7.2 Scaffolding Standards, Competent Inspection & SANS 10085 (CR 16)

SACPCMP Construction Health & Safety Manager Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: South African Occupational Health and Safety Legislation

1.1 The OHS Act Framework, General Duties of Employers and Employees 1.2 Corporate Governance and Section 16 Liability & Delegations 1.3 Worker Representation: Health & Safety Representatives and Committees 1.4 Mandatary Agreements, Acts/Omissions & Criminal Liability

2 Chapter 2: Construction Regulations 2014 & Legal Appointments

2.1 Construction Work Permits, Notifications & Client Duties 2.2 Designer Duties and Principal Contractor Obligations 2.3 Statutory Construction Supervision Appointments 2.4 The CHS Manager vs CHS Officer vs CHS Agent & Professional Registration

3 Chapter 3: Risk Assessment Methodologies & The HIRA Process

3.1 Fundamental Risk Terminology: Hazards, Risks, Consequences & Tolerability 3.2 The Three Tiers of HIRA: Baseline, Issue-Based & Continuous Risk Assessments 3.3 Risk Rating Matrices: Quantitative, Semi-Quantitative & Qualitative Scoring 3.4 Task-Based Risk Assessments (TBRA) & Workforce Participation

4 Chapter 4: Risk Control Hierarchy & Safe Work Procedures

4.1 The Hierarchy of Controls in Construction Operations 4.2 Developing and Implementing Safe Work Procedures (SWPs) and SOPs 4.3 Daily Safety Task Instructions (DSTI) and Pre-Task Risk Reviews

5 Chapter 5: Specifications, Plans & The Health and Safety File

5.1 Client Health and Safety Specifications 5.2 The Principal Contractor Health & Safety Plan: Structure and Approval 5.3 Compiling and Maintaining the Consolidated Health & Safety File 5.4 Subcontractor Safety File Verification and Onboarding

6 Chapter 6: Specialized Safety Plans, Method Statements & Registers

6.1 Comprehensive Fall Protection Planning (CR 10 Requirements) 6.2 Contractor Method Statements and Risk Alignment 6.3 Statutory Registers, Checklists, and Inspection Logs

7 Chapter 7: Working at Heights & Temporary Works

7.1 Working at Heights: Fall Prevention, Fall Arrest & Rescue Systems 7.2 Scaffolding Standards, Competent Inspection & SANS 10085 (CR 16) 7.3 Temporary Works Management: Formwork, Falsework & Support Structures (CR 12)

8 Chapter 8: Excavations, Demolition & Heavy Plant Operations

8.1 Excavation Safety, Shoring, Battering & Underground Services (CR 13) 8.2 Demolition Work, Structural Assessment & Control Zones (CR 14) 8.3 Mobile Plant, Construction Vehicles & Cranes (CR 22, 23)

9 Chapter 9: Electrical Safety, Hazardous Chemicals & Confined Spaces

9.1 Temporary Electrical Installations, Distribution Boards & SANS 10142 (CR 24) 9.2 Hazardous Chemical Agents (HCA) & the Globally Harmonized System (GHS) 9.3 Confined Space Entry, Atmospheric Testing & Emergency Protocols (GSR 5)

10 Chapter 10: Incident Reporting, Statutory Notifications & Investigations

10.1 OHS Act Section 24 Statutory Reporting Criteria and Timeframes 10.2 Compensation for Occupational Injuries and Diseases Act (COIDA) Compliance 10.3 Incident Scene Preservation and Evidence Gathering Protocols 10.4 Root Cause Analysis Methodologies (5 Whys, Fishbone) & CAPA

11 Chapter 11: Safety Auditing, Worker Consultation & Site Training

11.1 Internal Audits, Client Oversight Audits & Scoring Protocols (CR 5(1)(o), CR 7(1)(c)) 11.2 Non-Conformance Reports (NCRs), Corrective Actions & Close-Out Mandatory Site Induction, Competency Verification & Training Programs (CR 7(5)–(7)) 11.4 Medical Surveillance, Certificate of Fitness & Hygiene Monitoring (CR 7(8))

