Study guide
ARE 5.0 study guide
Read a lesson, then practice the ideas you want to remember.
Lessons
- The Six Divisions: Items, Durations, Section
- Eligibility, PSI Delivery, Fees, Scheduling
- Cut Scores, Score Reports, Provisional Feedb
- Item Types, Case Studies, Exam Tools, Breaks
- Education Standard, AXP Hours, Settings & Re
- The NCARB Record, Score Validity Policy & Re
- Business Structures, Firm Ownership Rules &
- Ethical Standards, the NCARB Rules of Conduc
- Assessing Practice Resources: Staffing, Deve
- Regulating the Work Environment: FLSA, Antid
- Accrual vs. Cash Accounting & the Architectu
- Utilization, Overhead, Break-Even & Net Mult
- The Income Statement, Net Operating Revenue
- Liquidity, Solvency & Reading Firm Financial
- Client Requests, Compensation Methods, Proje
- Contractual Risk Allocation, Intellectual Pr
- Risk Management & the Firm’s Insurance Portf
- AIA C401: Flow-Through, Consultant Standard
- Consultant Selection, Qualifications-Based S
- Allocating & Managing Project Resources: Hou
- Assembling the Project Team: Roles, Authorit
- Monitoring the Project Budget with Earned Va
- Critical Path Calculations, Float & Schedule
- Project Communication: Paths, Instruments, M
- The Project Work Plan & Phase Fee Allocation
- Scope Creep, Additional Services & Written A
- Work Breakdown Structures, Scheduling Method
- A201: Architect Administration, Changes, Cla
- The Owner-Contractor Agreement & A201 Contra
- AIA B101: Initial Information, Standard of C
- B101: Owner Duties, Cost of the Work, Copyri
- Documenting a Project for the Specified Deli
- Quality Assurance, Quality Control, Construc
- Regulatory Compliance, Authorities Having Ju
- Climate Classification, Solar Geometry & Pas
- Environmental Due Diligence: CERCLA Liabilit
- Microclimate, Wind, Topography, Grading & Si
- Vehicular Circulation, Access Management, Pa
- Soil Mechanics, Geotechnical Investigation &
- IBC Construction Types, Fire-Resistance Rati
- IBC Occupancy Classification, Mixed Occupanc
- Pedestrian Circulation, Site Utilities & Con
- Zoning Authority, Euclidean and Form-Based C
- Non-Conforming Uses, Variances, Easements &
- Adjacency Matrices, Bubble Diagrams, Blockin
- Reviewing Project Budget & Schedule Feasibil
- Evaluating an Existing Building Against a Pr
- Programming Methodology, Net vs. Gross Area
- Identifying Building & Structural System Alt
- Accessible Routes, Slopes, Protruding Object
- IBC Allowable Area: Tabular Area, Frontage &
- Door Clearances, Operating Hardware & Access
- Means of Egress Components & Occupant Load C
- Exit Count, Remoteness, Egress Capacity, Tra
- Building Height, Story Limits, Mixed Occupan
- Building Siting, Neighborhood Context, Zonin
- Electrical Distribution, Emergency Power, Li
- Fire Suppression, Standpipes, Conveying, Sec
- HVAC System Typologies, Spatial Allocation &
- Lateral Force-Resisting Systems, Wind Loads
- Potable Water Supply, Drainage, Waste & Vent
- Selecting Structural Systems: Steel, Concret
- Thermal Comfort, ASHRAE Standard 55 & Psychr
- Galvanic Compatibility, Thermal Movement & M
- Cost Estimating by Phase & Contingency Plann
- Envelope Thermodynamics, Heat Transfer & Fen
- Life-Cycle Cost Analysis, Present Value & Va
- Life Cycle Assessment, Embodied Carbon & Mat
- Material Selection Criteria, Fire Performanc
- Passive Solar Heating, Natural Ventilation &
- Thermal Bridging, Continuous Insulation & Th
- Flashing, Parapets, Copings & Roof Penetrati
- Low-Slope Roofing Systems, Membranes & Drain
- Enclosure Control Layers & Rain Screen Cladd
- Steep-Slope Roofing & Below-Grade Waterproof
- Vapor Retarders, Permeance Classes & Dew Poi
- Sound Isolation, STC, NRC & Reverberation Ti
- Concrete Reinforcing, Cover & Building Movem
- Door and Frame Construction & Fire Door Asse
- Hardware Functions, Fire-Protection vs. Fire
- Sizing Structural, Mechanical, Electrical &
- Interior Partition Framing, Head-of-Wall Det
- Ceiling Plenum Coordination, Clash Detection
- Vertical Chases, Shaft Walls, Through-Penetr
- Structural Steel Connections & Base Plate De
- Drawing Cross-Referencing, Coordination & Re
- The Project Manual & CSI MasterFormat Divisi
- Quantity Takeoff Estimating, General Conditi
- Section Numbering & the CSI Three-Part Secti
- The National CAD Standard, Sheet Modules & T
- Documenting Site Features: Survey, Civil, Gr
- Specification Methods & Document Precedence
- Addenda Mechanics & Surety Bonds — Free Study Guide 2026
- Alternates, Allowances, Unit Prices & Contra
- Bid Opening, Bidder Qualification & Discrepa
- The Preconstruction Conference & Administrat
- Procurement Methods & AIA A701 Instructions
- Submittal Schedules, Long-Lead Items, Permit
- Change Orders, Construction Change Directive
- Delegated Design, Design-Assist & Deferred S
- Rejecting Non-Conforming Work, Special Inspe
- Requests for Information & Architect’s Suppl
- The Architect’s Site Observation Role & the
- Submittal Workflow, Review Responsibility &
- Final Completion, Final Payment & the Closeo
- The Certificate of Substantial Completion &
- The Schedule of Values & the Application and
- Stored Materials, Retainage, Certification D
- Substantial Completion & the Punch List Prot
- Warranty Administration, the Eleven-Month Wa