9.1 Temporary Electrical Installations, Distribution Boards & SANS 10142 (CR 24)

SACPCMP Construction Health & Safety Manager Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: South African Occupational Health and Safety Legislation

1.1 The OHS Act Framework, General Duties of Employers and Employees 1.2 Corporate Governance and Section 16 Liability & Delegations 1.3 Worker Representation: Health & Safety Representatives and Committees 1.4 Mandatary Agreements, Acts/Omissions & Criminal Liability

2 Chapter 2: Construction Regulations 2014 & Legal Appointments

2.1 Construction Work Permits, Notifications & Client Duties 2.2 Designer Duties and Principal Contractor Obligations 2.3 Statutory Construction Supervision Appointments 2.4 The CHS Manager vs CHS Officer vs CHS Agent & Professional Registration

3 Chapter 3: Risk Assessment Methodologies & The HIRA Process

3.1 Fundamental Risk Terminology: Hazards, Risks, Consequences & Tolerability 3.2 The Three Tiers of HIRA: Baseline, Issue-Based & Continuous Risk Assessments 3.3 Risk Rating Matrices: Quantitative, Semi-Quantitative & Qualitative Scoring 3.4 Task-Based Risk Assessments (TBRA) & Workforce Participation

4 Chapter 4: Risk Control Hierarchy & Safe Work Procedures

4.1 The Hierarchy of Controls in Construction Operations 4.2 Developing and Implementing Safe Work Procedures (SWPs) and SOPs 4.3 Daily Safety Task Instructions (DSTI) and Pre-Task Risk Reviews

5 Chapter 5: Specifications, Plans & The Health and Safety File

5.1 Client Health and Safety Specifications 5.2 The Principal Contractor Health & Safety Plan: Structure and Approval 5.3 Compiling and Maintaining the Consolidated Health & Safety File 5.4 Subcontractor Safety File Verification and Onboarding

6 Chapter 6: Specialized Safety Plans, Method Statements & Registers

6.1 Comprehensive Fall Protection Planning (CR 10 Requirements) 6.2 Contractor Method Statements and Risk Alignment 6.3 Statutory Registers, Checklists, and Inspection Logs

7 Chapter 7: Working at Heights & Temporary Works

7.1 Working at Heights: Fall Prevention, Fall Arrest & Rescue Systems 7.2 Scaffolding Standards, Competent Inspection & SANS 10085 (CR 16) 7.3 Temporary Works Management: Formwork, Falsework & Support Structures (CR 12)

8 Chapter 8: Excavations, Demolition & Heavy Plant Operations

8.1 Excavation Safety, Shoring, Battering & Underground Services (CR 13) 8.2 Demolition Work, Structural Assessment & Control Zones (CR 14) 8.3 Mobile Plant, Construction Vehicles & Cranes (CR 22, 23)

9 Chapter 9: Electrical Safety, Hazardous Chemicals & Confined Spaces

9.1 Temporary Electrical Installations, Distribution Boards & SANS 10142 (CR 24) 9.2 Hazardous Chemical Agents (HCA) & the Globally Harmonized System (GHS) 9.3 Confined Space Entry, Atmospheric Testing & Emergency Protocols (GSR 5)

10 Chapter 10: Incident Reporting, Statutory Notifications & Investigations

10.1 OHS Act Section 24 Statutory Reporting Criteria and Timeframes 10.2 Compensation for Occupational Injuries and Diseases Act (COIDA) Compliance 10.3 Incident Scene Preservation and Evidence Gathering Protocols 10.4 Root Cause Analysis Methodologies (5 Whys, Fishbone) & CAPA

11 Chapter 11: Safety Auditing, Worker Consultation & Site Training

11.1 Internal Audits, Client Oversight Audits & Scoring Protocols (CR 5(1)(o), CR 7(1)(c)) 11.2 Non-Conformance Reports (NCRs), Corrective Actions & Close-Out Mandatory Site Induction, Competency Verification & Training Programs (CR 7(5)–(7)) 11.4 Medical Surveillance, Certificate of Fitness & Hygiene Monitoring (CR 7(8))

