TP Technicien de Maintenance CVC

TP Technicien de Maintenance CVC (France)

Expansion Vessels SafetyEnglish
Exam overview

Practice session

A closed heating installation has its expansion vessel located in the ground floor boiler room. The vertical distance between the expansion vessel connection and the highest radiator in the building is H_stat = 15 meters. What is the correct nitrogen pre-charge pressure (P0) to set in the expansion vessel (with the water side completely depressurized) before filling the installation?

Loading your practice session…