Lessons
- CA Accessibility Framework: CBC Chapter 11B
- Accessible Restrooms, Signage, Scoping, and
- Accessible Routes, Entrances, Parking, and S
- Architect's Stamp, Signature, and Profession
- Licensing, Board Authority, and Unlicensed P
- Mandatory Written Contracts & Required Provi
- CALGreen Mandatory Nonresidential & Resident
- Life-Cycle Cost Analysis & Value Engineering
- Building Systems Integration: MEP Coordinati
- Energy Code Compliance Approaches: Prescript
- Mandatory Energy Measures: Envelope, HVAC, L
- Flood Hazard Zones & CA Wind Exposure Catego
- Seismic Hazard Mapping: Alquist-Priolo Earth
- Wildland-Urban Interface & Fire Hazard Sever
- Fire and Smoke Protection Features, Fire Bar
- CA Health and Safety Code: Building Standard
- Means of Egress, Occupant Load Calculations,
- Occupancy Classifications, Building Heights,
- CEQA Regulatory Framework: Lead, Responsible
- CEQA Process: Statutory & Categorical Exempt
- Environmental Impact Reports & Official Fili
- Clean Air Act & Clean Water Regulations
- CA Coastal Commission & Coastal Development
- Local Coastal Programs, Coastal Zone Boundar
- Construction Changes: Change Orders, CCDs, A
- Pre-Construction & Pre-Installation Meetings
- Periodic Site Observations, Field Reports &
- Shop Drawings, Submittals & Architect's Defe
- Authority Having Jurisdiction Hierarchy, Loc
- CD Content, Detailing & Inter-Disciplinary C
- Reconciling Conflicting Codes, Standards, an
- Consultant Selection, Prime-Consultant Agree
- Project Delivery Methods & Impact of Project
- Standard Owner-Architect Agreements & CA Pra
- Project Close-Out, Payment Applications, Ret
- Construction Industry Standards, Detailing &
- Post-Construction Services, Record Documents
- Special Inspections, Testing & DSA/HCAI Cont
- Mechanics Liens, Recording Deadlines & Impac
- 20-Day Preliminary Notice Requirements & Tim
- Stop Payment Notices, Payment Bonds & Design
- Permitting Procedures, Plan Check Review, Ag
- Phased Permitting, Deferred Approvals, Encro
- Copyright, Instruments of Service & Ownershi
- Permissible Business Entities, Firm Names, a
- Rules of Professional Conduct & Disciplinary
- CA Prevailing Wage Requirements, DIR Registr
- Public Works Bidding, Competitive Bidding Th
- Subletting and Subcontracting Fair Practices
- Dispute Resolution in CA Practice: Mediation
- Professional Standard of Care & Managing Con
- Project Scheduling, Budgeting Assumptions, a
- The Discretionary Approval Process: Use Perm
- Entitlement Exhibits, Conditions of Approval
- Local Land-Use Control: General Plans, Zonin
- Programming, Schematic Design Development &
- Site Feasibility Studies, Existing-Condition
- Division of the State Architect: Field Act &
- Essential Services Buildings Seismic Safety
- Department of Health Care Access and Informa