Study guide
18.3 Demolition Work and Structural Stability
SACPCMP Construction Health & Safety Officer CHSO
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: South African Occupational Health and Safety Act (OHS Act 85 of 1993)
1.1 Scope, Purpose, and General Employer Duties (Sections 8, 9, 10) 1.2 Employee Duties, Rights, and Health & Safety Representation (Sections 14, 17, 18, 19, 20) 1.3 Corporate Governance, Accountability, and Mandatary Agreements (Sections 16, 37, 44)
2 Chapter 2: Construction Regulations 2014: Governance & Key Roles
2.1 Scope, Construction Work Permits, and Notifications (Regulations 1, 3, 4, Annexure 2) 2.2 Statutory Duties of Clients, Designers, and Principal Contractors (Regulations 5, 6, 7) 2.3 Site Supervision and Management Appointments (Regulation 8: CR 8(1), 8(2), 8(5), 8(7), 8(8))
3 Chapter 3: Compensation, Liability, and Administrative Regulations
3.1 Compensation for Occupational Injuries and Diseases Act (COIDA 130 of 1993) & Civil Liability 3.2 General Administrative Regulations (GAR) 2003: Reporting & Investigating Provisions 3.3 SACPCMP Statutory Mandate, Registration Rules, and Code of Conduct
4 Chapter 4: Risk Assessment Methodologies & Types
4.1 The Three Tiers of Construction Risk Assessment: Baseline, Issue-Based, and Continuous (CR 9) 4.2 Qualitative and Semi-Quantitative Risk Scoring (Probability, Severity, Matrix Evaluation) 4.3 Hierarchy of Risk Controls: From Elimination to Personal Protective Equipment
5 Chapter 5: Safe Work Procedures, Method Statements & Dynamic Risk
5.1 Developing Safe Work Procedures (SWPs) from Risk Assessments 5.2 Safe Work Method Statements (SWMS) and Task Execution 5.3 Daily Safe Task Instructions (DSTI), Toolbox Talks, and Dynamic Site Risk Management
6 Chapter 6: Health and Safety File & Planning Documentation
6.1 Client Health and Safety Specifications vs. Principal Contractor Health and Safety Plan 6.2 Structure, Contents, and Maintenance of the Site Health and Safety File (CR 7(1)(b), 7(2)(b) & 7(1)(e)) 6.3 Contractor Vetting, Approval, and Monthly Compliance Auditing (CR 5(1)(o) & CR 7)
7 Chapter 7: Statutory Registers, Checklists & Legal Appointments
7.1 Equipment and Plant Registers: Scaffolding, Ladders, and Portable Electrical Tools 7.2 Medical, Occupational Hygiene, and PPE Registers 7.3 Compiling, Signing, and Enforcing Legal Letters of Appointment on Site
8 Chapter 8: High-Risk Works: Working at Heights & Scaffolding
8.1 Fall Protection Plans, Fall Prevention, and Fall Arrest Systems (CR 10) 8.2 Scaffolding Erection, Tagging, and SANS 10085 Standards (CR 16) 8.3 Suspended Platforms, Boatswain's Chairs, and Rope Access (CR 17 & CR 18)
9 Chapter 9: Groundworks, Temporary Works & Heavy Operations
9.1 Excavations, Shoring, and Ground Stability Safeguards (CR 13) 9.2 Temporary Works, Formwork, and Support Work Safety (CR 12) 9.3 Cranes, Material Hoists, and Mobile Plant Operations (CR 19, CR 22, CR 23, DMR 18)
10 Chapter 10: Site Infrastructure, Fire, Electrical & Occupational Health
10.1 Temporary Electrical Installations and Portable Electrical Tools (CR 24 & SANS 10142) 10.2 Fire Precautions, Flammable Store Management, and Housekeeping (CR 25, 27, 28, 29) 10.3 Occupational Health Hazards: Noise Zones, Hazardous Chemical Agents, and Facilities (CR 30)
11 Chapter 11: Incident Notification, Reporting & Statutory Investigations
11.1 Section 24 Reportable Incidents vs. Minor Work Injuries: Thresholds and Windows 11.2 Incident Scene Management, Evidence Preservation, and Witness Interviewing 11.3 Incident Investigation Methodologies (GAR 9, 5 Whys, Root Cause Analysis) and CAPA
12 Chapter 12: Emergency Preparedness, First Aid & Safety Culture
12.1 Site Emergency Preparedness Plans, Evacuation Drills, and Alarms (CR 29) 12.2 First Aid Requirements, Box Standards, and Emergency Medical Services (GSR 3) 12.3 Mandatory Site Induction, Worker Participation, and Refusal of Dangerous Work
13 Chapter 13: Health and Safety Management Systems and Governance
13.1 Health and Safety Management Systems: ISO 45001 and the Plan-Do-Check-Act Cycle 13.2 Health and Safety Policy, Organising, and the Section 16(2) Chain of Accountability 13.3 Documented Information, Internal Audit, and Management Review
14 Chapter 14: Health and Safety Performance, Auditing and Reviews
14.1 Measuring Health and Safety Performance: Leading Indicators, DIFR and LTIFR 14.2 Inspections, Audits and Legal Compliance Auditing 14.3 Non-conformance, Corrective Action and Continual Improvement