12 Chapter 12: Health and Safety Management Systems, Performance & Culture

12.1 Health and Safety Management Systems & ISO 45001 12.2 Health and Safety Performance Measurement, Statistics & Trend Analysis 12.3 Leadership, People & Health and Safety Culture 12.4 Innovation & Technology in Construction Health and Safety

13 Chapter 13: Emergency Preparedness, Communication & Health and Safety Procurement

13.1 Emergency Preparedness, Fire Precautions & First Aid (CR 29, GSR 3) 13.2 Health and Safety Communication, Consultation, Meetings & Reporting 13.3 Health and Safety Procurement & Cost Management

14 Chapter 14: Physical Agents, Environmental Management & Specialised Site Controls

14.1 Noise, Physical Agents & Ergonomics on Construction Sites 14.2 Environmental Management on Construction Projects 14.3 Specialised Site Controls: Structures, Platforms, Hoists, Plant & Facilities (CR 11, 15, 17-21, 25-28, 30)

9.1 Temporary Electrical Installations, Distribution Boards & SANS 10142 (CR 24)

Key Takeaways Explain This Topic AI

Construction Regulation 24 applies in addition to the Electrical Installation Regulations 2009 and the Electrical Machinery Regulations 1988, and lists five duties, (a) to (e), with no subregulations.

CR 24(c) requires control of all temporary electrical installations to be designated to a competent person appointed in writing, and CR 24(d) requires those installations to be inspected at least weekly with findings recorded in a register.

CR 24(e) requires all electrical machinery to be inspected daily by the authorised operator or user, using a checklist, with findings recorded in a site register.

Under the Electrical Installation Regulations, installation work is done by registered persons for registered electrical contractors, and a certificate of compliance is issued for completed or altered installations.

Socket outlet and portable equipment circuits need earth leakage protection of not more than 30 mA (SANS 10142-1), and overhead lines need the owner's safe distance, exclusion zones and goalposts with height limiters.

Last updated: October 2026

1. The Statutory Framework for Electricity on Site

Temporary electrical reticulation on construction sites faces rain, mud, mechanical damage from plant, repeated extension and alteration, and heavy use of hand tools. Three sets of rules apply together:

Construction Regulation 24 (electrical installations and machinery on construction sites), which applies in addition to the Electrical Installation Regulations, 2009 and the Electrical Machinery Regulations, 1988.

The Electrical Installation Regulations, 2009 (EIR) , which govern who may do electrical installation work and require a certificate of compliance (CoC) for installations, issued by a registered person.

The Electrical Machinery Regulations, 1988 (EMR) , which govern electrical machinery, including work on or near live equipment and safety clearances from overhead power lines.

The technical standard with which low-voltage installations, including temporary site installations, must comply is SANS 10142-1 ( The wiring of premises – Low-voltage installations ).

2. What Construction Regulation 24 Requires

CR 24 has no subregulations; it lists five duties, (a) to (e). A contractor must ensure that:

(a) before construction starts and while it progresses, adequate steps are taken to ascertain the presence of, and guard against danger from, any electrical cable or apparatus under, over or on the site ;

(b) all parts of electrical installations and machinery are of adequate strength to withstand construction site conditions;

(c) the control of all temporary electrical installations is designated to a competent person appointed in writing ;

(d) all temporary electrical installations are inspected at least once a week by a competent person, with the findings recorded in a register kept on site; and

(e) all electrical machinery is inspected by the authorised operator or user daily , using a relevant checklist before use, with the findings recorded in a register kept on site.

Exam traps: the weekly inspection in (d) covers the installation (boards, cables, connections, earth leakage units); the daily check in (e) covers machinery (tools, mixers, saws) and is done by the user . CR 24 does not itself prescribe monthly tool tests, IP ratings or board heights; those come from SANS 10142-1, manufacturers and client specifications.

