Study guide
6.3 Assembly Registration, DSPS Tags, Annual Testing & Tester Registration
Wisconsin Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Licensing, Exam Rules & Code Administration
1.1 Wisconsin Plumbing Credentials, Scope & Supervision (Ch. 145, SPS 305) 1.2 The Journeyman Exam: Format, Fees, Retakes & Permitted References 1.3 Plan Review, Plan Approval & Product Approvals (SPS 382.20) 1.4 Testing, Inspection, Maintenance & Repairs (SPS 382.21, 382.22) 1.5 Code Structure, Key Definitions, Basic Principles & Referenced Standards
2 Chapter 2: Sanitary Drainage Systems (SPS 382.30)
2.1 Drainage Fixture Units (DFU) & Load Values 2.2 Horizontal Branch Drains, Pitch & Changes in Direction 2.3 Drain Stacks, Branch Intervals & Stack Offsets 2.4 Building Drains, Building Sewers & Private Interceptor Main Sewers
3 Chapter 3: Venting Systems & Cold-Climate Vent Terminals (SPS 382.31)
3.1 Vent Stacks, Relief Vents & Vent Sizing Tables 3.2 Common Vents, Wet Vents & Circuit Vents 3.3 Return Vents, Combination Drain & Vent Systems & Air Admittance Valves 3.4 Vent Terminals, Frost Closure & Prohibited Vent Uses
4 Chapter 4: Traps, Indirect Waste & Wastewater Treatment Devices
4.1 Fixture Traps, Trap Seals & Direct Fixture Connections 4.2 Trap-to-Vent Distances (Table 382.31-1) 4.3 Indirect & Local Waste Piping, Air Gaps & Receptors 4.4 Interceptors, Catch Basins & Chemical Waste Treatment (SPS 382.34)
5 Chapter 5: Water Supply Systems (SPS 382.40)
5.1 Water Supply Fixture Units (WSFU) & Demand 5.2 Sizing Water Distribution Piping: Pressure, Friction & Velocity 5.3 Control Valves, Thermal Expansion, Water Hammer & Pipe Identification 5.4 Water Heaters, Relief Valves, Hot Water Delivery & Temperature Control 5.5 Water Services, Private Water Mains, Disinfection & Storage Tanks
6 Chapter 6: Cross-Connection Control & Backflow Prevention (SPS 382.41)
6.1 Cross-Connection Fundamentals, Hazard Classes & Pressure Conditions 6.2 Backflow Devices & Assemblies: Table 382.41-1, Limits & Installation 6.3 Assembly Registration, DSPS Tags, Annual Testing & Tester Registration
7 Chapter 7: Plumbing Fixtures, Fittings & Appliances (SPS 384.20)
7.1 Fixture Construction, Clearances, Shower Size & Safing 7.2 Water-Conserving Fixtures, Faucets & Fixture Supply Connectors 7.3 Water Heaters, Water Treatment Devices & Other Plumbing Appliances
8 Chapter 8: Piping Materials, Joints & Supports (SPS 384.30, 384.40, 382.60)
8.1 Approved Piping Materials by Service & Lead-Free Rules 8.2 Joints, Connections & Transitions Between Materials (SPS 384.40) 8.3 Hangers, Supports & Protection of Piping (SPS 382.60)
9 Chapter 9: Private Onsite Wastewater Treatment Systems (SPS 383, 385 & Component Manuals)
9.1 POWTS Regulation, Sanitary Permits, Plan Review & Inspection 9.2 Soil & Site Evaluation and In Situ Soil Parameters (SPS 385, SPS 383.44) 9.3 Design Flow, Septic & Holding Tanks and Tank Construction 9.4 Dispersal Components & the DSPS Component Manuals 9.5 POWTS Setbacks, Management, Maintenance Reporting & Abandonment
10 Chapter 10: Cleanouts, Stormwater, Sumps & Multipurpose Piping
10.1 Cleanouts & Manholes (SPS 382.35) 10.2 Stormwater & Clearwater Systems (SPS 382.36) 10.3 Sanitary Sumps, Ejectors & Discharge Points (SPS 382.30 (10), 382.38) 10.4 Multipurpose Piping Systems & NFPA 13D Residential Sprinklers
11 Chapter 11: Special Plumbing Installations & Water Reuse
11.1 Health Care & Related Facilities (SPS 382.50) 11.2 Manufactured Homes, Campgrounds, RV Parks & Dump Stations 11.3 Water Reuse, Plumbing Treatment Standards & Stormwater Infiltration
6.3 Assembly Registration, DSPS Tags, Annual Testing & Tester Registration
Key Takeaways Explain This Topic AI
RP, RPDA, DC, DCDA, PVB and SVB assemblies must be registered with DSPS no later than 7 days after installation; assemblies serving automatic fire sprinkler systems are exempt.
Each registered assembly displays a weather-resistant tag with its DSPS identification number written in indelible marker.