15 Chapter 15: Health and Safety Procurement, Cost and Contractor Management
15.1 Health and Safety in Procurement and Tendering 15.2 Health and Safety Cost Management: Pricing, Budgeting and the Cost of Failure 15.3 Contractor Management Through the Project Life Cycle
16 Chapter 16: Communication, Safety Culture and Technology
16.1 Health and Safety Communication Management and Reporting to Decision Makers 16.2 People, Safety Culture and Worker Participation 16.3 Innovation and Technology in Construction Health and Safety
17 Chapter 17: Occupational Hygiene, Medical Surveillance, Environment and Ergonomics
17.1 Hazardous Chemical Agents, Asbestos and Lead on Construction Sites 17.2 Medical Surveillance and the Annexure 3 Certificate of Fitness 17.3 Environmental Management on Construction Sites 17.4 Ergonomics, Manual Handling and Physical Agents
18 Chapter 18: Enforcement, Standards and Remaining High-Risk Construction Works
18.1 Enforcement: Inspector Powers, Notices, Inquiries and Penalties 18.2 Incorporated Standards, SANS and Personal Protective Equipment Selection 18.3 Demolition Work and Structural Stability 18.4 Tunnelling, Water Environments, Bulk Mixing Plant, Material Hoists and Explosive Actuated Devices 18.5 Hazard Identification Techniques and Permit-to-Work Systems
18.3 Demolition Work and Structural Stability
Key Takeaways Explain This Topic AI
CR 4(1)(c) requires an Annexure 2 notification at least 7 days before construction work that includes the demolition of a structure, with no size threshold.
CR 14(2) requires a detailed structural engineering survey by a competent person before any demolition work and expressly in order to ascertain the method, with the method statement then developed by that person.
CR 14(3) requires the CR 14(1) appointee to check structural integrity at intervals determined in the method statement, so a generic method statement cannot fix meaningful intervals.
CR 14(4) prohibits overloading floors with debris, working under unsupported overhanging material, and commencing work affecting services before they have been located and made safe.
CR 11(2) places a whole-of-life duty on the owner of a structure: periodic inspections by competent persons at least every six months for the first two years and thereafter yearly, with maintenance and records.
Last updated: September 2026
18.3 Demolition Work and Structural Stability
Note
SACPCMP Blueprint Context : Construction Regulation 14 (Demolition work) and Construction Regulation 11 (Structures) are core "Construction/Building Technology" content — item 16 of the Annexure B core knowledge list and one of the five CHSO Initial Professional Development Modules in Annexure C. Demolition also triggers a Regulation 4 notification in its own right, which makes it examinable from several angles.
1. Demolition Triggers a Notification
CR 4(1)(c) requires a contractor intending to carry out construction work that will include the demolition of a structure to notify the provincial director in writing on a form similar to Annexure 2 at least 7 days before that work is carried out — unless the project already requires a Regulation 3 construction work permit. There is no size threshold: demolishing a single-storey outbuilding triggers the notification just as a multi-storey strip-out does.
2. The Regulation 14 Sequence
Construction Regulation 14 sets out a sequence that a CHSO should be able to recite in order, because examination scenarios almost always turn on a step being taken out of order.
Step 1 — Appoint (CR 14(1)). A contractor must appoint a competent person in writing to supervise and control all demolition work on site .
Step 2 — Survey and method statement (CR 14(2)). Before any demolition work is carried out, and in order to ascertain the method of demolition to be used , a detailed structural engineering survey of the structure to be demolished must be carried out by a competent person, and a method statement on the procedure to be followed must be developed by that person. The survey drives the method; a method statement written before the survey has the logic backwards.
Step 3 — Monitor structural integrity during the work (CR 14(3)). During demolition, the competent person appointed under subregulation (1) must check the structural integrity of the structure at intervals determined in the method statement , in order to avoid premature collapse. The interval is not fixed by the regulation — it is fixed by the method statement, which is why a generic method statement is dangerous rather than merely inadequate.