12 Chapter 12: Health and Safety Management Systems, Performance & Culture

12.1 Health and Safety Management Systems & ISO 45001 12.2 Health and Safety Performance Measurement, Statistics & Trend Analysis 12.3 Leadership, People & Health and Safety Culture 12.4 Innovation & Technology in Construction Health and Safety

13 Chapter 13: Emergency Preparedness, Communication & Health and Safety Procurement

13.1 Emergency Preparedness, Fire Precautions & First Aid (CR 29, GSR 3) 13.2 Health and Safety Communication, Consultation, Meetings & Reporting 13.3 Health and Safety Procurement & Cost Management

14 Chapter 14: Physical Agents, Environmental Management & Specialised Site Controls

14.1 Noise, Physical Agents & Ergonomics on Construction Sites 14.2 Environmental Management on Construction Projects 14.3 Specialised Site Controls: Structures, Platforms, Hoists, Plant & Facilities (CR 11, 15, 17-21, 25-28, 30)

7.2 Scaffolding Standards, Competent Inspection & SANS 10085 (CR 16)

Key Takeaways Explain This Topic AI

Construction Regulation 16(1) requires a competent person appointed in writing to supervise all scaffolding work and ensure erectors, team leaders and inspectors are competent; CR 16(2) requires compliance with the incorporated standard, SANS 10085.

SANS 10085-1 tube-and-fitting classes are Very light 80, Light 160 (including plastering), Medium 240 (brickwork and blockwork) and Heavy 320 kg/m².

Soleboards must be at least 225 mm wide and at least 32 mm thick (45 mm above 15 m), on well-compacted, level ground; bricks, drums and rubble are prohibited supports.

Where a person could fall more than 2 m, platforms need toeboards at least 150 mm high and a guardrail with its centre line 900–1 000 mm above the platform, with no more than 765 mm between them.

Scaffolds must be inspected by a competent person at least weekly and after inclement weather, mishaps, alterations and before dismantling, with results recorded in the inspection register.

Last updated: October 2026

  • 7.2 Scaffolding Standards, Competent Inspection & SANS 10085 (CR 16)
  • 1. Statutory Framework

Access scaffolding is everywhere on South African sites, and scaffold collapses and falls from platforms are among the most serious construction incidents. Three instruments govern it:

Construction Regulation 16(1): the contractor must appoint a competent person in writing who ensures that all scaffolding work operations are carried out under their supervision, and that all scaffold erectors, team leaders and inspectors are competent to carry out their work.

Construction Regulation 16(2): access scaffolding, when in use, must comply with the safety standards incorporated into the Regulations under Section 44 of the Act. The Department's 2017 guideline note states that scaffolds must comply with SANS 10085 , and the note to CR 12 adds that the design of scaffolds refers to design in terms of SANS 10085. Scaffolds are also "temporary works" under CR 1.

SANS 10085-1 ( The design, erection, use and inspection of access scaffolding ): the figures in this section come from the 2004 edition (edition 1.1). A second edition was published in 2024, so check which edition the client's specification requires.

2. Duty Classes and Safe Working Loads

SANS 10085-1 classifies scaffolds by the maximum safe working load on each platform. For tube-and-fitting scaffolding (Table 4):

  • Class Typical use Max platform load (kg/m²) Approx. kN/m² Max standard spacing Platform width (mm)
  • Very light (VL) Inspection, painting, stone cleaning 80 0.8 3 m 675–1 150
  • Light (L) Repointing, replacing windows, plastering , insulation 160 1.6 2.5 m 900–1 150
  • Medium (M) – general purpose New building, brickwork, blockwork 240 2.4 2 m 1 125–1 150
  • Heavy (H) Masonry, heavy cladding 320 3.1 1.8 m 1 125–1 380

The table limits how many platforms may be loaded at once (for example two medium platforms plus one very light). For system scaffolding (Table 5) the spacing for VL, L and M is 2.5 m, and heavy-duty system scaffolds must be referred to a person competent in scaffold design. Every access point should display the class and permitted load, and pallets of blocks should go on designed loading bays, not on access platforms.

3. Foundations: Soleboards and Base Jacks

SANS 10085-1 requires:

Soleboards of suitable timber at least 225 mm wide , at least 32 mm thick for scaffolds up to 15 m high and at least 45 mm thick above 15 m (clause 5.4).

