Study guide
9.2 Soil & Site Evaluation and In Situ Soil Parameters (SPS 385, SPS 383.44)
Wisconsin Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Licensing, Exam Rules & Code Administration
1.1 Wisconsin Plumbing Credentials, Scope & Supervision (Ch. 145, SPS 305) 1.2 The Journeyman Exam: Format, Fees, Retakes & Permitted References 1.3 Plan Review, Plan Approval & Product Approvals (SPS 382.20) 1.4 Testing, Inspection, Maintenance & Repairs (SPS 382.21, 382.22) 1.5 Code Structure, Key Definitions, Basic Principles & Referenced Standards
2 Chapter 2: Sanitary Drainage Systems (SPS 382.30)
2.1 Drainage Fixture Units (DFU) & Load Values 2.2 Horizontal Branch Drains, Pitch & Changes in Direction 2.3 Drain Stacks, Branch Intervals & Stack Offsets 2.4 Building Drains, Building Sewers & Private Interceptor Main Sewers
3 Chapter 3: Venting Systems & Cold-Climate Vent Terminals (SPS 382.31)
3.1 Vent Stacks, Relief Vents & Vent Sizing Tables 3.2 Common Vents, Wet Vents & Circuit Vents 3.3 Return Vents, Combination Drain & Vent Systems & Air Admittance Valves 3.4 Vent Terminals, Frost Closure & Prohibited Vent Uses
4 Chapter 4: Traps, Indirect Waste & Wastewater Treatment Devices
4.1 Fixture Traps, Trap Seals & Direct Fixture Connections 4.2 Trap-to-Vent Distances (Table 382.31-1) 4.3 Indirect & Local Waste Piping, Air Gaps & Receptors 4.4 Interceptors, Catch Basins & Chemical Waste Treatment (SPS 382.34)
5 Chapter 5: Water Supply Systems (SPS 382.40)
5.1 Water Supply Fixture Units (WSFU) & Demand 5.2 Sizing Water Distribution Piping: Pressure, Friction & Velocity 5.3 Control Valves, Thermal Expansion, Water Hammer & Pipe Identification 5.4 Water Heaters, Relief Valves, Hot Water Delivery & Temperature Control 5.5 Water Services, Private Water Mains, Disinfection & Storage Tanks
6 Chapter 6: Cross-Connection Control & Backflow Prevention (SPS 382.41)
6.1 Cross-Connection Fundamentals, Hazard Classes & Pressure Conditions 6.2 Backflow Devices & Assemblies: Table 382.41-1, Limits & Installation 6.3 Assembly Registration, DSPS Tags, Annual Testing & Tester Registration
7 Chapter 7: Plumbing Fixtures, Fittings & Appliances (SPS 384.20)
7.1 Fixture Construction, Clearances, Shower Size & Safing 7.2 Water-Conserving Fixtures, Faucets & Fixture Supply Connectors 7.3 Water Heaters, Water Treatment Devices & Other Plumbing Appliances
8 Chapter 8: Piping Materials, Joints & Supports (SPS 384.30, 384.40, 382.60)
8.1 Approved Piping Materials by Service & Lead-Free Rules 8.2 Joints, Connections & Transitions Between Materials (SPS 384.40) 8.3 Hangers, Supports & Protection of Piping (SPS 382.60)
9 Chapter 9: Private Onsite Wastewater Treatment Systems (SPS 383, 385 & Component Manuals)
9.1 POWTS Regulation, Sanitary Permits, Plan Review & Inspection 9.2 Soil & Site Evaluation and In Situ Soil Parameters (SPS 385, SPS 383.44) 9.3 Design Flow, Septic & Holding Tanks and Tank Construction 9.4 Dispersal Components & the DSPS Component Manuals 9.5 POWTS Setbacks, Management, Maintenance Reporting & Abandonment
10 Chapter 10: Cleanouts, Stormwater, Sumps & Multipurpose Piping
10.1 Cleanouts & Manholes (SPS 382.35) 10.2 Stormwater & Clearwater Systems (SPS 382.36) 10.3 Sanitary Sumps, Ejectors & Discharge Points (SPS 382.30 (10), 382.38) 10.4 Multipurpose Piping Systems & NFPA 13D Residential Sprinklers
11 Chapter 11: Special Plumbing Installations & Water Reuse
11.1 Health Care & Related Facilities (SPS 382.50) 11.2 Manufactured Homes, Campgrounds, RV Parks & Dump Stations 11.3 Water Reuse, Plumbing Treatment Standards & Stormwater Infiltration
9.2 Soil & Site Evaluation and In Situ Soil Parameters (SPS 385, SPS 383.44)
Key Takeaways Explain This Topic AI
Soil evaluations and soil saturation determinations must be performed by a certified soil tester; site evaluations (slope, setbacks) may also be done by master plumbers, engineers, designers or POWTS inspectors.
At least 3 soil profile evaluation excavations delineate a site; one must be a soil pit for flows of 1,000 gpd or less, and three for larger flows.