Step 4 — Execute under CR 14(4). The contractor performing demolition work must:
Ensure no floor, roof or other part of the structure is overloaded with debris or material in a manner that would render it unsafe;
Take all reasonably practicable precautions to avoid collapse when part of the framing of a framed or partly framed building is removed, or when reinforced concrete is cut ;
Take precautions in the form of adequate shoring or other means necessary to prevent accidental collapse of any part of the structure or an adjoining structure;
Ensure that no person works under overhanging material or a structure which has not been adequately supported, shored or braced , and that any such support is designed and constructed strong enough to support the overhanging material;
Where the stability of an adjoining building, structure or road is likely to be affected, take steps to ensure its stability and the safety of persons;
Ascertain the location and nature of electricity, water, gas or other similar services which may be affected, and take the necessary steps to render circumstances safe before commencing work that may affect any such service;
Ensure every stairwell used and every floor where work is performed is adequately illuminated by natural or artificial means;
Provide convenient and safe means of access to every part of the structure where work is performed.
3. Where Demolition Intersects Other Regulations
Demolition is rarely governed by CR 14 alone, and the professional skill is seeing the whole set:
Interacting hazard Governing provision
Asbestos discovered or expected in the structure Asbestos Abatement Regulations, 2020; waste classification and disposal under the Waste Act 59 of 2008
- Lead-based coatings Lead Regulations, 2001
- Respirable crystalline silica from breaking and cutting Regulations for Hazardous Chemical Agents, 2021
Work at height on the structure being demolished CR 10 fall protection plan, including a rescue plan under CR 10(2)(e)
- Temporary propping of retained elements CR 12 temporary works, including the CR 12(1) temporary works designer
- Excavation of foundations and basements CR 13
- Mechanical demolition using high-reach plant CR 23 construction vehicles and mobile plant; exclusion zones
- Explosive demolition Explosives legislation; CR 4(1)(d) notification for use of explosives
Noise, dust and vibration to neighbours OHS Act section 9(1); NEMA duty of care; Air Quality Act; municipal by-laws
- Structural stability of the retained or adjoining structure CR 11(1)(a) and CR 14(4)(d)
- 4. Construction Regulation 11: Structures
Regulation 11 has two distinct halves and candidates frequently conflate them.
CR 11(1) — the contractor's duty. A contractor must ensure that:
all reasonably practicable steps are taken to prevent the uncontrolled collapse of any new or existing structure or part of it which may become unstable or is in a temporary state of weakness or instability due to the carrying out of construction work;
no structure or part of a structure is loaded in a manner which would render it unsafe; and
all drawings pertaining to the design of the relevant structure are kept on site and available on request to an inspector, other contractors, the client and the client's agent or employee.
CR 11(2) — the owner's duty. An owner of a structure must ensure that:
inspections of that structure are carried out periodically by competent persons in order to render the structure safe for continued use;
those inspections are carried out at least once every six months for the first two years and thereafter yearly ;
the structure is maintained so that it remains safe for continued use; and
the records of inspections and maintenance are kept and made available on request to an inspector.
Important
The CR 11(2) inspection cycle is a favourite examination item. Six-monthly for the first two years, then annually — and the duty falls on the owner of the structure, not on the contractor who built it. It is a post-construction, whole-of-life duty, and it is the reason the consolidated health and safety file handed over under CR 7(1)(e) matters so much: without the as-built and design information, the owner cannot brief a competent person to inspect intelligently.
5. A Worked Demolition Scenario
A contractor is engaged to demolish a 1970s four-storey reinforced concrete office block in a city centre, sharing a party wall with an occupied retail building.
Before anything happens : the client prepares a baseline risk assessment (CR 5(1)(a)) and health and safety specification (CR 5(1)(b)); the contractor gives at least 7 days' notice on Annexure 2 under CR 4(1)(c); the competent person is appointed in writing under CR 14(1); a detailed structural engineering survey is carried out and a method statement developed by that person under CR 14(2); an asbestos survey is completed and, if positive, removal proceeds under the Asbestos Abatement Regulations before structural demolition; services are located and isolated under CR 14(4)(e), with written confirmation from each utility.
Adjoining structure : because the party wall's stability will be affected, CR 14(4)(d) requires steps to ensure the stability of the adjoining structure and the safety of persons, and CR 11(1)(a) requires all reasonably practicable steps to prevent uncontrolled collapse. In practice this means a temporary works design under CR 12(1) for the propping, a monitoring regime, and agreement with the neighbouring occupier.
During the work : the CR 14(1) appointee checks structural integrity at the intervals fixed in the method statement (CR 14(3)); debris loading on suspended floors is controlled (CR 14(4)(a)(i)); nobody works under unsupported overhanging material (CR 14(4)(b)); floors and stairwells are illuminated (CR 14(4)(f)); safe access is maintained (CR 14(4)(g)); dust is suppressed at source, protecting both the workers and the neighbours under section 9(1) and the environmental regime.
The single most common failure in this scenario is beginning the strip-out before the asbestos survey is complete, which converts a controlled removal into an uncontrolled release affecting the workforce, the occupied neighbour and the public — and turns a programme problem into a notifiable health incident with a waste disposal chain to reconstruct after the fact.