Study guide

ARE 5.0: CE study guide

Read a lesson, then practice the ideas you want to remember.

Lessons

  1. Architect's Authority, Limitations & Standar
  2. AIA G711 Architect's Field Reports & Observa
  3. Architect as Initial Decision Maker & Neutra
  4. Conducting Site Visits & Field Documentation
  5. Total Building Commissioning & Envelope Veri
  6. Post-Occupancy Evaluation & Performance Metr
  7. Eleven-Month Warranty Walkthrough & Design F
  8. Non-Conforming Work: Rejection, Notice, Corr
  9. Construction Schedules, Critical Path Method
  10. Specification Conformance, Division 01 & Con
  11. Uncovering Work & Concealed / Unknown Subsur
  12. Alternates, Allowances & Unit Prices — Free Study Guide 2026
  13. Bid Evaluation, Bonds & Bidder Responsibilit
  14. Contractor Qualification & Evaluation Criter
  15. Owner-Contractor Agreements & Contract Docum
  16. Architect's Supplemental Instructions — Free Study Guide 2026
  17. Construction Change Directives — Free Study Guide 2026
  18. Change Orders & Contract Adjustments — Free Study Guide 2026
  19. Requests for Information & AIA G716 Administ
  20. Closeout Submittals: O&M Manuals, Record Dra
  21. Final Inspection, Final Payment Issuance & M
  22. Mechanics' Liens, AIA G706, G706A & G707 Con
  23. AIA G702 & G703 Application and Certificate
  24. Seven-Day Review Timeline & Legal Effects of
  25. Retainage Rules & Off-Site Stored Materials
  26. Schedule of Values Preparation & Review
  27. AIA A701 Instructions to Bidders & Bidding R
  28. Architect's Preconstruction Responsibilities
  29. Project Delivery Methods & Construction Admi
  30. Pre-Bid Conferences, Site Visits & Document
  31. Field Code Compliance, Accessibility Standar
  32. Hazardous Materials Discovery, Environmental
  33. IBC Chapter 17 Special Inspections, Testing
  34. Sustainability Standards, Mock-Ups & Buildin
  35. Delegated Design Responsibilities & Professi
  36. Physical Mock-Ups, Testing Reports & Certifi
  37. Shop Drawings, Product Data, Samples & Actio
  38. Submittal Schedules & Contractor Review Prot
  39. Partial Occupancy, Phased Handover & Facilit
  40. Punch List Preparation & AIA G704 Certificat
  41. Substantial Completion: Legal Definition & T
  42. Claims Procedures, 21-Day Notice & Damage Li
  43. Termination or Suspension of the Contract
  44. Dispute Resolution: IDM, Mediation, Arbitrat
  45. Legal Grounds for Withholding Payment Certif