Study guide
2.3 Drain Stacks, Branch Intervals & Stack Offsets
Wisconsin Journeyman Plumber Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Licensing, Exam Rules & Code Administration
1.1 Wisconsin Plumbing Credentials, Scope & Supervision (Ch. 145, SPS 305) 1.2 The Journeyman Exam: Format, Fees, Retakes & Permitted References 1.3 Plan Review, Plan Approval & Product Approvals (SPS 382.20) 1.4 Testing, Inspection, Maintenance & Repairs (SPS 382.21, 382.22) 1.5 Code Structure, Key Definitions, Basic Principles & Referenced Standards
2 Chapter 2: Sanitary Drainage Systems (SPS 382.30)
2.1 Drainage Fixture Units (DFU) & Load Values 2.2 Horizontal Branch Drains, Pitch & Changes in Direction 2.3 Drain Stacks, Branch Intervals & Stack Offsets 2.4 Building Drains, Building Sewers & Private Interceptor Main Sewers
3 Chapter 3: Venting Systems & Cold-Climate Vent Terminals (SPS 382.31)
3.1 Vent Stacks, Relief Vents & Vent Sizing Tables 3.2 Common Vents, Wet Vents & Circuit Vents 3.3 Return Vents, Combination Drain & Vent Systems & Air Admittance Valves 3.4 Vent Terminals, Frost Closure & Prohibited Vent Uses
4 Chapter 4: Traps, Indirect Waste & Wastewater Treatment Devices
4.1 Fixture Traps, Trap Seals & Direct Fixture Connections 4.2 Trap-to-Vent Distances (Table 382.31-1) 4.3 Indirect & Local Waste Piping, Air Gaps & Receptors 4.4 Interceptors, Catch Basins & Chemical Waste Treatment (SPS 382.34)
5 Chapter 5: Water Supply Systems (SPS 382.40)
5.1 Water Supply Fixture Units (WSFU) & Demand 5.2 Sizing Water Distribution Piping: Pressure, Friction & Velocity 5.3 Control Valves, Thermal Expansion, Water Hammer & Pipe Identification 5.4 Water Heaters, Relief Valves, Hot Water Delivery & Temperature Control 5.5 Water Services, Private Water Mains, Disinfection & Storage Tanks
6 Chapter 6: Cross-Connection Control & Backflow Prevention (SPS 382.41)
6.1 Cross-Connection Fundamentals, Hazard Classes & Pressure Conditions 6.2 Backflow Devices & Assemblies: Table 382.41-1, Limits & Installation 6.3 Assembly Registration, DSPS Tags, Annual Testing & Tester Registration
7 Chapter 7: Plumbing Fixtures, Fittings & Appliances (SPS 384.20)
7.1 Fixture Construction, Clearances, Shower Size & Safing 7.2 Water-Conserving Fixtures, Faucets & Fixture Supply Connectors 7.3 Water Heaters, Water Treatment Devices & Other Plumbing Appliances
8 Chapter 8: Piping Materials, Joints & Supports (SPS 384.30, 384.40, 382.60)
8.1 Approved Piping Materials by Service & Lead-Free Rules 8.2 Joints, Connections & Transitions Between Materials (SPS 384.40) 8.3 Hangers, Supports & Protection of Piping (SPS 382.60)
9 Chapter 9: Private Onsite Wastewater Treatment Systems (SPS 383, 385 & Component Manuals)
9.1 POWTS Regulation, Sanitary Permits, Plan Review & Inspection 9.2 Soil & Site Evaluation and In Situ Soil Parameters (SPS 385, SPS 383.44) 9.3 Design Flow, Septic & Holding Tanks and Tank Construction 9.4 Dispersal Components & the DSPS Component Manuals 9.5 POWTS Setbacks, Management, Maintenance Reporting & Abandonment
10 Chapter 10: Cleanouts, Stormwater, Sumps & Multipurpose Piping
10.1 Cleanouts & Manholes (SPS 382.35) 10.2 Stormwater & Clearwater Systems (SPS 382.36) 10.3 Sanitary Sumps, Ejectors & Discharge Points (SPS 382.30 (10), 382.38) 10.4 Multipurpose Piping Systems & NFPA 13D Residential Sprinklers
11 Chapter 11: Special Plumbing Installations & Water Reuse
11.1 Health Care & Related Facilities (SPS 382.50) 11.2 Manufactured Homes, Campgrounds, RV Parks & Dump Stations 11.3 Water Reuse, Plumbing Treatment Standards & Stormwater Infiltration
2.3 Drain Stacks, Branch Intervals & Stack Offsets
Key Takeaways Explain This Topic AI
A branch interval is a vertical distance of 8 feet or more between horizontal branch connections to a drain stack (SPS 381.01 (35)).
