Study guide
1.6 WELL Portfolio & WELL at Scale: Scope, Documentation Scales & Score
WELL Accredited Professional WELL AP
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: WELL Certification Process, Project Typologies & Scoring
1.1 The WELL Building Standard & Project Typologies 1.2 The WELL Certification Journey & Documentation 1.3 Scoring Rules, Preconditions & Certification Levels 1.4 Performance Verification, On-Site Testing & Recertification 1.5 Precertification, Mid-Cycle Reviews & the WELL Ratings Family 1.6 WELL Portfolio & WELL at Scale: Scope, Documentation Scales & Score
2 Chapter 2: Air — Indoor Air Quality, Ventilation, Filtration & Contaminant Control
2.1 Air Quality Thresholds (A01) & Smoke-Free Environments (A02) 2.2 Ventilation Design (A03), Enhanced Ventilation Design (A06) & Air Quality Monitoring (A08) 2.3 Construction Pollution Management (A04), Pollution Infiltration (A09) & Air Filtration (A12) 2.4 Enhanced Air Quality (A05), Enhanced Supply Air (A13) & Microbe and Mold Control (A14) 2.5 Operable Windows (A07), Combustion Minimization (A10) & Source Separation (A11)
3 Chapter 3: Water — Quality Thresholds, Legionella Management, Moisture & Hygiene
3.1 Water Quality Indicators (W01) & Drinking Water Quality (W02) 3.2 Basic Water Management (W03): Ongoing Monitoring & Legionella Plans 3.3 Enhanced Water Quality (W04), Drinking Water Quality Management (W05) & Drinking Water Promotion (W06) 3.4 Moisture Management (W07) & Hygiene Support (W08)
4 Chapter 4: Nourishment — Availability, Transparency, Portioning & Sourcing
4.1 Fruits and Vegetables (N01) & Nutritional Transparency (N02) 4.2 Refined Ingredients (N03), Food Advertising (N04), Artificial Ingredients (N05) & Portion Sizes (N06) 4.3 Nutrition Education (N07), Mindful Eating (N08) & Food Preparation (N10) 4.4 Special Diets (N09), Responsible Food Sourcing (N11), Food Production (N12) & Local Food Environment (N13)
5 Chapter 5: Light — Light Exposure, Visual Acuity, Circadian Design & Daylight
5.1 Light Exposure (L01) & Visual Lighting Design (L02) 5.2 Circadian Lighting Design (L03): EML, M-EDI and the Enhanced Daylight Trade 5.3 Electric Light Glare Control (L04), Visual Balance (L07) & Electric Light Quality (L08) 5.4 Daylight Design Strategies (L05), Daylight Simulation (L06) & Occupant Lighting Control (L09)
6 Chapter 6: Movement — Active Design, Ergonomics, Site Selection & Activity Programs
6.1 Active Buildings and Communities (V01) & Circulation Network (V03) 6.2 Ergonomic Workstation Design (V02), Active Furnishings (V07) & Self-Monitoring (V10) 6.3 Physical Activity Opportunities (V06), Spaces and Equipment (V08) & Promotion (V09) 6.4 Facilities for Active Occupants (V04) & Site Planning and Selection (V05)
7 Chapter 7: Thermal Comfort — Performance, Zoning, Individual Control & Humidity
7.1 Thermal Performance (T01) & Verified Thermal Comfort (T02) 7.2 Thermal Zoning (T03), Radiant Thermal Comfort (T05) & Thermal Comfort Monitoring (T06) 7.3 Individual Thermal Control (T04) & Humidity Control (T07)
8 Chapter 8: Sound — Acoustic Zoning, Noise Limits, Isolation & Masking
8.1 Sound Mapping (S01) & Maximum Noise Levels (S02) 8.2 Sound Barriers (S03) & Minimum Background Sound (S06) 8.3 Reverberation Time (S04) & Sound Reducing Surfaces (S05)
9 Chapter 9: Materials — Restrictions, Hazard Management, VOCs, Transparency & Cleaning
9.1 Material Restrictions (X01) & Enhanced Material Restrictions (X05) 9.2 Interior Hazardous Materials Management (X02), CCA and Lead Management (X03) & Site Remediation (X04) 9.3 VOC Restrictions (X06), Materials Transparency (X07) & Materials Optimization (X08) 9.4 Waste Management (X09), Pest Management and Pesticide Use (X10) & Cleaning Products and Protocols (X11)
10 Chapter 10: Mind — Mental Health, Nature and Place, Restoration & Substance Use
10.1 Mental Health Promotion (M01), Services (M03) & Education (M04) 10.2 Nature and Place (M02) & Enhanced Access to Nature (M09) 10.3 Restorative Opportunities (M06), Restorative Spaces (M07) & Restorative Programming (M08) 10.4 Stress Management (M05), Tobacco Cessation (M10) & Substance Use Services (M11)
11 Chapter 11: Community — Health Promotion, Integrative Design, Emergency Preparedness & Equity
11.1 Health and Wellness Promotion (C01), Integrative Design (C02) & Enhanced Promotion (C07) 11.2 Emergency Preparedness (C03) & Emergency Resources (C14) 11.3 Occupant Survey (C04), Enhanced Occupant Survey (C05) & Diversity and Inclusion (C12) 11.4 Health Services and Benefits (C06), New Parent Support (C08), New Mother Support (C09), Family Support (C10), Civic Engagement (C11) & Accessibility (C13)
12 Chapter 12: Innovation, WELL Core Applicability & Exam Strategy
12.1 Innovation Features (I01–I05), Alternative Adherence Paths & Equivalencies 12.2 WELL Core Applicability, Multifamily Residential & Sector-Specific Space Types 12.3 WELL AP Exam Mastery: Format, Domain Weights, Embedded Content & Test-Day Strategy
1.6 WELL Portfolio & WELL at Scale: Scope, Documentation Scales & Score
Key Takeaways Explain This Topic AI
A defined WELL Portfolio must contain at least 10 projects, unless the member's total global portfolio holds fewer than 10, in which case the minimum is two projects.
