB-containing materials may be disturbed, and, if caulk is to be disturbed or removed , analysis following local laws or applicable US EPA or ISO testing methods.
(b) If PCBs are found in disturbed materials, an action plan with notification, dust-spread prevention and access restriction , worker protection including chemical-resistant gloves, clothing protection, goggles and respirators , and safe disposal in permitted locations.
WELL Core guidance for all three parts: extent of developer buildout.
Important
Two asbestos numbers, two purposes. X01 Part 1 restricts newly installed products to 1,000 ppm (0.1%) asbestos. X02 Part 1 treats existing materials as ACM above 1% . The new-product threshold is ten times stricter than the legacy-material trigger, because the former is a purchasing decision and the latter is a remediation trigger.
Tip
"If analytical confirmation is not available or possible, all PACM are considered ACM" is the precautionary default that makes X02 workable. A project cannot avoid obligations by declining to test — untested presumed materials are treated as hazardous.
Feature X03: CCA and Lead Management — Precondition
Intent: mitigate risks of human exposure to chromated copper arsenate (CCA) and lead .
X03 Part 1 — Manage Exterior CCA Hazards
Applies to all existing wood structures installed before CCA bans that lie outside the building envelope but within the project boundary where human presence is expected — WELL's examples: wooden decks, fences near walkways, playgrounds and outdoor furniture .
(a) Identify CCA-containing wood through one of: inspection of purchase records ; determination of whether legal bans for CCA apply ; or testing for arsenic in the wood or in the soil bearing the wooden structures .
(b) Address CCA-containing woods through one of:
Dispose following applicable laws, without incinerating nor wood chipping ; or
Treatment with penetrating (non-film-forming), oil-based, semi-transparent stains that prevent arsenic leaching , applied regularly per manufacturer recommendation.
Important
"Without incinerating nor wood chipping" is the operative safety rule. Burning CCA wood volatilizes arsenic into smoke and concentrates it in ash; chipping creates arsenic-laden dust and mulch. And note the stain specification: penetrating, non-film-forming, oil-based, semi-transparent — a film-forming paint would peel and expose the wood again.
X03 Part 2 — Manage Lead Hazards
(a) Bare soil: the top 0.6 in (1.5 cm) layer of all existing outdoor bare soil (outside the building envelope, post-construction, not covered by grass, vegetation or other landscaping including mulch) is tested for lead , with each continuous area of bare soil sampled at least once . If any sample exceeds 400 ppm by weight :
A second set of samples is taken at 6 in (15 cm), 12 in (30 cm), 18 in (45 cm) and 24 in (60 cm) deep .
If those are also above 400 ppm, soil is replaced from another source to the depth of the deepest sample above the threshold .
(b) Artificial turf fibers: if lead concentration is unknown, test a sample . If total lead exceeds 136 mg/lb (300 mg/kg) , perform dust-wipe testing . If wipe results show total lead loadings greater than 40 µg/ft² (430 µg/m²) , replace with turf below 136 mg/lb (300 mg/kg) .
(c) Loose-fill rubber from recycled tires on playgrounds, sporting fields or other surfaces: sample and analyse ; if total lead loadings exceed 136 mg/lb (300 mg/kg) of rubber , replace the loose-fill rubber .
(d) Paint on existing playground equipment installed and painted before banning laws: assess integrity and age ; if cracked, peeled or chipped , collect a sample for laboratory lead analysis and remove as necessary.
WELL Core guidance: extent of developer buildout.
Tip
400 ppm is the lead-in-soil number that appears in both X02 Part 2 and X03 Part 2 — one number, two features, interior investigation and exterior testing respectively. And note the escalating depth protocol in X03: a surface exceedance triggers sampling at four defined depths, and replacement extends only as deep as contamination is actually found.
Feature X04: Site Remediation — Optimization (1 pt / WELL Core 2 pt)
Intent: promote the safer development of potentially contaminated sites by assessing and mitigating hazards.
X04 Part 1 — Assess and Mitigate Site Hazards
Option 1: Environmental site assessment. For sites used for past or present industrial activities — WELL's examples: hazardous waste storage, fuel station, manufacturing plant, on-site dry cleaners, automotive repair or brownfields — complete an assessment of potential contamination in soil or underground water from past uses or surrounding conditions, using either local applicable regulation for environmental site assessments or ASTM E1527-05 (Phase I site assessments) .
Option 2: Monitoring and remediation plan. If the investigation establishes potential presence of contaminants:
(a) A sampling strategy to quantify contamination and determine remediation needs, following local regulations or ASTM E1903-97 (Phase II site assessment) .
(b) A sustainable remediation plan before, during and after construction integrating:
- A risk-based approach to sustainable remediation (risk assessment / risk-benefit analysis)
- A tiered approach to assessment and an appraisal of remediation options
- Safe working practices for workers during remediation
- Record keeping of decision-making and assessment processes
- A protocol for engaging stakeholders , including management of the impacts on the community
WELL Core guidance: whole building.
Tip
Phase I versus Phase II is the distinction to hold. ASTM E1527-05 Phase I is a records and reconnaissance assessment — historical use, adjacent properties, regulatory databases, site walkover — with no sampling . ASTM E1903-97 Phase II is intrusive sampling to quantify what Phase I flagged. X04's two options mirror that sequence exactly, and requirement (b)(5)'s community impact management is the provision that distinguishes WELL's "sustainable remediation" framing from a purely technical clean-up.