Soil borings must be at least 2 inches in diameter by hand auger, probe, split spoon or Shelby tube; power augers are not allowed.
Influent to in situ soil components is limited to monthly averages of 30 mg/L FOG, 220 mg/L BOD5 and 150 mg/L TSS, with no solids larger than 1/8 inch.
The infiltrative surface must be at least 24 inches above the highest groundwater and bedrock; Table 383.44-3 typically requires 36 inches of unsaturated soil for septic-tank effluent.
Last updated: October 2026
Who does what (SPS 385.10)
- Task Who may perform it
- Soil evaluation for POWTS or ch. SPS 391 sanitation Certified soil tester (CST) only
- Soil evaluation for stormwater under SPS 382 CST or licensed professional soil scientist
Site evaluation (component location, slope, setbacks) Registered architect, engineer, plumbing or private sewage system designer, land surveyor, CST, POWTS inspector, or licensed master plumber or master plumber-restricted service
Soil saturation determination CST only
A journeyman can't sign a soil report, but must recognize when a site or soil condition doesn't match the approved plan.
Number, type and depth of evaluations (SPS 385.20)
At least 3 soil profile evaluation excavations are used to delineate the area for treatment or dispersal components that use in situ soil.
For estimated flows of 1,000 gpd or less , at least one excavation per site must be a soil pit . For flows above 1,000 gpd , at least three must be soil pits.
Application rates must be determined from soil pits . Horizon depth, color, texture, redoximorphic features and depth to groundwater or bedrock may come from pits or borings.
Borings use a bucket auger, probe, split-spoon or Shelby tube at least 2 inches in diameter. A power auger may not be used .
Pits must be big enough to enter and exit safely and describe the profile. OSHA excavation rules apply.
Evaluate color only in good light, and thaw frozen soil before evaluating color, texture, structure or consistence.
Soil profile descriptions (SPS 385.30)
For application rates, each horizon is described by thickness, Munsell color , redoximorphic feature color, abundance, size and contrast, USDA texture with rock-fragment modifiers, structure (grade, size, shape), consistence , roots, boundary, and any saturated soil, groundwater, bedrock or fill.
Interpreting saturation. Redoximorphic features (mottles) are read as seasonal saturation. If they occur within 4 inches of an A horizon at the surface, of the bottom of fill, or of a buried A horizon, the highest seasonal saturation is taken as the ground surface . A CST may discount listed false indicators without a report, including fossilized patterns, residual sandstone colors, lime deposits and naturally gray glacial material. The CST must report each exemption used. Disputed cases go to a soil saturation determination under SPS 385.60.
Reports (SPS 385.40). Each page carries the CST's signature, identification number and date, unless the report is bound with a signed title sheet. The site's legal description must be given to within 40 acres.
In situ soil parameters (SPS 383.44)
Influent quality to a component consisting in part of in situ soil must not exceed these monthly averages:
- Parameter Limit
- Fats, oil and grease 30 mg/L
- BOD5 220 mg/L
- TSS 150 mg/L
- Solids None larger than 1/8 inch
Monthly averages use at least 6 samples on 6 separate days within 30 days. A facility can be designated "at-risk" and required to test.
Infiltrative surface location:
At least 24 inches above the estimated highest groundwater and bedrock.
At least 1 inch below finished grade.
Systems designed from a recognized component manual need at least 6 inches of in situ soil credited in Table 383.44-3 within that separation.
Minimum depth of unsaturated soil for treatment (Table 383.44-3):
- Influent fecal coliform Most soil textures Coarse sands with more than 35 to 60% coarse fragments
- More than 10,000 cfu/100 mL (typical septic tank effluent) 36 inches 60 inches
- 10,000 cfu/100 mL or less (pretreated; pressure distribution required) 24 inches 36 inches
Application rates (Table 383.44-2). Maximum loading in gallons per square foot per day is set by texture, structure, grade and effluent strength. For example, with effluent over 30 mg/L BOD5, a fine sand (FS) is rated 0.5 , and a sandy loam with weak blocky structure 0.4 . Moderate to strong platy structure is limited to 0.2 even with clean effluent, and to 0 with stronger effluent. The highest-concentration parameter controls. Soil consistence stronger than firm , or any cemented soil, may not hold the infiltrative surface.
Pressure distribution is required where Tables 383.44-2 and 383.44-3 call for it. Each pressurized dose must be at least 5 times the void volume of the laterals.
Installation conditions (SPS 383.45)
Don't install in-soil components if the soil is frozen at or below the infiltrative surface.
Remove snow cover before excavating.
Moisture test: if soil at the infiltrative surface can be rolled into a 1/4-inch wire , stop. It is too wet and will smear.
Bed vessels and pipes per the product or plan approval.
In floodplains, tanks are watertight and vents end at least 2 feet above the regional flood level .
Effluent lines and forcemains have at least 12 inches of cover.