WELL Portfolio offers three documentation scales: Individual documents for one location, Shareable documents assigned across many locations, and Audited documents verified through a sampled subset.
The WELL Portfolio Score is an integer from 0 to 100 equal to the weighted average of points achieved across all projects, weighted by each project's actual or expected occupant count.
A project that has not met all preconditions contributes a maximum of 49 points toward the WELL Portfolio Score even if it earned more through optimizations.
Portfolio performance testing must recur at least every three years, and expired documents or test results cause the associated features to stop counting toward the score.
Last updated: September 2026
1.6 WELL Portfolio & WELL at Scale: Scope, Documentation Scales & Score
Quick Answer: WELL Portfolio applies WELL across many properties at once instead of one asset at a time. A defined portfolio needs at least 10 projects (or 2, if the member owns fewer than 10 in total), scoped by a category such as geography, typology or ownership and approved by the IWBI coaching contact . Documentation may be submitted at three scales — Individual, Shareable and Audited . Achievement rolls up into the WELL Portfolio Score : an integer from 0 to 100 equal to the occupant-weighted average of points achieved across all projects , with any project missing a precondition capped at 49 points .
The WELL AP exam specification names this program explicitly. Domain 11 is titled WELL Certification and WELL Portfolio , and its Portfolio Program sub-block asks for knowledge of "WELL Portfolio scope and eligibility requirements," "WELL Portfolio scales of documentation and review process within WELL Portfolio," and "factors that influence the WELL Portfolio Score." Those three items are exactly what this section covers.
Note
Naming. IWBI has since rebranded the portfolio-level offering as WELL at scale , and current IWBI materials use that name (a WELL at scale subscription earns unlimited certifications and ratings across subscribed locations, with an organization-level WELL Score ). The exam's reference list still names the WELL Portfolio Guidebook , so learn the mechanics under both labels and treat "WELL Portfolio Score" and "WELL Score" as the same concept at different program generations.
1. Subscription & Enrollment
The portfolio-level program is a subscription , not a single-cycle registration. For the first term, the minimum commitment is a five-year subscription .
Enrollment includes WELL coaching support to help define the portfolio scope and identify efficiencies for pursuing features across locations.
Deliverables include an overall WELL Portfolio Score for the defined portfolio, alongside any individual project certifications, precertifications and ratings earned by locations inside it.
Precertification Review fees are waived for projects enrolled in WELL Portfolio — a meaningful commercial difference from single-asset projects.
- 2. Defining the Portfolio Scope +---------------------------------------------------------------------------+
- | WHAT MAY DEFINE A PORTFOLIO |
- | |
- | • Geography (e.g., all European assets) |
- | • Typology / use type (e.g., all distribution centers) |
- | • Ownership / fund (e.g., all assets in a named investment fund) |
- | |
- | RULE: the administrator must enter ALL projects meeting the definition |
- | and may NOT unreasonably exclude properties to gain an unfair advantage. |
- +---------------------------------------------------------------------------+
- Size and membership rules
Minimum size: a defined portfolio must contain at least 10 projects — unless the member's total global portfolio contains fewer than 10, in which case the minimum project count is two .
Approval: the defined portfolio must be approved by the member's WELL coaching contact at IWBI , and the member must accurately communicate the scope in all public-facing materials, distinguishing it from other properties under the same owner.
New construction: properties that qualify may be added at any point during design or construction, but inclusion is only required at substantial completion of construction . A project that has not reached substantial completion may not submit or be assigned feature documentation unless it is pursuing Precertification in that review cycle.
Low occupancy carve-out: completed projects with occupancy rates below 25% may be excluded from the portfolio definition.
Acquisitions: qualifying properties acquired must be added within one year of acquisition . Divested properties must be removed by the next review cycle . Subscription fees are assessed annually on current portfolio size.
Groupings and sub-portfolios
Administrators may create groupings on any characteristic to track progress and assign documents. Groupings are internal — never publicly displayed, never given an official IWBI designation.
