Study guide
18.4 Tunnelling, Water Environments, Bulk Mixing Plant, Material Hoists and Explosive Actuated Devices
SACPCMP Construction Health & Safety Officer CHSO
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: South African Occupational Health and Safety Act (OHS Act 85 of 1993)
1.1 Scope, Purpose, and General Employer Duties (Sections 8, 9, 10) 1.2 Employee Duties, Rights, and Health & Safety Representation (Sections 14, 17, 18, 19, 20) 1.3 Corporate Governance, Accountability, and Mandatary Agreements (Sections 16, 37, 44)
2 Chapter 2: Construction Regulations 2014: Governance & Key Roles
2.1 Scope, Construction Work Permits, and Notifications (Regulations 1, 3, 4, Annexure 2) 2.2 Statutory Duties of Clients, Designers, and Principal Contractors (Regulations 5, 6, 7) 2.3 Site Supervision and Management Appointments (Regulation 8: CR 8(1), 8(2), 8(5), 8(7), 8(8))
3 Chapter 3: Compensation, Liability, and Administrative Regulations
3.1 Compensation for Occupational Injuries and Diseases Act (COIDA 130 of 1993) & Civil Liability 3.2 General Administrative Regulations (GAR) 2003: Reporting & Investigating Provisions 3.3 SACPCMP Statutory Mandate, Registration Rules, and Code of Conduct
4 Chapter 4: Risk Assessment Methodologies & Types
4.1 The Three Tiers of Construction Risk Assessment: Baseline, Issue-Based, and Continuous (CR 9) 4.2 Qualitative and Semi-Quantitative Risk Scoring (Probability, Severity, Matrix Evaluation) 4.3 Hierarchy of Risk Controls: From Elimination to Personal Protective Equipment
5 Chapter 5: Safe Work Procedures, Method Statements & Dynamic Risk
5.1 Developing Safe Work Procedures (SWPs) from Risk Assessments 5.2 Safe Work Method Statements (SWMS) and Task Execution 5.3 Daily Safe Task Instructions (DSTI), Toolbox Talks, and Dynamic Site Risk Management
6 Chapter 6: Health and Safety File & Planning Documentation
6.1 Client Health and Safety Specifications vs. Principal Contractor Health and Safety Plan 6.2 Structure, Contents, and Maintenance of the Site Health and Safety File (CR 7(1)(b), 7(2)(b) & 7(1)(e)) 6.3 Contractor Vetting, Approval, and Monthly Compliance Auditing (CR 5(1)(o) & CR 7)
7 Chapter 7: Statutory Registers, Checklists & Legal Appointments
7.1 Equipment and Plant Registers: Scaffolding, Ladders, and Portable Electrical Tools 7.2 Medical, Occupational Hygiene, and PPE Registers 7.3 Compiling, Signing, and Enforcing Legal Letters of Appointment on Site
8 Chapter 8: High-Risk Works: Working at Heights & Scaffolding
8.1 Fall Protection Plans, Fall Prevention, and Fall Arrest Systems (CR 10) 8.2 Scaffolding Erection, Tagging, and SANS 10085 Standards (CR 16) 8.3 Suspended Platforms, Boatswain's Chairs, and Rope Access (CR 17 & CR 18)
9 Chapter 9: Groundworks, Temporary Works & Heavy Operations
9.1 Excavations, Shoring, and Ground Stability Safeguards (CR 13) 9.2 Temporary Works, Formwork, and Support Work Safety (CR 12) 9.3 Cranes, Material Hoists, and Mobile Plant Operations (CR 19, CR 22, CR 23, DMR 18)
10 Chapter 10: Site Infrastructure, Fire, Electrical & Occupational Health
10.1 Temporary Electrical Installations and Portable Electrical Tools (CR 24 & SANS 10142) 10.2 Fire Precautions, Flammable Store Management, and Housekeeping (CR 25, 27, 28, 29) 10.3 Occupational Health Hazards: Noise Zones, Hazardous Chemical Agents, and Facilities (CR 30)
11 Chapter 11: Incident Notification, Reporting & Statutory Investigations
11.1 Section 24 Reportable Incidents vs. Minor Work Injuries: Thresholds and Windows 11.2 Incident Scene Management, Evidence Preservation, and Witness Interviewing 11.3 Incident Investigation Methodologies (GAR 9, 5 Whys, Root Cause Analysis) and CAPA
12 Chapter 12: Emergency Preparedness, First Aid & Safety Culture
12.1 Site Emergency Preparedness Plans, Evacuation Drills, and Alarms (CR 29) 12.2 First Aid Requirements, Box Standards, and Emergency Medical Services (GSR 3) 12.3 Mandatory Site Induction, Worker Participation, and Refusal of Dangerous Work
13 Chapter 13: Health and Safety Management Systems and Governance