A 4-inch stack may take 90 dfu into one branch interval, 240 dfu total with 3 or fewer intervals, and 500 dfu total with more than 3 intervals.
Every gravity sanitary building sewer needs at least one stack, at least 3 inches in diameter, running from the building drain to a vent terminal or vent header (SPS 382.31 (3) (b)).
Stacks may be reduced as the load drops, to no less than half the base diameter and never smaller than the required stack vent.
Horizontal branches may not connect within 10 pipe diameters of the drain downstream of a stack base fitting, and building drain branches not within 20 diameters (SPS 382.30 (7)).
Last updated: October 2026
Branch intervals: the key definition
SPS 381.01 (35) defines a branch interval as "a vertical measurement of distance, 8 feet or more in length, between the connections of horizontal branches to a drainage stack." In practice this is usually one floor. Branches that connect less than 8 feet apart fall in the same interval. The number of intervals decides which stack column you read and whether a vent stack is required (5 or more intervals, see section 3.1).
Stack columns of Table 382.30-2
Stack diameter (in.) Total discharge into one branch interval Stack with 3 branch intervals or less Stack with more than 3 branch intervals
- 1-1/4 1 2 2
- 1-1/2 2 4 8
- 2 6 10 24
- 3 20 48 72
- 4 90 240 500
- 5 200 540 1,100
- 6 350 960 1,900
- 8 600 2,200 3,600
- 10 1,000 3,800 5,600
- 12 1,500 6,000 8,400
A stack must pass both checks: the load entering any single branch interval, and the total load on the stack. Footnote a says the check point "includes all of the flow at the design point." Footnote d says the load "into one branch interval" includes the top fitting of the interval but not the bottom fitting that creates it.
Worked example. A six-story office has a 4-inch stack. Each floor's restroom branch carries 33 dfu (see section 2.1). The stack has more than 3 branch intervals, so the total limit is 500 dfu: 6 x 33 = 198 dfu passes. The per-interval limit is 90 dfu, and 33 passes. If one floor instead carried 96 dfu, the 4-inch stack would fail the one-interval column even though the total is fine, so that stack would need to be 5 inches.
The main stack and stack reductions
Main stack. Each gravity-flow sanitary building sewer must be served by at least one stack extending from a building drain to a vent terminal or vent header. That stack must be at least 3 inches for its full height (SPS 382.31 (3) (b)). A house with only 2-inch stacks fails this rule.
Reductions. Footnote c of Table 382.30-2 lets drain stacks be reduced as the load decreases. The minimum is one-half the diameter required at the base , and never smaller than the stack vent required by SPS 382.31 (14) (a). Footnote e allows the reduction within a branch interval.
Offsets in vertical drains (SPS 382.30 (6))
Offset angle from vertical Sizing rule Extra conditions
45 degrees or less Size as vertical drain piping A horizontal branch within 2 ft above or below a 30 to 45 degree offset that has 5 or more branch intervals above it triggers offset venting under SPS 382.31 (5) (a)
More than 45 degrees Above the offset: vertical sizing; the offset itself: building-drain sizing (Table 382.30-3); below the offset: not smaller than the offset Offset more than 4 branch intervals below the top: no horizontal branch within the offset or within 2 ft above or below it
An offset of more than 45 degrees below 5 or more branch intervals must be vented under SPS 382.31 (5) (b). The venting is waived when the stack and offset are upsized one pipe size beyond building-drain sizing and the cross-section equals the stack plus the required vent. Exception (6) (c): an offset located 2 or more feet below the lowest branch drain connection needs no offset venting at all.
No-connection zones at the base of a stack (SPS 382.30 (7))
Turbulence and a hydraulic jump occur where a stack turns horizontal. Wisconsin keeps branches out of that zone:
A horizontal branch drain may not connect downstream of the base fitting of a drain stack 2 inches or larger within 10 pipe diameters of the drain it joins.
A building drain branch or building subdrain branch may not connect within 20 pipe diameters of the building drain or subdrain.
On a 4-inch building drain, the horizontal-branch zone is 10 x 4 = 40 inches and the building-drain-branch zone is 20 x 4 = 80 inches downstream of the base fitting.
Stack-related rules found elsewhere
Drain stacks of 5 or more branch intervals need a vent stack and a stack vent (SPS 382.31 (4)).
Drain stacks of more than 10 branch intervals need a relief vent at each tenth interval (SPS 382.31 (6)).
A stack may act as a combination drain and vent only for the limited cases in SPS 382.31 (17) (section 3.3).
Exam strategy
Write down three numbers before you open Table 382.30-2: the dfu entering the busiest interval, the total dfu at the stack base, and the number of branch intervals. Then read the correct column. Most wrong answers come from using the "3 intervals or less" column for a tall building, or checking only the total.