Material under soleboards to be well compacted ; on good hard soils the soleboard must be continuous under at least two standards ; on soft soils double soleboards should be used. Soleboards must be level to within 1:50 .

The lowest ledgers or foot ties no more than 300 mm above the bottom of the standards.

Unsuitable supports must never be used: drums, barrels, loose bricks and brick piers, rubble, boxes and crates, and three-legged timber trestles (clause 11.3.2).

Base jacks must not be extended beyond the manufacturer's limit: over-extension increases the effective buckling length of the standard and its eccentric loading.

4. Ties, Bracing and Stability

Sufficient bracing and ties must be provided to keep the scaffold stable in all conditions (clause 10.5). Ties are either fixed (positively attached, for example box ties around columns or designed anchors) or reveal ties that rely on friction (clause 10.10.3.2). Any tie that must be removed to allow work is replaced, under a competent person's supervision, before an adjacent tie is moved . Sheeting or netting greatly increases wind load, so sheeted scaffolds need more ties and should be designed by a competent scaffold designer. Tie patterns, spacings and anchor tests should follow the scaffold design and the standard's tables, not rules of thumb.

5. Working Platforms and Edge Protection (Clause 10.19)

Working platforms must:

have the width given for their class (at least 450 mm for access-only platforms and hop-up brackets);

be supported at spacings that suit the board thickness, with boards of similar thickness, minimal gaps between edges, and overhangs within the standard's minimum and maximum limits;

be as close to the structure as practicable (no more than 300 mm where workers sit while working), with all boards tied down ;

where a person could fall more than 2 m , have on the outer edge and both ends toeboards at least 150 mm high (timber at least 25 mm thick) and a guardrail with its centre line 900–1 000 mm above the platform , with no more than 765 mm between guardrail and toeboard (cross-braces do not count as guardrails); and

have brickguards or similar protection where materials are stacked above the toeboard, and vertical sheeting during demolition.

6. Access Ladders (Clause 10.7)

A ladder used with scaffolding must be firmly supported and secured against slipping or overturning, extend at least 900 mm above the landing it serves, never be extended by tying ladders together, be no longer than 9 m as a single ladder, and be fitted inside the scaffold framework . Vertical ladders without a cage need rest platforms at intervals not exceeding 8 m. Workers must never climb the outside of the scaffold.

7. Inspection, Tagging and the Register (Clause 12)

Scaffolding materials must be inspected by a competent person before erection (12.1).

The scaffold must be inspected by a competent person at least once a week (12.2), and immediately after inclement weather, after any mishap causing jarring, tilting or overloading, after alterations, and before dismantling (12.5).

Results go into a scaffold inspection register (12.6; Annex C shows the minimum content), and defective equipment is marked and quarantined (12.7).

Sites add a handover certificate before first use and a tag system at every access point (green or "safe for use" with the class and inspection date; red or "do not use" during erection, alteration or after damage). Tags are site practice; the register is the record the standard requires.

8. Use of the Scaffold

SANS 10085-1 also requires that no person is permitted on scaffolding during hazardous weather (11.5.3), public access is prevented (11.5.4), debris and unneeded materials are removed at least daily (11.4.5), and scaffolders wear harnesses or restraint belts as the hazard assessment requires during erection and dismantling (11.5.1).

9. The CHSM's Scaffold Checklist

  • Check Standard
  • Written CR 16(1) appointment; competent erectors, team leaders, inspectors CR 16(1)
  • Class and load signage match the work (e.g. plastering = Light, brickwork = Medium) SANS 10085-1 Tables 4–5
  • Soleboards ≥225 mm wide, 32/45 mm thick, on compacted level ground; no bricks or drums Clauses 5.4, 11.3.2
  • Ties and bracing per design; replaced before adjacent ties are moved Clauses 10.5, 10.10.3
  • Platforms fully boarded and tied down; toeboards ≥150 mm; guardrails 900–1 000 mm; gap ≤765 mm Clause 10.19
  • Ladders inside the frame, extending ≥900 mm, single ladder ≤9 m Clause 10.7
  • Register entries at least weekly and after weather, mishaps and alterations Clause 12

Loading diagram... Scaffold Appointment, Erection and Inspection Cycle