13.1 Health and Safety Management Systems: ISO 45001 and the Plan-Do-Check-Act Cycle 13.2 Health and Safety Policy, Organising, and the Section 16(2) Chain of Accountability 13.3 Documented Information, Internal Audit, and Management Review
14 Chapter 14: Health and Safety Performance, Auditing and Reviews
14.1 Measuring Health and Safety Performance: Leading Indicators, DIFR and LTIFR 14.2 Inspections, Audits and Legal Compliance Auditing 14.3 Non-conformance, Corrective Action and Continual Improvement
15 Chapter 15: Health and Safety Procurement, Cost and Contractor Management
15.1 Health and Safety in Procurement and Tendering 15.2 Health and Safety Cost Management: Pricing, Budgeting and the Cost of Failure 15.3 Contractor Management Through the Project Life Cycle
16 Chapter 16: Communication, Safety Culture and Technology
16.1 Health and Safety Communication Management and Reporting to Decision Makers 16.2 People, Safety Culture and Worker Participation 16.3 Innovation and Technology in Construction Health and Safety
17 Chapter 17: Occupational Hygiene, Medical Surveillance, Environment and Ergonomics
17.1 Hazardous Chemical Agents, Asbestos and Lead on Construction Sites 17.2 Medical Surveillance and the Annexure 3 Certificate of Fitness 17.3 Environmental Management on Construction Sites 17.4 Ergonomics, Manual Handling and Physical Agents
18 Chapter 18: Enforcement, Standards and Remaining High-Risk Construction Works
18.1 Enforcement: Inspector Powers, Notices, Inquiries and Penalties 18.2 Incorporated Standards, SANS and Personal Protective Equipment Selection 18.3 Demolition Work and Structural Stability 18.4 Tunnelling, Water Environments, Bulk Mixing Plant, Material Hoists and Explosive Actuated Devices 18.5 Hazard Identification Techniques and Permit-to-Work Systems
18.4 Tunnelling, Water Environments, Bulk Mixing Plant, Material Hoists and Explosive Actuated Devices
Key Takeaways Explain This Topic AI
Construction Regulation 15 prohibits any person from entering a tunnel with a height dimension of less than 800 millimetres.
CR 26(1) requires provision both for preventing persons falling into water and for rescuing persons in danger of drowning, and CR 26(2) requires a person at risk of drowning to be provided with and to wear a lifejacket.
CR 20(7) imports the General Safety Regulations confined space precautions for entry into any silo, and CR 20(8) requires a record of all repairs and maintenance to bulk mixing plant available on site.
Material hoists require at least 900 mm over-travel above the highest landing, 2 100 mm enclosures and landing gates, daily inspection by a competent person appointed in writing, and CR 19(7) prohibits any person from riding absolutely.
CR 21(1)(d) requires an explosive actuated fastening device not to function unless held against the surface with a force of at least twice its weight and with the barrel not more than 15 degrees from a right angle.
Last updated: September 2026
18.4 Tunnelling, Water Environments, Bulk Mixing Plant, Material Hoists and Explosive Actuated Devices
Note
SACPCMP Blueprint Context : These are the Construction Regulations that appear least often in training material and therefore most often catch candidates out. Each is short, each is specific, and each carries at least one memorable number that examiners use.
1. Tunnelling (Construction Regulation 15)
Tunnelling work carries a distinctive combination of hazards: ground instability, restricted egress, atmospheric hazards, water ingress, plant in confined space, and dust in an enclosed volume where respirable crystalline silica concentrations climb rapidly.
The number every candidate should be able to quote is the height restriction:
CR 15 — "No person may enter a tunnel, which has a height dimension of less than 800 millimetres."
Tunnelling work also engages the confined-space precautions of the General Safety Regulations, ventilation and atmospheric monitoring, illumination, emergency egress and rescue planning, and — where excavation forms part of the works — the excavation duties in CR 13, including the CR 13(2)(h) inspection triggers and the CR 13(2)(j) requirement that confined-space precautions be complied with by any person entering any excavation.