Performance tests are required at installation, immediately after repair or alteration, and at least annually, using the ASSE 5000-series field test standards in Table 382.22-1.
Non-fire test results go to DSPS and the water purveyor within 60 days, with a filing fee of $30 (or $20 filed electronically) under SPS 302.645 (2).
Testers must be registered under SPS 305.99 after a 40-hour department-approved course or an ASSE 5150 course, keep test records 2 years, and complete 6 hours of CE to renew.
Last updated: October 2026
Legal basis
Wis. Stat. s. 145.06 (3m) says no person may test cross-connection control devices when the test is required by the department unless registered as a cross-connection control tester. SPS 305.99 carries out that registration, SPS 382.20 (1) (c) requires assemblies to be registered, and SPS 382.22 (8) sets the testing schedule.
Step 1: Register the assembly (SPS 382.20 (1) (c))
Each of these assemblies must be registered with the department no later than 7 days after installation :
- Reduced pressure principle backflow prevention assembly (RP)
- Reduced pressure detector backflow prevention assembly (RPDA)
- Double check backflow prevention assembly (DC)
- Double check detector backflow prevention assembly (DCDA)
- Pressure vacuum breaker assembly (PVB)
- Spill-resistant vacuum breaker assembly (SVB)
Assemblies serving automatic fire sprinkler systems do not have to be registered. Assemblies serving health care facilities are part of department plan review (Table 382.20-1, line 5), and for those projects registration is included in the plan approval.
The registration fee under SPS 302.645 (1) is $30 , or $20 if filed electronically.
Step 2: Tag the assembly (SPS 382.40 (3) (d) 4.)
Each registered assembly displays its department-assigned identification number on a weather-resistant tag securely attached to it. The tag must read at least:
Wisconsin Department of Safety and Professional Services; Identification/Object Number ____; Cross Connection Control Assembly; Do Not Remove This Tag
The number is written in permanent, waterproof marker or another indelible method. Sprinkler-system assemblies don't need a number. Piping downstream of the assemblies in Table 382.22-1 must also be labeled with bands or tags (section 5.3).
Step 3: Test it (SPS 382.22 (8))
The testing rules apply to all assemblies regardless of when they were installed. A performance test is required:
- At the time of installation
- Immediately after repairs or alterations
- At least annually
Each test uses the field test standard for that assembly type:
- Assembly Product standard Field test standard Results to DSPS, non-fire use Results to DSPS, fire use
- Double check ASSE 1015 or CSA B64.5 ASSE 5015 Yes No
- Double check detector ASSE 1048 ASSE 5048 Yes No
- Pressure vacuum breaker ASSE 1020 or CSA B64.1.2 ASSE 5020 Yes Not applicable
- Reduced pressure principle ASSE 1013 or CSA B64.4 ASSE 5013 Yes No
- Reduced pressure detector ASSE 1047 ASSE 5047 Yes No
- Spill-resistant vacuum breaker ASSE 1056 or CSA B64.1.3 ASSE 5056 Yes Not applicable
CR 26-019 repealed and recreated Table 382.22-1 effective September 1, 2026.
Filing. Results go to the department and the water purveyor within 60 days of the test, in the department's format, with the filing fee in SPS 302.645 (2): $30 , or $20 if filed electronically. Fire-suppression results are not submitted to DSPS. All results must be available on request to the department, its agent or the local government.
Initial testing at rough-in. SPS 382.21 (1) (d) requires the initial test of a new assembly to follow SPS 382.22 (8), so the installation test is part of the plumbing inspection process.
Step 4: The registered tester (SPS 305.99)
- Item Requirement
- Who may test Only a registered cross connection control assembly tester
Qualification At least 40 hours in a department-approved course on cross-connection theory and the operation, testing and maintenance of assemblies, or an ASSE course meeting ASSE 5150
- Fees (Table 305.02) $15 application, $180 registration
- Records Keep a record of each test (date and result) for at least 2 years ; provide it to DSPS on request
- Renewal At least 6 hours of approved continuing education before expiration
A plumbing license does not by itself authorize testing. A journeyman who wants to test RP assemblies needs the separate tester registration.
Worked scenario
A remodel adds an RP on a boiler makeup line with a chemical feeder and a DC on a low hazard process supply on March 3 .
Register both with DSPS by March 10 (7 days). Paying online, the cost is $20 each.
Tag each with its DSPS number.
A registered tester performs the installation tests per ASSE 5013 and ASSE 5015.
File the results with DSPS and the water utility within 60 days, again $20 each online.
Retest at least annually, and immediately after any rebuild.
If the same building had an RP on its fire sprinkler riser, that RP would need no registration and no DSPS filing . It must still be listed for fire protection use, and NFPA testing requirements still apply.
Exam traps
"Registered within 30 days": wrong. The deadline is 7 days .
"Tested every 3 years": wrong. The minimum frequency is annual .
"Results filed within 10 days": wrong. The deadline is 60 days .
Confusing assembly registration (a DSPS record of the device) with tester registration (a credential under SPS 305.99).