3. Who May Do the Work and Certification

Under the EIR, electrical installation work must be done by, or under the general control of, a registered person (electrical tester for single phase, installation electrician, or master installation electrician, depending on the work) working for a registered electrical contractor . A registered person must issue a certificate of compliance when an installation is completed or altered, backed by a test report. On a construction site, that means a CoC for the temporary supply and further test reports or CoCs as the temporary network is extended to new areas, tower cranes, hoists or batching plants. The CHSM should keep copies in the health and safety file with the CR 24(c) appointment.

4. Distribution Boards and Earth Leakage Protection

Good practice for site distribution boards, drawn from SANS 10142-1 and typical client specifications:

Enclosure: robust, weatherproof and suitable for outdoor use (an ingress protection rating appropriate to dust and water jets is commonly specified), with intact gland plates and socket covers.

Position: mounted on a stand or wall, off the ground and out of standing water, with clear access.

Security: lockable, with keys held by the competent person and authorised electricians.

Earth leakage protection: socket outlets and portable equipment circuits protected by earth leakage devices with a rated residual operating current not exceeding 30 mA ; devices of 100 mA or more protect against fire, not against fatal shock.

Testing: users press the test button before use, and the competent person's weekly inspection (CR 24(d)) includes the earth leakage units, with instrument trip tests at the frequency the electrical contractor specifies.

Labelling: voltage warnings, circuit identification and the name and contact details of the competent person.

5. Site Cables and Portable Equipment

Cable selection and routing: armoured cable for fixed sub-mains; flexible cords only where flexibility is needed, kept short and off wet ground. Buried cables should be at a suitable depth, marked and protected; overhead runs should be supported at heights that keep them clear of vehicles and plant. Road crossings use cable protectors or ducts.

Damaged cords: taped joints, cut sheaths and broken plugs mean immediate withdrawal; repairs must be done by a competent person with proper connectors.

Reduced-voltage and double-insulated tools: 110 V centre-tapped-earth supplies limit the voltage to earth to about 55 V, and Class II (double-insulated) tools reduce dependence on the earth conductor; both still need earth leakage protection on the supply.

Daily checks and records: under CR 24(e), the operator or user inspects electrical machinery daily against a checklist and records it. Many sites add a periodic tagging inspection of portable tools by a competent person.

6. Overhead Power Lines and Buried Cables

CR 24(a) requires the presence of cables and apparatus on, under or over the site to be established and guarded against. In practice:

Overhead lines: obtain the line owner's (Eskom's or the municipality's) written safe working distance for each line, because the EMR clearance requirements increase with voltage; mark exclusion zones; erect goalposts with height limiters on both sides of every crossing point; and plan crane, concrete-pump and tipper movements so that booms and loads cannot enter the exclusion zone, allowing for swing and conductor sag.

Buried cables: treat drawings as indicative, scan with a cable avoidance tool and signal generator, expose cables by hand or vacuum excavation before mechanical digging near them (see Section 8.1 and CR 13(2)(g)), and use the cable owner's permit system for work near live cables.

7. Summary Matrix

  • Topic Source Requirement
  • Locate and guard against cables and apparatus CR 24(a) Before and during construction
  • Equipment robust enough for site conditions CR 24(b) Construction-grade installations and machinery
  • Control of temporary installations CR 24(c) Competent person appointed in writing
  • Inspection of temporary installations CR 24(d) At least weekly; register on site
  • Inspection of electrical machinery CR 24(e) Daily by operator or user; checklist; register

Installation work and CoC EIR 2009 Registered person and registered electrical contractor; CoC for completed or altered installations

Shock protection SANS 10142-1 Earth leakage devices of not more than 30 mA on socket and portable equipment circuits

  • Overhead lines EMR 1988; line owner Safe distance by voltage; goalposts and height limiters
  • 8. The CHSM's Electrical Checks

The CHS Manager verifies the CR 24(c) appointment and the CoC, reads the weekly CR 24(d) register and samples the CR 24(e) daily checklists, tests that earth leakage units trip, looks for damaged or taped cords, and checks that every crossing under an overhead line has goalposts and a recorded safe distance.