2. Water Environments (Construction Regulation 26)
Regulation 26 is brief and absolute:
CR 26(1) — a contractor must ensure that where construction work is done over or in close proximity to water , provision is made for (a) preventing persons from falling into water ; and (b) the rescuing of persons in danger of drowning . CR 26(2) — where a person is exposed to the risk of drowning by falling into the water, the person must be provided with and wear a lifejacket .
Three points of professional emphasis:
The regulation requires both prevention and rescue provision — a rescue boat does not discharge the duty to prevent the fall, and edge protection does not discharge the duty to be able to rescue.
The trigger is over or in close proximity to water, which captures bridge works, river crossings, marine works, dam and reservoir works, and work adjacent to settling ponds and flooded excavations.
CR 26(2) is a "provided with and wears" duty — issue alone is not compliance. It is one of the few places in the Construction Regulations where the regulation itself addresses use rather than provision.
Rescue provision in practice means trained personnel, a means of reaching a person in the water quickly, throwing lines and buoyant aids at intervals along the work front, communication, and — for tidal or flowing water — an assessment of current and recovery point.
3. Bulk Mixing Plant (Construction Regulation 20)
Bulk mixing plant on a construction site — batching plants and their silos, conveyors and feed systems — combines mechanical entanglement, engulfment in stored material, dust and traffic hazards.
Two provisions to know:
Construction Regulation 20(7) requires that the precautionary measures stipulated for confined spaces in the General Safety Regulations, 2003 are complied with when entering any silo . Silo entry is engulfment territory and the leading cause of bulk-material fatalities worldwide.
Construction Regulation 20(8) requires the contractor to ensure that a record is kept of all repairs or maintenance to a bulk mixing plant and that the record is available on site to an inspector, the client, the client's agent or any employee.
4. Material Hoists (Construction Regulation 19)
Material hoists move material, not people, and Regulation 19 is emphatic about that distinction. The specific figures are examinable:
- Requirement Figure Provision
- Over-travel clearance above the highest landing at least 900 mm CR 19(2)(a)
Enclosure at the bottom and at floors where persons are at risk of being struck at least 2 100 mm high CR 19(2)(b)
Door or gate at each landing, kept closed except when the platform is at rest at that landing at least 2 100 mm high CR 19(2)(c)
- Notice at the base of the tower and at each landing maximum mass load, and the prohibition on riding CR 19(5)
- Riding on a material hoist prohibited outright CR 19(7)
- Operator must be competent in the operation of that hoist CR 19(6)
- Inspection daily by a competent person appointed in writing CR 19(8)(a)
The tower must be erected on firm foundations and secured to the structure or braced by steel wire guy ropes (CR 19(2)(a)); the platform must be designed so that it safely contains the loads and so that the combined mass of platform and load does not exceed the designed lifting capacity (CR 19(3)(a)); the hoisting rope of a hoist with a remote winch must be protected from external damage between the winch and the tower (CR 19(3)(b)); and every material hoist must have an efficient brake capable of holding the platform with its maximum load in any position when power is not supplied (CR 19(3)(c)). Trucks, barrows and material may not be conveyed unless secured or contained so that displacement cannot occur during movement (CR 19(4)).
Warning
CR 19(7) is absolute: no contractor may require or permit any person to ride on a material hoist. There is no exception for a short lift, for a supervisor, or for an emergency. Where people must be moved vertically, the equipment required is a passenger or goods-passenger hoist certified for that purpose — and note that under DMR 18(8) no user may require or permit any person to be moved or supported by means of a lifting machine unless it is fitted with a man-cage designed and manufactured to an approved SANS standard approved by an inspector, after a risk assessment has been done.
5. Explosive Actuated Fastening Devices (Construction Regulation 21)
Cartridge-operated nail guns are among the most commonly misused tools on South African sites, and Regulation 21 is precise.
CR 21(1) — no contractor may use, or permit any person to use, an explosive actuated fastening device unless:
- the user is provided with and uses suitable protective equipment;
- the user is trained in the operation, maintenance and use of such a device;
the device is provided with a protective guard around the muzzle end which effectively confines any flying fragments or particles; and
the firing mechanism is designed so that the device will not function unless it is held against the surface with a force of at least twice its weight , and the angle of inclination of the barrel to the work surface is not more than 15 degrees from a right angle .
CR 21(2) — the contractor must further ensure that only cartridges suited to the relevant device and the work are used, and that the device is cleaned and examined daily before use , and as often as may be necessary for its safe operation, by a competent person appointed in writing for that purpose.
The two numbers to carry into the examination are twice its weight and 15 degrees from a right angle .