A sub-portfolio is different: a subset of at least five projects that itself satisfies a portfolio definition category is eligible for its own WELL Portfolio Score and placement on the associated leaderboard. A global 20-project portfolio containing 10 European assets can have the European sub-portfolio scored and ranked separately while the whole portfolio also appears on the overall leaderboard.
3. Roles and Responsibilities
Role Authority and duties
Portfolio administrator Oversees the whole WELL Portfolio process and coordinates documentation for the defined portfolio. Primary point of contact, copied on all correspondence, and recipient of the WELL report after each review. May be a WELL AP. Enters all qualifying projects during enrollment and schedules review cycles.
Project administrators / portfolio sub-administrators Delegated by the portfolio administrator to manage individual locations or subsets, including confirming Individual-scale documentation.
WELL coaching contact (IWBI) Approves the defined portfolio and provides guidance on achieving goals across the portfolio.
WELL Reviewer Third-party agent assigned by IWBI after the first review cycle is scheduled; reviews and approves all documentation and performance testing results.
4. The Three Scales of Documentation
This is the heart of what makes portfolio-scale WELL efficient, and it is the most examinable part of the program.
Scale What it is Who maintains it Verified by sampling?
Individual Traditional single-asset documentation — the verification methods described in each feature, applied to one location. The responsible member of that project team. No
Shareable One document applied across multiple locations in the defined portfolio. A corporate benefits policy or an owner Letter of Assurance is the classic case. Uploaded to the member's document library and assigned to all, some or no locations. The portfolio administrator or another authorized individual. No
Audited Used where the verification method is location-specific but can be validated by checking a sampled subset of locations. Photographs are the canonical example. Portfolio/project teams, validated at the audited locations. Yes
Rules that follow from the scales
Assigning a Shareable document is an attestation that it applies as written to each selected location.
Once a WELL Reviewer approves a Shareable document, it is approved for all locations to which it was assigned at the beginning of that review cycle . Locations that get the document assigned later receive credit at the portfolio's next review cycle .
Any change to a Shareable document during a review cycle requires reconfirmation by the locations relying on it.
Multiple documents may live in the library for the same feature, so different subsets of locations can satisfy one feature different ways.
Audited photographs must be date stamped and identify the location .
5. Review Cycles and Reverification
Portfolio subscription fees include up to two review cycles per year , scheduled by the portfolio administrator. Additional cycles may be scheduled for additional fees.
Projects in a portfolio are not required to pursue all features at once . A location may pursue documentation-based features in one cycle and performance-based features in a later cycle.
Each review cycle can include Intent-stage documents for Precertification, Implementation-stage documents that contribute to the Portfolio Score, and performance testing results.
Performance testing must recur at least every three years , and results must be resubmitted for any features previously awarded on that basis.
The WELL Digital Platform flags expired documents and test results. When something expires, the associated features stop being considered met — and because each project's points feed the score, expiry directly moves the WELL Portfolio Score. Teams renew or replace expired items in a future review cycle to regain the features.
- 6. Calculating the WELL Portfolio Score WELL Portfolio Score = weighted average of points achieved across all
- projects, weighted by each project's actual or
- expected OCCUPANT COUNT, rounded to the nearest
integer. Range: 0 - 100.
- Precondition gate: a project that has NOT met all preconditions
- contributes a maximum of 49 points, even if its
optimizations total more.
The factors that move the score — the exam's actual question
Points achieved per project. Every feature validated by a project adds to that project's point total.
Occupant weighting. Scores are weighted by the actual or expected number of occupants at each project, so a 2,000-person headquarters moves the score far more than a 20-person satellite office. Where occupancy is unknown, teams may use default occupancy assumptions such as those published by LEED or BREEAM , or other sources approved by IWBI.
The 49-point precondition cap. Preconditions award no points, but failing to meet them all caps a location's contribution at 49 — the single most important structural incentive in the program.
Portfolio composition. Adding acquisitions, removing divested assets and reaching substantial completion all change the denominator.
Document and test expiry. Features drop out when documentation or performance testing lapses.
Minimum basis: the WELL Portfolio Score must be based on at least two projects .
Update timing: the score is updated following acceptance of a WELL report from a review cycle — not continuously.
Important
A WELL Portfolio Score above 50 does not mean the portfolio is certified. The score is a portfolio-level metric; WELL Certification is still awarded to individual locations. Projects inside the portfolio that are not certified contribute zero points toward the score.
Tip
Worked example. A portfolio holds two locations. Location A houses 900 occupants and earned 60 optimization points with all preconditions met. Location B houses 100 occupants, earned 58 optimization points, but missed one precondition. Location A contributes 60; Location B is capped at 49. The occupant-weighted average is (60 × 900 + 49 × 100) ÷ 1,000 = 58.9, which rounds to a WELL Portfolio Score of 59 . Note how little the small site's precondition failure cost the portfolio — and how much it would have cost if the headcounts were reversed.